Doc.: IEEE 15-10-0529-00-leci Submission Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Use Case: Distribution.

Slides:



Advertisements
Similar presentations
Doc.: IEEE leci Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Low Energy.
Advertisements

July 2004 Jay Bain, Fearn Consulting doc.: IEEE /0379r0 Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Submission Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid: Faulted Circuit Indicator]
Doc.: IEEE Submission doc. : IEEE March 2009 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE g Submission July 2010 Roberto Aiello, John BuffingtonSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Submission November 2015 Slide 1Li Qiang, Huawei Technologies Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE leci LECIM IGSlide 1 July 2010 David Howard, On Ramp Wireless Slide 1 Project: IEEE P Working Group for Wireless Personal.
<November 2003> doc.: IEEE /486r0 <November 2003>
<month year> doc.: IEEE /271r0 September, 2000
January 2014 doc.: IEEE /0084r0 July 2014
Submission Title: [Add name of submission]
<month year> <doc.: IEEE doc> May 2015
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
May 2010 doc.: IEEE /0333r0 May 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [May 2010.
doc.: IEEE <doc#>
Submission Title: [Wireless Display Throughput Requirements]
July 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [FCC-UWB-certifications-below-1-GHz] Date Submitted:
doc.: IEEE <doc#>
Submission Title: [Wireless Display Throughput Requirements]
Project: IEEE Wireless Personal Area Networks (WPANs)
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
<month year> doc.: IEEE < e>
<May,2009> doc.: IEEE <doc .....> <July 2009>
doc.: IEEE <doc#1>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> doc.: IEEE <xyz> January 2001
doc.: IEEE /XXXr0 Sep 19, 2007 July 2008
August, 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Enhancing reliability of data transmission.
doc.: IEEE <doc#>
September g Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Recognition of Hiroshi.
February 19 May 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: LECIM-IG Closing Report for Beijing.
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4c Project Plan] Date Submitted: [15.
<month year> doc.: IEEE <030158r0> September 2003
July 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: IG THz San Diego July 2016 Closing Plenary.
doc.: IEEE <doc#>
<month year> November, 2004
doc.: IEEE <doc#>
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
Submission Title: [Frame and packet structure in ]
November 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Simplified geometry for the usage model.
October 2011 doc.: IEEE ptc August 2012
<month year> <doc.: IEEE doc> May 2015
<month year>20 Jan 2006
<month year> doc.: IEEE <030158r0> January 2004
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> doc.: IEEE < e>
April 19 July 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: WNG Closing Report for San Diego.
<month year> <doc.: IEEE doc> January 2016
doc.: IEEE <doc#1>
<month year> <doc.: IEEE doc> March 2015
doc.: IEEE <doc#>
Submission Title: [ e Schedule Update]
July 2010 <month year> doc.: IEEE g Doc.: IEEE g
July 2003 doc.: IEEE /247WG-IG4a July 2003
Submission Title: [ e BRC Motions for the April 2016 teleconference]
September 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suggested TG3c PAR Changes] Date Submitted:
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4c Project Plan] Date Submitted: [15.
Submission Title: [Consolidation of Ranging Results]
August, 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Improve the latency between GTS request.
Doc.: IEEE Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Summary.
<month year> <doc.: IEEE doc> March 2015
July 2003 doc.: IEEE <03/242> July 2003
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Dependable Interest Group Closing.
Submission Title: TG9ma Agenda for September Meeting
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
March 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Interest Group Body Area Networks Closing.
Presentation transcript:

doc.: IEEE leci Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Use Case: Distribution Grid and Substation Monitoring] Date Submitted: [July 2010] Source: [Mike Calcagno] Company: [Sempra Energy] Address: [San Diego, CA USA] Voice:[], FAX:[], Abstract: [This presentation contains the material related to the IG LECIM tutorial] Purpose: [For information] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P July 2010 Mike Calcagno, Sempra Energy Slide 1

doc.: IEEE leci Submission User Case Sempra Energy Mike Calcagno Distribution Grid Sensor/Fault Current Indicator Substation Monitoring Mike Calcagno, Sempra EnergySlide 2 July 2010

doc.: IEEE leci Submission SDG&E Background 3,300,000 population in territory 700,000 gas meters > 60 % underground infrastructure 1,400,000 electric meters Significant IT programs –OpEx 20/20 – leveraging technology –VoIP –Wide-area network rebuild – TDM to IP/MPLS –LAN rebuild –Wireless wide area network rebuild Mike Calcagno, Sempra EnergySlide 3 July 2010

doc.: IEEE leci Submission Sample of Wireless at SDG&E SystemPurposeFrequencyScope SCADADistribution monitoring and control 900 MHz MAS1500 RTUs DataTacMobile Data800 MHz400 MDTs SmartzonePTT mobile voice 900 MHz2000 units Wirestring radioTactical field use450 MHz1000 units Satellite linksEmergency comm 12 GHz5 quick deployment WiFiLAN2.4 GHzOffices CommercialRemote accessVarious16,000 Mike Calcagno, Sempra EnergySlide 4 July 2010

doc.: IEEE leci Submission Gaps In Technology Point to multi-thousands of point communications Relatively small amount of data Latency in seconds Ability to operate without primary power Minimal network complexity and number of active nodes Standard network interface – IP Standard device interface – Serial or IP Available embedded through an OEM Easily deployable Able to communicate to underground assets Addresses spectrum issues Mike Calcagno, Sempra EnergySlide 5 July 2010

doc.: IEEE leci Submission Target Use Cases at SDG&E Distribution Grid Sensor/ Fault Current Indicators –In the tens of thousands –Overhead and underground –Monitor state, possibly number of events Distribution Transformers –In the hundreds of thousands –Voltage and current, power out Monitoring Remote Terminal Units –Condition based monitoring –Improve outage resolution July 2010 Mike Calcagno, Sempra EnergySlide 6

doc.: IEEE leci Submission SDG&E Territory: Examples July 2010 Mike Calcagno, Sempra EnergySlide 7 Tower Shared Space / High Interference

doc.: IEEE leci Submission SDG&E Territory: Examples July 2010 Mike Calcagno, Sempra EnergySlide 8 FCI: Below Ground Deployment

doc.: IEEE leci Submission SDG&E Territory: Examples July 2010 Mike Calcagno, Sempra EnergySlide 9 Substation Monitoring: 500 KV / 230 KV

doc.: IEEE leci Submission SDG&E Territory: Substation Monitoring July 2010 Mike Calcagno, Sempra EnergySlide 10 Harsh EnvironmentInside Metal Cabinets

doc.: IEEE leci Submission SDG&E Territory: Substation Monitoring July 2010 Mike Calcagno, Sempra EnergySlide 11 Harsh Environment: 230 KV