Commercial UES: Smart Plug Power Strips Josh Rushton Regional Technical Forum March 17, 2015.

Slides:



Advertisements
Similar presentations
Residential Refrigerators and Freezers UES Measure Update Regional Technical Forum October 14, 2014.
Advertisements

Residential Single Family Clothes Washer UES Measure Update Christian Douglass Regional Technical Forum February 18, 2015.
Commercial Smart Plug Power Strips Proposal: UES Small Saver Josh Rushton Regional Technical Forum February 18, 2015.
The Saga Continues: Measure Interactions for Residential HVAC and Wx measures Regional Technical Forum April 23, 2014.
Commercial Tank Water Heaters Out-of-Compliance (OOC) UES Measure Recommendation Regional Technical Forum November 19, 2013.
Heat Pump Water Heaters Provisional UES Proposal Regional Technical Forum October 4 th, 2011.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Prescriptive Duct Sealing UES Measure Proposal Regional Technical Forum Subcommittee July 8, 2013.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update May 12, 2015.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
Research Strategy Review: Heat Pump Water Heaters Thermostatic Restriction Valves Jennifer Anziano RTF R&E Subcommittee July 8, 2015.
Heat Pump Water Heater (HPWH) Subcommittee Christian Douglass Regional Technical Forum June 18, 2015.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Advanced Power Strips (APS) Planning UES Measure Proposal Regional Technical Forum August 20, 2013.
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Heat Pump Water Heaters: Tier 2 – Ducted Interior Installations Provisional UES Proposal Regional Technical Forum February 14 th, 2012.
Residential UES: Smart Plug Power Strips Josh Rushton Regional Technical Forum Aug 18, 2015.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Advanced Power Strips (APS) Planning UES Measure Proposal Measure Proposal Presentation to the.
Capacity Impacts of Energy Efficiency What We Know and What We Don’t Know March 11, 2014.
Provisional Protocol and Research Plan: Non-Residential Lighting Retrofits Nonresidential Lighting Subcommittee November 6, 2014.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
Non-Residential Network Computer Power Management UES Measure Update Regional Technical Forum July 16, 2013.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
DHP for Houses with Electric FAF Research Plan: Revisions Adam Hadley, Ben Hannas, Bob Davis, My Ton R&E Subcommittee February 25, 2015.
Residential UES: Smart Plug Power Strips Josh Rushton Regional Technical Forum Aug 18, 2015.
Residential Behavior Programs RTF Subcommittee Ryan Firestone September 17, 2015.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
Delivery Verification Jennifer Anziano Regional Technical Forum March 17, 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF October 4, 2011.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Heat Pump Water Heater Request for Feedback on a proposal to add UES measures with a “Retail – any installation location” delivery mechanism Regional Technical.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
Anti-Sweat Heater Control Small Saver UES Measure Regional Technical Forum September 17, 2013.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
N ETWORK PC P OWER M ANAGEMENT June 28, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
EER Analysis Results Regional Technical Forum March 18, 2014.
Path for Multi-Family (MF) Weatherization and NC Measures Christian Douglass 8/18/2015.
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum September 17, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum August 20, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Staff Updates Regional Technical Forum March 20, 2013.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Extension of Provisionally Deemed Smart Strip in Commercial Applications RTF March 2,
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
Advanced Power Strips IR-Sensing, Home Entertainment Provisional UES Josh Rushton Research and Evaluation Subcommittee September 22, 2015.
Multifamily Homes: Calibration Update Regional Technical Forum December 8 th, 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF August 30, 2011.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
ENERGY STAR Commercial Refrigerators and Freezers Regional Technical Forum January 21 st, 2016 Mohit Singh-Chhabra.
RTF New Homes Subcommittee February 11, 2016 Next Step Homes Update.
Non-Residential Network Computer Power Management Christian Douglass Regional Technical Forum January 21, 2016.
Non-Proven Residential Duct Sealing Measures: Research Strategy Josh Rushton and Adam Hadley Research and Evaluation Subcommittee October 7, 2015.
Defining the RTF’s Role in Research Jennifer Anziano Regional Technical Forum May 15, 2015.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Commercial Efficient Tank Water Heater UES Measure Update Regional Technical Forum December 17, 2013.
Residential Behavior-based Programs Measure Development Update Ryan Firestone Regional Technical Forum March 15, 2016.
RTF’s Engagement with Research Jennifer Light RTF Policy Advisory Committee February 19, 2016.
Research Strategy: Residential Ductless Heat Pumps Research and Evaluation Subcommittee Christian Douglass and Josh Rushton January 8, 2016.
RTF Delivery Verification Guidance Batch 3 Jennifer Light Regional Technical Forum November 10, 2015.
Presentation transcript:

