GROUNDWATER CONTROL.

Slides:



Advertisements
Similar presentations
Construction Below the Water Table
Advertisements

Cofferdam.
ARC313 Building Code II. Review What is the minimum bearing pressure allowed for soils to support foundations? 75 kPa How can you tell by looking at the.
Ground Freezing.
Measurement for Civil Engineering works
Cairo Metro Line3 / Medinah Car Park II
Soil & Site Investigation
Walls Ron Gatepain constructionsite.
Foundations Purpose – To transfer weight of structure (including live loads) to the ground within allowable settlement criteria.
SOFT SOIL (PROBLEMS & STABILISATION METHOD) Session 2 - 7
CONSTRUCTION OF SOIL NAILING WALLS
Water Underground.
Groundwater Control Affects design of: –Permanent Works –Temporary Works May affect viability of scheme Safety Issues –May cause instability of excavation.
Foundations and basements
Project details • New headquarters for HKSB
Foundation Systems.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
CHAPTER 3 GROUTING FILLING VOIDS TO PREVENT EXCESSIVE SETTLEMENT
1 Groundwater Pollution Containment of Pollution.
ASSALAMUALAIKUM & GOOD MORNING
RETAINING WALLS.
Construction Dewatering
Sanitary Engineering Lecture 16
TOPIC 2: TYPES OF FOUNDATION
Foundation Engineering CE 483
FOUNDATION.
OPTIMUM COATING SOLUTIONS OPTEK PRODUCTS CEMETITIOUS COATINGS AND ADDITIVES Brief overveiw.
TRENCHLESS TECHNOLOGY
Sources of water (RAIN)
Topic B2 Sub-structure groundworks
Slop Stabilization Pertemuan
Plain Concrete I. *Definition 1. Concrete: a hard, strong construction material consisting of a hardened or set mixture with such aggregates as sand, gravel,
Ground Improvement Issues & Techniques
Latest Advancements in Instrumentation, Monitoring and QA/QC Techniques for Deep Excavation Support Systems: Al Hilal Project, Abu Dhabi – A Case History.
Groundwater Control Dewatering for trenches up to 6 metres deep either by : sump pumping or ; sump pumping or ; well pointing well pointing.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
EPA Infrastructure Pvt. Limited
Groundwater Water Table Recharge Groundwater Hydraulic Gradient
Joints for Diaphragm Walls
Factors to Consider in Foundation Design Chapter # 02
COFFERDAMS.
MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.
Understand foundation design and construction
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
DIAPHRAGM WALLS.
Part 11 Concrete repairs - sealing of cracks and waterproofing (Part 11, PP 2007, animation+p/r : DEMO) ready Copyright notice Unauthorised.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
GROUND IMPROVEMENT PRINCIPLES OF COMPACTION. A good foundation has a safe and economic design with the following properties: 1.Have adequate shearing.
PILING TECHNIQUES.
Substructure Groundworks - Hazards
Soil Improvement.
GROUND IMPROVEMENT TECHNIQUES
Building Technology – Soil Investigation
METHODS OF CRACK REPAIRS
TRENCHLESS TECHNOLOGY
Chejja.
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Diaphragm Wall: Construction and Design
Ground improvement techniques
{Graduation Project} An-Najah National University
PREPARED BY SK SOHEL, CE-3RD YEAR GUIDED BY JAYASHREE SENGUPTA
CT Reinforced Earth Structures
Arch205 Materials and building construction 1 foundation
Arch205 building construction foundation
REVISION 1 1. Foundations.
Diaphragm Wall Construction Long sections of the cut and cover use diaphragm walls to support the sides of the open excavation, while work on the.
Classification, Engineering Properties & Consolidation Methods
Factors to Consider in Foundation Design Chapter # 02
Presentation transcript:

GROUNDWATER CONTROL

Ground Water Control Water can be classified by its relative position to or within the ground.

Ground Water Control Problems of water in the subsoil: A high water table could cause flooding during wet period. Subsoil water can cause problems during excavation works by its natural tendency to flow into the voids created by the excavation activities. It can cause an unacceptable humidity level around finished building and structures.

Ground Water Control Control of ground water always referred to temporary and permanent exclusion. Temporary exclusion: lowering of the water table and within the economic depth range of 1500mm using subsoil drainage methods, for deeper treatment a pump or pumps are usually used. Permanent exclusion: the insertion of an impermeable barrier to stop the flow of water within the ground.

