Applying RCM Principles in the Selection of CBM-Enabling Technologies

Slides:



Advertisements
Similar presentations
Maintenance Planning and Control : Modeling and Analysis
Advertisements

Operation & Maintenance Engineering Detailed activity description
Five to Ten Year Vision for CBM by: John S. Mitchell for: ATP Fall Meeting -- Condition Based Maintenance Workshop November 17, 1998, Atlanta Georgia.
Engineering Diploma Level 2 Unit 7 Application of Maintenance Techniques in Engineering In this unit you will get involved with both maintenance procedures.
Unit III Module 6 - Developing Age Exploration Tasks
EECE499 Computers and Nuclear Energy Electrical and Computer Eng Howard University Dr. Charles Kim Fall 2013 Webpage:
1 Introduction to the maintenance optimization Jørn Vatn.
2 SEA 04M DoD Maintenance Symposium and Exhibition Applying RCM Principles in the Selection of CBM-Enabling Technologies Kenneth S. Jacobs (SEA.
Reliability Centered Maintenance Condition Based Maintenance
ORÇUN B İ LEN Maintenance involves fixing any sort of mechanical or electrical device which has become out of order or broken. It also includes.
Understanding & Managing Risk
STEP 1 Develop/update RCM Program Plan STEP 2 New Equipment Design Recommended STEP 2B Complete Level 2 Breakdown STEP 4 Complete Levels 3 and 4 Breakdowns.
Preventive Maintenance
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
CHAPTER 1. MAINTENANCE “Act of causing to continue ” [New Oxford Dictionary]
Integration of Quality Into Accident Investigation Processes ASQ Columbia Basin Section 614 John Cornelison January 2008.
" Copyright 2002, Information Spectrum, Inc. All Rights Reserved." RCM DECISION LOGIC Module 5 UNIT II RCM PROCESS.
Overview Lesson 10,11 - Software Quality Assurance
Unit III Module 4 - Hard Time Task
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
Introduction and Course overview by S. O. Duffuaa.
Maintenance Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Capability Maturity Model
Auditing Standards IFTA\IRP Audit Guidance Government Auditing Standards (GAO) Generally Accepted Auditing Standards (GAAS) International Standards on.
Software Dependability CIS 376 Bruce R. Maxim UM-Dearborn.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15S Maintenance.
Unit I Module 2 - NAVAIR RCM Policy and Organization
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
N By: Md Rezaul Huda Reza n
Definitions, Goals and Objectives
MAINTENANCE STANDARDS & PLANNING
CBM + Program Implementation
Presented to President’s Cabinet. INTERNAL CONTROLS are the integration of the activities, plans, attitudes, policies and efforts of the people of an.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
How Aircraft Operators Can Benefit from PHM Techniques Big Sky - Montana 2012 IEEE Aerospace Conference Leonardo Ramos Rodrigues EMBRAER S.A., São José.
David Baglee Dr. David Baglee. School of Computing & Technology E: T: Reliability Centred Maintenance.
VectorCSP. Questions How many people in here manage assets? How many of you know the condition of those assets? How long until the next calendar or hourly.
M. Frize, Winter 2003 Reliability and Medical Devices Prof. Monique Frize, P. Eng., O.C. ELG5123/ February 2003.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
CBM Optimization – Complex items An item is a group of components that is convenient to monitor and analyze together Equipment units, as defined in the.
1 EXAKT SKF Phase 1, Session 2 Principles. 2 The CBM Decision supported by EXAKT Given the condition today, the asset mgr. takes one of three decisions:
ON CONDITION TASK Module 3 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
Reliability Centered Maintenance. Condition Monitoring Reliability Vibration Analysis Oil Analysis Performance Analysis Failure Analysis.
ADVANCED DIAGNOSTICS CONTINUING TO MEET TECHNOLOGY DEMANDS.
DATA UPDATE 3M DATA / DEGRADER ANALYSIS AGE EXPLORATION DATA ANALYSIS FATIGUE LIFE ANALYSIS FAILURE ANALYSIS (INCLUDING DISTRIBUTIONS / INTERVALS / RATES)
Definitions, Goals and Objectives Embry-Riddle Aeronautical University Chapter 3.
Chapter 8: Maintenance and Software Evolution Ronald J. Leach Copyright Ronald J. Leach, 1997, 2009, 2014,
Maintenance Management
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Failure Modes, Effects and Criticality Analysis
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
1 ME Spring 2015 Systems Engineering, Part II Session 8 5 February 2015 Mr. Larry Hopp, CPL © Copyright 2013.
Reliability Centered Maintenance Analysis
Maintenance strategies
Introduction to the course
Summary of Changes to the
Software Quality Assurance
Chapter 16 Supplement Maintenance.
Reliability J&J - São José dos Campos
15S Maintenance.
ABB SACE Maintenance Preventive Maintenance Program
PREVENTIVE MAINTENANCE By: Mary Solomon Inyang. DEFINITIONS Preventive maintenance refers to regular, routine maintenance to help keep equipment up and.
التحكم في استخدام المصادر
Software Engineering I
Unit I Module 3 - RCM Terminology and Concepts
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Presentation transcript:

Applying RCM Principles in the Selection of CBM-Enabling Technologies Phillip Hans (SEA 04RM1) Naval Sea Systems Command August 2006

CBM – Enabler and Risk Reducer CBM Transition ACHIEVED WITH BALANCED APPROACH Reduced LCC Decreased Maintenance Reduced Manning 3 Year Deployments New Logistics Paradigm Surface Warfare Vision CNO maintenance policy SHIPMER AP-MER MRS RCM Certification Wireless, distributed Networks “Smart”, self-powered Sensors Materials / Coatings Embedded Training Policy, Processes & Procedure Enabling Technologies CBM CBM – Enabler and Risk Reducer

CBM is a Maintenance Philosophy RCM Is the Hub of CBM CBM is a Maintenance Philosophy RCM Provides Rules of Evidence

Proof of RCM Success: SHIPMER The process Maintenance analysis using RCM principles Examines planned, preventive maintenance (PMS) Performed by In-Service Engineers (ISEs) SEA 04RM provides training and logistics support Progress to date SHIPMERs 1-54 completed Nearly 90% of all O-Level PMS reviewed Documented SURFMER savings Exceeded CNO goal of 30% reduction of maintenance manhours Achieved nearly 50% reduction as of August 2006

Road Map for applying CBM to Maintenance Tasks Step 4: Apply Rules for Applicability TD: Life Renewal Replace/Restore) CD: Health Monitoring FF: Hidden Failure (Find/Repair) S/L: Servicing and Lubrication Is the Existing Maintenance Task Applicable? Task Does Satisfy Applicability Rules Task Does Not Satisfy Applicability Rules No Yes Redesign Improve task “Fix when failed” Determine/Classify Type Task TIME- CONDITION- FAILURE- SERVICING LUBE DIR. DIR. FINDING (S) (L) (TD) (CD) (FF) Step 3: APPLICABILITY (Second Filter) Restores or Maintains Original Reliability Identify Failure Mode (E.g., seized bearings) Step 1: AGE DEGRADATION (First Filter) Verify Requirement Exists No Yes Step 2: Does a Significant Rate of Age Degradation Exist? No or Acceptably Slow Rate of Degradation Significant Rate No task Step 5: EFFECTIVENESS (Third Filter) Task Is Worth Doing Is the Maintenance Task Effective? Apply Rules for Effectiveness Safety or the Environment (Law) Operational performance (Mission) All other failures Task Does Satisfy Effectiveness Rules Schedule Task Task Does Not Satisfy Effectiveness Rules No Yes Extend periodicity Sample Vs 100% inspection Make situational Redesign task See other options Step 6: Improvement Option Goals Develop Recommendations for Change Continuous Improvement: periodic re-evaluation and adjustment of tasks

Choosing CBM Technology Can’t afford it all Wouldn’t all be worthwhile, anyway How to choose? RCM is the key 1. Determine what maintenance you need to do 2. Find CBM technology to support it

RCM Criteria for CBM-Enabling Technology Failures Happen: Dominant Failure Modes Failure mode is reasonably likely to occur Applicability Monitored parameter really correlates to the failure mode; and Measures the parameter consistently and accurately; and Measurements serve as an accurate indicator of required repair action; and There is adequate time for corrective action before functional failure.

RCM Criteria for CBM-Enabling Technology (cont.) Effectiveness Safety: Identifies repair threshold in time to reduce probability of failure to acceptable level; or Mission: Identifies repair threshold in time to reduce risk of failure (probability times severity) to acceptable level; or Economics: Identifies repair threshold in time to reduce cost to identify and prevent failure at less cost than repairing after run to failure.

Other Considerations CBM does not eliminate the need for maintenance CBM technology has Ao and maintenance needs Deterioration may occur no matter what the maintenance approach Goal is to maintain or restore reliability at least cost May allow operator to secure an equipment before occurrence of disruptive and more costly failure Costs considered in determination of effectiveness Hardware and software acquisition Development of operating procedures and parametric values vs. deterioration for monitored equipment ILS costs, including training

Conclusions Application of CBM technology can be crucial to a successful CBM transition But only worthwhile technology should be applied A CBM-enabling technology may be worthwhile only if: There is a specific failure mode that is reasonably likely to occur The technology can accurately and consistently be used to predict the onset of the failure mode The technology allows operators and maintainers to take appropriate action that reduces probability of failure (safety), risk of failure (mission), or cost of prevention to acceptable levels The technology “pays for itself” in terms of increased Ao or reduced maintenance costs.