Commercial UES: Smart Plug Power Strips Josh Rushton Regional Technical Forum March 17, 2015

Presentation Outline Objective: Update to Commercial Smart Power Strips measure with measure category review Where we left off in February Measure overview Measure scope Regional potential not small Proposal 2

Where we left off (February) Staff recommended small saver – Reason was low recent / planned uptake – Use short sunset period to check for increased uptake – Concern raised about large regional potential Proven could be an option – Four suite-average savings estimates, 75 to 160 kWh (mean: 118 +/- 30 kWh) – Wider sample needed for better “confidence” – Use short sunset period to check for increased uptake Provisional seemed problematic – Low traction/interest may hinder research planning – Not an issue under revised Planning path (per this morning’s presentation) 3

Measure Overview Sector:Commercial Measure name:Smart Plug Power Strips Baseline:Pre-conditions Applicability: Office space setting Load-sensing, motion-sensing, or timer-controlled strips Must have at least one controlled device Rebate, direct-install, or mail-by-request only CurrentProposed Category:ProvenPlanning Status:ActiveActive Sunset Date: 03 / 31 / / 31 / 2018 Annual Savings:100 kWh118 kWh Measure life: 4 years 4 years B/C Ratio: Added since February! Changed since February!

Measure Scope Savings based on studies of “Tier I” strips in commercial office settings “Tier II” strips technically eligible for this measure (with 118 kWh savings per unit) – “Tier II”-specific savings figures would need separate RTF review / decision – Would need to work out measure applicability and representativeness of data sources – New measure proposal? New measure proposal 5

Regional potential not small 7 th Plan assumptions – NEEA estimates ≈ 6 million computers in region – Measure applicable to 60% of computers, – 85% of that is achievable, – 130 kWh/yr (bus-bar) – Total potential ≈ 45 aMW 6

Regional potential not small Roadmap describes small saver requirement in terms of “likely” savings. – May have intended this as “likely value of potential savings” – Issue flagged for discussion in next guidelines revision 7

Options Things to consider: – A lot of potential savings in office plug loads – Multiple measures target these savings (efficient equipment, smart strips, PC management) – Don’t know all we’d like about smart strip savings, but additional research not an immediate priority Basic options: – Small Saver: May or may not be appropriate, depending on outcome of guidelines discussion – Proven: Seems like a stretch. Existing studies include lots of power strips (≈ 275) but few office suites (precision ≈ 25%) – Planning: (Per Adam’s morning presentation) Good fit, but Research Strategy (next slide) rough and not vetted by R&E Subcommittee 8

Planning Category Notes Guiding principles* for RTF decisions on Planning-category measures: Role: Describe research needs and estimated cost range Method: Put together a “Research Strategy” – Describes research that is expected to meet the research needs at the lowest expected cost to meet the guidelines; – May be in more of an outline form than a formal Research Plan, but contains specifics of sample size, data to be collected, analysis methodology, and an estimated cost range Meaning of RTF approval: RTF agrees with the research needs and agrees the proposed method of data collection and analysis provides a reasonable way to meet the research goals – Funders may still alter research design to meet their needs (final research plan required for measure to achieve Provisional category) – RTF does NOT claim that savings figures are reliable (impact evaluation required) * Proposed at the March, 2015, RTF meeting. As of this writing, these principles have not been formally accepted by the RTF, nor are they codified the RTF Guidelines. 9

Research Strategy (p1) Research goals Estimate average unit energy savings for commercial smart plug power strips. Attempt to relate kWh savings to connected equipment characteristics – Worthwhile but may be impractical (consider seasonal personal heaters) – Research sponsors to weight risks/rewards and review alternatives Data collection Pre/post metering (2-3 weeks each) – Scheduling sensitive to seasonality and need to pair with weather data – Metering at panel may be okay for many sites Advantage: less field time than end-use metering Disadvantage: less detail relating equipment/savings (personal heaters!) – Sample target ≈ 25 sites, ≈ individually metered circuits 2-3 circuits metered per site, on average Need more sites if building-level data used Number of individual APS units: expect 1000+/- Site audits (capturing pre/post changes) – Connected equipment characteristics, sleep-mode features/settings – Separated into individually metered circuits 10

