DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project.

Slides:



Advertisements
Similar presentations
Surface Water & Ground Water
Advertisements

Sources of water (RAIN)
CONSTRUCTION DRILLING INC.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Dublin Port Tunnel Xiaowei Jin, Xinni Wang, Mingqiu Mao.
A3 - dual carriageway link between London and Portsmouth 6.5km new road, 1.77km in bored tunnel £371 million Construction started January 2007 Project.
An-Najah National University Faculty of Engineering Civil Engineering Department Graduation Project Foundation Design for Western Amphitheater of Nablus.
Measurement for Civil Engineering works
Post Graduated Master Course TUNNELLING AND TUNNEL BORING MACHINES Subject of the lesson : RME238 series Metro Seville Lecturer : René Raúl Ramírez.
PIPE CULVERT By CH. VENKATARAMAIAH.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
1 SOME ROCK UNDERGOES CHANGE CAUSED BY HEAT, PRESSURE, PLASTIC FLOW SOME ROCK BREAKDOWN, DETERIORATES,DECOMPOSES TO BECOME SOIL.
Tunnelling Methods.
Yellow River Diversion Project Use of Tunnel Boring Machines to Divert the Yellow River, China John Train & Philippa Reed.
GEO-MECHANICS (CE2204) Soil Stress and Pore Water Pressure
The specification states that you need to be able to: The specification states that you need to be able to: Define and explain the following terms: Define.
GROUNDWATER CONTROL.
Project details • New headquarters for HKSB
Mi.ttu.ee RISK ASSESSMENT OF GEOLOGICAL CONDITIONS FOR SELECTIVE EXTRACTION OF OIL SHALE IN “ESTONIA” MINE S. Sabanov & J.-R. Pastarus Tallinn University.
ENGINEERING GEOLOGY OF THE CHANNEL TUNNEL Richard Rae & Robert Hazelhurst March 2006.
The Boulou Fault Zone Its Geology and its Impacts on the Perthus Tunnel project The Boulou Fault Zone Eastern Pyrenees, France Its Geology and its Impacts.
Northumberland Strait Crossing Confederation Bridge New Brunswick, Canada Will Astley Jonathan Richards.
Rion-Antirion Bridge, Greece. Presented by James Mitchell, Dan Bundy and Hung Nguyen.
Geological Problems Encountered and Solutions Implemented
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
SESSION 3 Subgrade This module presents the concepts and methods of characterizing the subgrade for the purpose of concrete pavement design. It also highlights.
Land-Use Planning and Engineering Geology Chapter 19.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.
Pike River Coal Mine ACARP Presentations August 2008 Peter Whittall – General Manager, Mines PIKE RIVER COAL.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
Foundation Engineering CE 483
Footings.
Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010 Case Study Session
SOILS ONE OF THE MOST IMPORTANT SUBSTANCES IN THE WORLD!
Sources of water (RAIN)
Hydrology & Water Resources Engineering
Who Can Plug an Abandoned Well. Overview Introduce the common methods used to construct wells. Discuss the different types of wells Discuss what types.
Slop Stabilization Pertemuan
ROAD WITHOUT DRAIN A GREAT DISASTER - A case Study By Er. Nandanandan Das Ex. E.I.C cum Secretary, Works, Govt. Of Odisha 1.
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
Department of Civil Engineering,
Prepared by: Marcia C. Belcher Construction Engineering Technology.
Earls Mill Road Retaining Wall Ground Anchors and Strengthening.
Geo-Engineering In North Wales A Study of the A55 Between Chester and Anglesey.
Scenarios 1.Tidal influence 2.Extreme storm surge (wave overtopping, max. limit 200 l/s/m, period 2 h) Outlook calibration and validation of 3D model transfer.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
The Geological History of Toronto and the GTA. Toronto’s Geological History The oldest rocks in southern Ontario are up to 1.5 billion years old and are.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
By: Rick Ayers Yates County Soil & Water Conservation District
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
CHAPTER SEVEN INTRODUCTORY WELL HYDROLOGY. GROUNDWATER OCCURRENCE.
Understand foundation design and construction
The specification states that you need to be able to: The specification states that you need to be able to: Define and explain the following terms: Define.
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
Traffic engineering Építés- és környezetföldtan 4. Engineering and Environmental Geology.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
Earth History Sandstone & Shale Formation. Basin An area of relative low elevation where water and sediments collect.
Hoover Dam Construction. Geological Context Canyon’s tilted layers of andersite breccias Extrusive igneous rock Minerals - plagioclase, pyroxene & hornblende.
PRESENTED BY- Namrata M. Lolge (09CM16F) M. Tech. 1 st sem NITK.
What happens to the eroded debris? Glaciers pick up and transport a huge load of debris as they slowly advance across the land. Ultimately, these materials.
DIAPHRAGM WALLS.
Water Underground Chapter 11 section 3. How does water move underground? Like surface water, underground water generally comes from precipitation. Water.
Fdeng Civil Engineering Technology
Investigation of Road Project By S.N. Nanaware
Investigation of Road Project
Groundwater Basics.
N.N.Som Consulting Geotechnical Engineer
Graduation Project Bracing system for deep excavation.
Presentation transcript:

DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project

I. Summary of Project Scheme H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project Located In Dublin, Ireland. Twin Bore Road Traffic Tunnel Part of M50. Direct Link to Dublin Port from M1 Motorway thus Relieves Congestion in City Centre by Diverting HGVs. Approx. €752 Million to build.

II. Geological Context H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project The typical geological formations of the route are: Inter- bedded Carboniferous limestone, shale’s and mudstones, known locally as the Calp. Overlain by glacial deposits of boulder clay. North of the main shaft, the tunnel had a full face of boulder clay. At the Southern end of the alignment,estuarine and alluvial silts, sands and gravels are underlain by boulder clay.

II. Geological Context H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project The typical geological formations of the route are: Inter- bedded Carboniferous limestone, shale’s and mudstones, known locally as the Calp. Overlain by glacial deposits of boulder clay. North of the main shaft, the tunnel had a full face of boulder clay. At the Southern end of the alignment,estuarine and alluvial silts, sands and gravels are underlain by boulder clay.

II. Geological Context H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project The typical geological formations of the route are: Inter- bedded Carboniferous limestone, shale’s and mudstones, known locally as the Calp. Overlain by glacial deposits of boulder clay. North of the main shaft, the tunnel had a full face of boulder clay. At the Southern end of the alignment,estuarine and alluvial silts, sands and gravels are underlain by boulder clay.

II. Geological Context H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project The typical geological formations of the route are: Inter- bedded Carboniferous limestone, shale’s and mudstones, known locally as the Calp. Overlain by glacial deposits of boulder clay. North of the main shaft, the tunnel had a full face of boulder clay. At the Southern end of the alignment,estuarine and alluvial silts, sands and gravels are underlain by boulder clay.

III. Detailed Geology H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project The boulder clay comprises stiff clay interspersed with boulders of up to 750mm in size and contains isolated lenses of saturated sands and gravels under confined hydrostatic pressure. The limestone has a medium strength of 150Mpa. However localised areas of mudstone and shale bands can reduce this to 25Mpa, with regions of pure limestone reaching 250MPa. Due to the north-south flow of the hydrological regime, along the route artesian water pressures are anticipated in the limestone. The water table lies 1m below ground surface over the entire tunnel route.

IV. Problems Encountered H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project Change of geology, plus isolated areas of saturated sands/gravels and localised areas of mudstone, created various problems. During construction of diaphragm wall limestone rock heads were encountered. In Boulder clay, melt water deposits were encountered causing over excavation.

V. Alternative Methods H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project NATM method – originally proposed however concern after Heathrow Express Tunnel Collapse. Surface road was not feasible as did not meet project aim. Explosive charges.

VI. Solutions - Overview H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project Total project length is 5.6km. Tunnel built in 4 Distinct Sections: Two cut and cover sections. Southern section 600m long. Northern section extends over 1500m. Two bored sections. One through 650m of boulder clay. One through 2600m of hard limestone.

VII. Solutions - TBMs H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project Due to mixed geology two TBMs were required. Shielded Hard Rock TBM was used for the Carboniferous Limestone (Hard Rock). Shielded, with partial face extraction, TBM was used for the Boulder Clay.

VIII. Solutions - Cut and Cover H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project A typical Cut and Cover section comprises two Reinforced Concrete Tunnels with a width of 26m. However localised geology dictated different slope support methods in order to prevent collapse of the dig. Methods of support were: Diaphragm walls (1.2m thick). Soil nails and Shotcrete.

IX. Solutions - Cut and Cover H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project Diaphragm walls used for deeper parts of the excavation and typically m thick: Northern section used 300m diaphragm walls and an average depth of 20m. Southern section used 600m diaphragm walls. Soil nails and Shotcrete: Technique followed the Northern 300m section of diaphragm walls. Retained a 1300m cut using 25mm and 32mm diameter soil nails 8 – 11m long with shotcrete.

Thank you for Listening H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project References: Dublin Port Tunnel Authority Dublin City Council Arup Institute of Civil Engineers Nishimatsu Website on the Dublin Port Tunnel Project, tunnelling contractor Department of Transport, Ireland Herrenknecht, manufacturers of TBMs, company website