May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.

Slides:



Advertisements
Similar presentations
Presentation to ODOT Planners April 25, 2012 Bill Johnston – Area 1 Planner (Astoria) US 101: Camp Rilea to Surf Pines Lane Facility Plan.
Advertisements

Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
By: Vanessa Victor Scott Yoshida Travis Hills Lucas Sprague.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
NH Route 28 Corridor Safety Audit Preliminary Analysis of Historic and Existing Conditions.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Traffic Signal Warrants
SAFETY FUNDING APPLICATION STA STA-62 & Harrisburg/Middlebranch and Harrisburg Rd & 30 th St. Safety Improvements.
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
The Roads Ahead Leroy D. Alloway, Director Community Development.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
9-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise C – Session #9.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
STA Safety Project PID #76439 December 12, 2006.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
STA US-30 Presentation for TRAC – October 13, 2015
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Keith Smith, P.E. ODOT District 8 Environmental Engineer October 2015.
California’s Experience with HFST 1.  Overview  Challenging Locations  Collision Reduction (State and Local Roads)  Typical Placement and current.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Assistant City Traffic Engineer
Secor Road Reconstruction Project Public Meeting #2
The I-465 West Leg Reconstruction Project
Fordham at Columbia as a Grade-Separated Intersection
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Public Information Meeting NW 100th Street Reconstruction Project
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Highway Safety Team Staff Meeting SMART Portal HSIP Application Demonstration Systemic Safety Improvement (SSI) November 21,2017.
PROJ. 566(17) LOR PID MAJOR WIDENING
Traffic Study Presented by Keith Wenners, pe, ptoe
Comprehensive Transportation Plan
Protected Bicycle Lanes Finally Pedal Their Way to KC…
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Fordham at Columbia as a Grade-Separated Intersection
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street

SAFETY STUDY PRESENTATION PROPOSED SUM – AKRON INNERBELT PROJECT

SAFETY STUDY PRESENTATION PROPOSED SUM – AKRON INNERBELT PROJECT

HISTORIC SAFETY LISTINGS #1 – Segment – Martin Luther King Jr. Boulevard from Market Street Overpass Bridge to Broadway Street – AMATS High Crash Segments #1 – Intersection – Martin Luther King Jr. Boulevard / Main Street / High Street – AMATS High Crash Intersection #139 – Intersection – Martin Luther King Jr. Boulevard / Broadway Street – AMATS High Crash Intersection SAFETY STUDY PRESENTATION

State Route 59 Study Corridor SAFETY STUDY PRESENTATION LEGEND Safety Study Corridor Akron Innerbelt Project Limit

SAFETY STUDY PRESENTATION PROJECT LOCATION & DESCRIPTION Martin Luther King Jr. Boulevard Corridor Market Street Overpass to Broadway Street Distance – 0.34 Miles Approximate ADT – Opening Year 2019 – 16,740 AMATS Growth Rate Obtained & Used for Analysis (0% Per Year)

SAFETY STUDY PRESENTATION CRASH ANALYSIS SUMMARY 128 Crashes Reported in Study Area from 2010 – Fixed Object 24 Rear-end 20 Left Turn 18 Angle 6 Head-On 3 Sideswipe-Meeting 1 Backing 1 Overturning 1 Pedestrian *Note the High Number of Fixed Object Crashes

SAFETY STUDY PRESENTATION CRASH ANALYSIS Much Higher than Average Fixed Object Crashes High Travel Speed Through Curve on Martin Luther King Jr. Boulevard Poor Pavement Conditions Inadequate Intersection Capacity at Martin Luther King Jr. Boulevard / Main Street / Howard Street Intersection Inadequate Intersection Sight Distance Leading to Large Number of Left Turning Crashes Conclusion – High Travel Speed and Poor Pavement on Curve and Inadequate Capacity and Sight Distance at Intersection

SAFETY STUDY PRESENTATION CRASH ANALYSIS Segment Between Market Street Overpass and the Main Street / Howard Street Intersection

SAFETY STUDY PRESENTATION CRASH ANALYSIS Segment Between Market Street Overpass and the Main Street / Howard Street Intersection Continued

SAFETY STUDY PRESENTATION LOOKING WEST ON MARTIN LUTHER KING JR. BOULEVARD TOWARDS MARKET STREET

SAFETY STUDY PRESENTATION CRASH ANALYSIS Intersection of Martin Luther King Jr. Boulevard / Main Street / Howard Street

SAFETY STUDY PRESENTATION LOOKING NORTH ON MAIN STREET TOWARDS MARTIN LUTHER KING JR. BOULEVARD

SAFETY STUDY PRESENTATION PROPOSED COUNTERMEASURES Potential Short Term Countermeasures: Freeway Ends Sign South of Market Street Overpass Bridge Advance Curve Warning Sign with Advisory Speed of 35 mph Signal Ahead Sign Improve Pavement Friction prior to Full Depth Reconstruction Diamond Grinding Project Currently Underway in Area (ODOT PID #76849)

SAFETY STUDY PRESENTATION PROPOSED LONG TERM COUNTERMEASURES Reduce the operating speed on Martin Luther King Jr. Boulevard from 55 miles per hour to 35 miles per hour between the Market Street Overpass Bridge and Main Street / Howard Street Perform a pavement improvement on Martin Luther King Jr. Boulevard from the west end of the project limits to the Main Street / Howard Street intersection Construct a second eastbound left turn lane at the Martin Luther King Jr. Boulevard / Main Street / Howard Street Intersection Convert the left turn movement on all four (4) approaches from protected/permitted to protected-only at the Martin Luther King Jr. Boulevard / Main Street / Howard Street intersection Reconstruct the traffic signal at the Martin Luther King Jr. Boulevard / Main Street / Howard Street intersection Change Configuration of Southbound Howard Street Approach

SAFETY STUDY PRESENTATION PROPOSED SUM – AKRON INNERBELT PROJECT

PROPOSED IMPROVEMENT SAFETY STUDY PRESENTATION

CURRENT PROJECT SCHEDULE Traffic Feasibility Study, Cost & Funding Evaluation: July 2012 thru May 2013 Intersection Safety Study: Completed April 2014 Stage 1 Plan Development: On-Going, Completed November 2014 Stage 2 & 3 Plan Development: Completed November 2015 Right-of-Way Acquisition: None Required; All Work Within Existing R/W Utility Relocations: Minor, Completed as Part of Project Construction: March 2016 thru November 2017 SAFETY STUDY PRESENTATION

CURRENT PROJECT FUNDING PLAN * Local Funding will be Comprised of Funds from the City of Akron as well as a future OPWC Issue I request. Local Funds:$2,244,650*16.9% State of Ohio (Local Funds):$1,239,8729.4% AMATS STP:$5,000, % Federal Earmark Remaining:$258,9742.0% SAFETY STUDY PRESENTATION Safety Funding Request:$4,500, % Funding Type Dollar Amount % of Total Total Project Funding:$13,243,496

SAFETY STUDY PRESENTATION CORRIDOR SAFETY STUDY QUESTIONS JAMES HEWITT CITY OF AKRON ENGINEERING BUREAU MANAGER MIKE TEODECKI, P.E.. CITY OF AKRON DESIGN DIVISION MANAGER MICHAEL A. HOBBS, P.E., PTOE GPD DIRECTOR OF TRAFFIC ENGINEERING CURTIS J. DEIBEL, E.I. GPD TRAFFIC ANALYST