Research Strategy (p2) Sampling Target: 25 sites, individually metered circuits – Quantity (25) based on site-level CV of 0.30, goal of 90/10 conf. /prec. – Qualitatively, need to observe reasonable range of sites to be credible Representative mix of applicable (Tier 1) smart strip types – Separate Tier 2 estimate would require separate sample – Applications typical of likely/actual programs – CBSA or other data may aid design Analysis (Complicated by seasonal use of personal heaters) For each metered circuit, calculate pre/post Delta-average daily kWh Regression (weighted) to estimate average savings per controlled device – Pre/post Delta-kWh as dependent variable – Explanatory variables include controlled device counts (4-5 types) and change in number of controlled space heaters Normalize savings using CBSA (or other data) Estimated Cost Range: ( $2million) 11

Proposed Motion “I, ______________, move that the RTF should accept research strategy and approve the Commercial Smart Plug Power Strips as a UES measure with Category Planning Status Active Set savings to 118 kWh/year Set sunset date to March, 2018” 12

Additional Slides 13

History April, 2009: RTF “provisionally deems” smart strip UES (100 kWh/yr). October, 2011: Based largely on BPA Ross complex data, RTF approves load sensing smart strip in commercial office applications (proven UES 100 kWh/yr) Past RTF discussions noted that the measure has a lot of potential but hasn’t really taken off. This is still the case. 14

Measure Overview 15 Load-sensing smart strips Powers down switched outlets when idle power level detected in “master” device Typical set-up looks for PC sleep mode Set-up: Enable PC sleep mode, set potentiometer to detect sleep mode power level Timer-controlled smart strips Powers down switched outlets at pre-determined times of day Set-up: Program off-hours Motion-sensing smart strips Powers down switched outlets when no motion has been detected for X minutes. Set-up: Position motion sensor New additions in proposed measure Included in current measure

Measure Overview Common set-ups Workstation (load sensor, motion sensor, timer) – Switched: Monitors, desk lamps, printers, personal space heaters, speakers, tiny decorative waterfalls, … – Not switched: CPU, other sensitive devices – For load sensors, primary monitor often plugged into “master” outlet (not switched) Copy room (timer) – Copier, printer, scanner/fax machine, … Break room/kitchen (timer) – Coffee maker, water cooler, … 16

Savings Depends on… – Mix of controlled devices (we know something about this) – How often spaces/devices are idle; whether idle devices are powered down in base case (know less about this) Hard to measure directly. Pre-/post- metering may be complicated by… – Seasonal lighting and heating – HR policies limiting electronic devices (researchers need to sample a lot of different businesses) 17

Savings Control Type BuildingBuilding Type ReferenceSample sizeAnnual energy savings Load Sensor WW LogisticsCommercial[IDL, 2012]88 APS (94 FTE) 19% of plug load; 160 kWh/APS 1 Ross BuildingGovernment[BPA, 2011]45 APS (all at workstations) 29% of affected load; 130 kWh/APS 2 VA CenterGovernment[NREL, 2012]12 APS10% of affected load R&M CHGovernment[NREL, 2012]12 APS23% of affected load 3 Motion Sensor Land RecordsGovernment[IDL, 2012] 33 APS (31 FTE) 22% of plug load; 75 kWh/APS 4 Timer WJ Greene Bldg.Government[NREL, 2012]12 APS52% of affected load 5 EA Garmatz CHGovernment[NREL, 2012]12 APS43% of affected load 3 JBPHH-A4Military Office[NREL, 2014]100 APS (90 FTE) 28% of plug load; 110 kWh/APS 3 1 Figures approximate based on published tables. 2 Includes high savings due to one outlier and zero savings due to user-disabled units; median savings 80 kWh. 3 Approximately two thirds of savings due to printers/copiers. 4 Report notes low number of auxiliary plug loads in this office suite. 5 Nearly 80% of savings due to kitchen equipment. 18