Ground Water Control

Ground Water Control Temporary exclusion Simple Sump Pumping Jetted Sumps Wellpoint Systems

Ground Water Control Simple Sump Pumping Suitable for trench work and/or where small volume of water are involved.

Ground Water Control

Ground Water Control Jetted Sumps Almost the same with simple sump methods of dewatering. A borehole is formed in the subsoil by jetting a metal tube into the ground by means of pressurised water to a depth within the maximum suction lift of the extract pump. The metal tube is withdrawn to leave a void for placing a disposable wellpoint and plastic suction pipe. The area surrounding the pipe is filled with coarse sand as filtering media.

Ground Water Control

Ground Water Control Wellpoint systems This is a method of lowering the water table to a position below the formation level to give a dry working area. Jetting into the subsoil a series of wellpoints which are connected to a common header pipe which then connected to a vacuum pump. Commonly use in trench excavation. If the proposed formation level is below the suction lift capacity of the pump a multi-stage system can be employed.

Ground Water Control

Ground Water Control

Ground Water Control

Ground Water Control Permanent exclusion Thin Grouted Membranes Contiguous Piling Diaphragm Wall Precast Concrete Diaphragm Walls Grouting Methods Ground Freezing Techniques

Ground Water Control Thin Grouted Membranes Work as permanent curtain or cut-off non structural walls or barriers inserted in the ground to enclose the proposed excavation area. Suitable for silts and sands and can be installed rapidly but they must be adequately supported by earth on both sides. The only limitation is the depth to which the formers can be driven and extracted.

Ground Water Control

Ground Water Control Contiguous Piling Forms a permanent structural wall of interlocking bored piles. Alternate piles are bored and cast by traditional methods after which the interlocking piles are bored using a special auger or cutter. Suitable for most types of subsoil and has the main advantages of being economical on small and confined sites; capable of being formed close to existing foundations and can be installed with the minimum of vibration and noise.

Ground Water Control Contiguous Piling To ensure a complete interlock of all piles over the entire length may be difficult therefore the exposed face of the piles is usually covered with a mesh or similar fabric and face with rendering or sprayed concrete. Suitable for structures such as basements, road underpasses and underground car parks.

Ground Water Control

Ground Water Control Diaphragm Wall Are structural concrete walls which can be cast in-situ or using pre-cast concrete methods. Suitable for most subsoil and their installation generates only a small amount of vibration and noise. The high cost of these walls makes them uneconomic unless they can be incorporated into the finished structure. Normally use for basements, underground carparks and similar structures.

Ground Water Control

Ground Water Control Pre-cast Concrete Diaphragm Wall Have some applications with in-situ concrete diaphragm walls. Lack in design flexibility. The panel or post panel units are installed in a trench filled with a special mixture of bentonite and cement with a retarder to control the setting time. This mixtures ensures that the joints between the wall components are effectively sealed. To provide stability, the panels of posts are tied to the retained earth with ground anchors.

Ground Water Control

Ground Water Control Grouting Methods Are used to form a curtain or cut-off wall in high permeability soils where pumping methods could be uneconomic. The curtain walls formed by grouting methods are non-structural therefore adequate earth support will be required and in some cases this will be a distance of at least 4m from the face of proposed excavation.

Ground Water Control Grouting Methods Grout mixtures are injected into the soil by pumping the grout at high pressure through special injection pipes inserted in the ground. The pattern and spacing of the injection pipes will depend on the grout type and soil conditions. Grout types: Cement grouts Chemical grouts Resin grouts

Ground Water Control

Ground Water Control Ground Freezing Techniques Suitable for all types of saturated soils and rock and for soils with a moisture content in excess of 8% of the voids. The basic principle is to insert into the ground a series of freezing tubes to form an ice wall thus creating an impermeable barrier. Takes time to develop and the initial costs are high.

Ground Water Control Ground Freezing Techniques The freezing tubes can be installed vertically for conventional excavations and horizontally for tunneling works. Normally using magnesium chloride and calcium chloride with a temperature of -15 to -25 degree Celsius which takes 10 to 17 days to form an ice wall 1m thick. Liquid nitrogen could be used as the freezing medium to reduce the initial freezing period if the extra cost can be justified.

Ground Water Control

THE END