26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.

Slides:



Advertisements
Similar presentations
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Advertisements

Ray Larsen Chris Adolphsen Chris Nantista ARD Division SLAC National Accelerator Lab ILC GDE Meeting Beijing March
SLAC uTCA review 4-5 June 2012 Anders J Johansson Lund University Some slides from Zheqiao Geng and Tom Himel)
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
The Implementation Strategy Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets 1 Cooling Unit.
Shelf Management & IPMI SRS related activities
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Messages from our friends a few slides about xTCA projects of colleagues that did not manage to come to Perugia M. Joos, CERN17th meeting of the xTCA IG.
Development of an ATCA IPMI Controller Mezzanine Board to be used in the ATCA developments for the ATLAS Liquid Argon upgrade Nicolas Dumont Dayot, LAPP.
Overview of the LLRF Activities at SLAC
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
The planned new system Tom Himel Dec 1, Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of.
Introduction to mTCA and LLRF review Tom Himel June 4,
About Samway Electronic SRL Founded in 2005 in Bucharest, Romania Focused on management and monitoring solutions for telecom/industrial computers Active.
XTCA working group M. Hansen, CERN. xTCA Owned by PICMG (PCI Industrial Computer Manufacturers Group) ATCA (2002, 2007) – Advanced Telecommunications.
INTRODUCE OF SINAP TIMING SYSTEM
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
XTCA activities at CERN Markus Joos PH-ESE xTCA interest group – Background – Report of the 2 nd meeting (held on 7.3.) uTCA evaluation and AMC development.
Pulsar II Hardware Overview Jamieson Olsen, Fermilab 14 April 2014
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Tomasz Czarski, Maciej Linczuk, Institute of Electronic Systems, WUT, Warsaw LLRF ATCA.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
1 Application of New PICMG µTCA for Physics Specifications to Accelerator Control Ray Larsen, SLAC & Kay Rehlich, DESY TWEPP 2010 Workshop Aachen, Germany.
LAr ROD R&D for sLHC Charlie Armijo, Joel Steinberg, Ken Johns (University of Arizona) Joe Mead, Hucheng Chen, Francesco Lanni (BNL) Luis Hervas (CERN)
The design of HEPS digital BPM electronics BI Group, accelerator division.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
SLAC ILC High Availability Electronics R&D LCWS IISc Bangalore India Ray Larsen, SLAC Presented by S. Dhawan, Yale University.
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Slide ‹Nr.› l © 2015 CommAgility & N.A.T. GmbH l All trademarks and logos are property of their respective holders CommAgility and N.A.T. CERN/HPC workshop.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
AGM-2011 On behalf of CO/FE F.Locci - December 15 th, 2011.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M.
Standard electronics for CLIC module. Sébastien Vilalte CTC
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
XTCA Workshop Topic Suggestions Ray Larsen, SLAC TWEPP 2010 Workshop Aachen, Germany September 22, 2010.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
Page Beam Instrumentation mini- workshop Conclusions from the Hardware, Timing and MPS mini-workshop Lund, Miha Reščič Deputy Head of
ORNL is managed by UT-Battelle for the US Department of Energy Low Level RF Status and Development Activities at the Spallation Neutron Source Mark Crofford.
SLAC to the Future Dan Van Winkle, Joe Frisch, Bo Hong, Jim Sebek, Charlie Xu, Andrew Young LLRF Activities at SLAC.
Heung-Sik Kang Pohang Accelerator Laboratory
RF Control Electronics for Linacs Overview of activities at Electronics Division, BARC RF control electronics for: 1.Super-conducting Heavy Ion Linacs.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź, DMCS ATCA LLRF project review, DESY, 3-4.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
LLRF development of SSRF RF Group and Linac Group
Andrew Young SLAC TID-AIR Technology Innovation Directorate
MicroTCA Development and Status
The SLAC Instrumentation and Control Platform
Design of an AdvancedTCA board Management Controller Solution
LIU – SPS Low level RF Updates and schedule G. Hagmann,
New xTCA Developments at SLAC
MicroTCA Common Platform For CMS Working Group
LLRF Controls Outline Requirements External Interfaces Schedule Design
LLRF and Beam-based Longitudinal Feedback Readiness
Breakout Session SC3 – Undulator
Presentation transcript:

26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments at SLAC - R. Larsen

26-Sep-11 2 Lexicon xTCA – Includes large board ATCA system favored by Telecom and small board AMC MicroTCA shelf with extensions for Physics AMC – Advanced Mezzanine Card in MicroTCA or ATCA Carrier Board RTM, μRTM – Rear Transition Module for ATCA or MicroTCA IPMI – Intelligent Platform Management Interface, core feature of xTCA managed systems SM – Shelf Manager card, 2 used in redundant shelf, non-payload slot LCLS – Linac Coherent Light Source newest generation light sources at SLAC, LCLSI operating, LCLSII approved for construction start 2013 BPM – Accelerator Strip-line or Cavity Beam Position Monitor, typically 4 channels with online calibration between beam pulses PICMG3.8 – New Physics standard for interface from ATCA to RTM MTCA.4 – Complete new 2-wide AMC standard with RTM for MicroTCA AIP – Accelerator Improvement Program New xTCA Developments at SLAC - R. Larsen