Why is small saver okay? Roadmap Section 2: “The RTF may determine that the likely savings from a measure are too small to warrant the resources needed to meet the quality standards defined for Provisional or Proven measure. Such measures are categorized as Small Saver.” Puget: Not currently offering this measure Tacoma: Often suggest program participants but haven’t found much interest. Avista: Might offer next year, but haven’t offered for past two years BPA publics: Reported 3,929 commercial smart strips in 2013 (2014 tally not yet known). Not the highest-priority measure for ramp-up at this time At 100 kWh per unit per year, 10,000 units would be about 0.1aMW Reminder: Guidelines intend Small Savers to be included in evaluation (if certain threshold condition is met) 19

Cost ControlBrandModelOutletsCord length Protection rating Price 1, 2 Load Sensor Tripp LiteAV86G86 ft.1080 J$30 TrickleStar74 ft.2160 J $35 3 Take ChargeUTC8MS82 ft.2400 J$30 Smart Strip ft. 900 J$32 Motion Sensor WattStopperIDP ft. 740 J$80 TrickleStar74 ft.1080 J$40 Timer Tripp LiteTLP74TG74 ft.2100 J$36 TrickleStar84 ft. 720 J$30 None Tripp LiteTLP606B66 ft. 790 J$11 Tripp LiteSuper7B77 ft.2160 J$17 TrickleStar74 ft.2160 J $20 3 BelkinBE106 – 08R66 ft. 700 J$11 1 Except as noted, prices are from amazon.com (Feb. 4, 2015) and do not include shipping. 2 Prices may also be affected by factors such as product warrantee and current capacity (amps) that vary among models and are not recorded in the table. 3 Price from manufacturer web page (Feb. 4, 2015). 20 Average of these: $33.30

Cost Cost based on full purchase price (not just increment over standard power strip option) Does not include shipping expense 21 Purchase price (online retail, Feb, 2015)$33.29 Installation cost (10 minutes; $20/hr) $3.33 Total$36.62

References [IDL, 2012] Acker, B., C. Duarte, K. Van Den Wymelenberg, Office Building Plug Load Profiles, Technical Report , University of Idaho Integrated Design Lab. [BPA, 2011] BPA, Smart Power Strip Energy Savings Evaluation (Ross Complex), aluation%20Rev1.doc [NREL, 2012] Metzger, I., D. Cutler, M. Sheppy, Plug-Load Control and Behavioral Change Research in GSA Office Buildings, NREL action [NREL, 2014] Sheppy, M., Metzger, I., D. Cutler, G. Holland, Reducing Plug Loads in Office Spaces Hawaii and Guam Technology Demonstration Project, NREL. 22

Tier What? NEEP’s terminology note NEEP working group recommends “tier 2” as industry lingo for APS that target active power down savings …and use “Activity Monitor Power Strip” with “active power down” savings as the customer-facing phrase Activity Monitor Power Strip (includes tier 2). Power strip looks for signs of activity in the room, and turns off outlets if none is detected. Use additional phrase “Active Power Down” when describing Tier 2 APS. Master-Controlled Power Strip. When a primary device (such as a computer or TV) is turned off by the user, the power strip automatically turns off (de-energizes) the controlled outlets. Masterless Power Strip. When all of the controlled devices are turned off, the power strip turns off power to those outlets completely, eliminating all of the vampire loads. Remote Switch Power Strip. Power strip can be turned off by the user via a remote switch. Timer Power Strip. 23

October 2014 RTF meeting Jerome: CLEAResult has been looking at other Technical Reference Manuals (TRMs) to see if they will be of help. I’ll let you know if we find anything. Davis: There have been proposals to do things with this, but nothing has materialized regionally. Danielle Walker (BPA): Yes. I’ll check whether BPA is on the uptake. Davis: In Vancouver there’s some trouble with the data. Grist: One question is what is connected to the power-strip that you're turning off – it can be anything from a computer to foot warmers. People added space heaters to the post-period versus what was there in the pre-. Eckman: Is there a recommendation to bring it back as an alternative measure type – a Small Saver – pending no data? – Rosolie: I move to extend the sunset date to March 31, (Koran: Second) Davis: The sample size you’d need given the variance is spectacular. Brad Acker: What’s the status of the available research? – Grist: We have nothing new, although BPA and CLEAResult are looking into it. – Acker: I have a 2011 paper. 24