26-Sep-11 3 I. Standards Progress Hardware, Software Technical Committees formed under PICMG 2 new HW standards approved –ATCA PICMG3.8 Standard IO interface to Rear Transition Module (RTM), IPMI extension & power connector –MTCA MTCA.4 Crate, 2-wide AMC & RTM, IO interface, IPMI extension and power pins designated New xTCA Developments at SLAC - R. Larsen

26-Sep-11 4 Standard Extensions for Physics New xTCA Developments at SLAC - R. Larsen

26-Sep New xTCA Developments at SLAC - R. Larsen PICMG3.8 RTM Interface Standard Rear View IO Channels (3x40) IPMI, Power Connector (blue) 2 Mechanical Keys Courtesy M. Huffer, SLAC

26-Sep-11 6 Emerging New Electronics Standards - R. Larsen MTCA.4 Prototype Shelves & Modules

26-Sep-11 7 MTCA Slot Shelf Dual Star New xTCA Developments at SLAC - R. Larsen 12 Payload AMC-RTMs Dual Star Redundant Front View Back- Plane Dual PU slot Dual MCH Slot

26-Sep-11 8 II. SLAC xTCA Initiatives Major SLAC program is Linac Coherent Light Source (LCLS) Machines –LCLSI (now operating using last1/3 of main linac) –LCLSII (just approved, using middle 1/3 of linac) –Each machine supports 6 or more large experimental areas (much larger than storage ring light source experiments) –Linac machine instrumentation needs lots of upgrades via Accelerator Improvement Programs (AIPs) New xTCA Developments at SLAC - R. Larsen

26-Sep-11 9 SLAC Initiatives 2 Experimental Areas –ATCA Massively Parallel Processors (MPP) generic module already deployed in several LCLSI experiments; 2 nd generation MPP using new PICMG 3.8 interface Linac RF & Controls –MTCA.4 demonstrations in development include Reduced RF phase jitter to ~30 femtoseconds Klystron FPGA-based interlocks Beam Position Monitors for LCLSII Injector New xTCA Developments at SLAC - R. Larsen

26-Sep xTCA Status LLRF for Main Linac S-Band 50MW station –Prototype developed, accelerator test planned for October 2011 (AIP program) –Struck digitizer AMC w/ SLAC designed RTM Klystron Interlocks –Prototype development near completion, test planned on L-Band test station Q1-2 FY12 –TEWS FPGA AMC w/ SLAC designed RTM BPM System –AIP program approved, commercial AMC digitizer w/ SLAC designed RTM, requirements in development New xTCA Developments at SLAC - R. Larsen

26-Sep LLRF MTCA & RF Chassis Testing New xTCA Developments at SLAC - R. Larsen MTCA.4 6-slot with AMC FPGA digitizer, timing, processor controlling intra-pulse feedback loop RF head- end chassis in bench test RTM Section AMC Section μRTM rear view

26-Sep RTM 10 Ch ADC-DAC, IPMI Interface Emerging New Electronics Standards - R. Larsen Rear Panel 25 MHz IF Signals In RF Ref In Trigger in Dual I&Q DAC Out Courtesy A. Young, SLAC

26-Sep RTM FPGA Interlocks Emerging New Electronics Standards - R. Larsen REAR PANEL INPUTS DC and pulsed signals 2 KSps and 60 MSps 12bit digitizers on board OUTPUTS Multiplexed serial to AMC via RTM interface Works for short pulse or long pulse machines Courtesy D.G. Brown, SLAC

26-Sep BPM System Block Diagram New xTCA Developments at SLAC - R. Larsen Courtesy S. Hoobler et al, private communication EVR – Event Receiver (trigger over serial network) ADC – AMC BPM digitizer & FPGA processor, Industry units AFE – Analog Front End RTM (buffers, filters, calibration circuits

26-Sep Conclusions PICMG3.8, MTCA.4 are major milestones Software work continues –Guidelines on architecture, protocols; need active feedback from user case studies SLAC Initiatives –ATCA Generic Massively Parallel Processors working in LCLSI experiments, Improved version in process –MTCA Opportunities underway to evaluate for three major subsystems –Industry providing infrastructure modules and key applications modules, SLAC designing first RTMs successfully Goal is readiness for major LCLS system upgrades –Both lab and Industry COTS solutions critical New xTCA Developments at SLAC - R. Larsen