Kentucky River Lock and Dam No. 8 A Major Qualifying Project for Stantec Consulting Services Inc. Michael Kendall Karyn Sutter.

Slides:



Advertisements
Similar presentations
Dam Construction Alternatives Site Specific Matrix
Advertisements

BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Xing Zhang Yifan Zhang Fan Yang.  A Large-scale Coal Mine locates at this area.  The problem of subsidence here is quite serious.  Use TRANSIENT.
The Failure of Teton Dam
A World of Solutions TM Falgout Canal Floodgate Structure Unbalanced Forces and Proposed Solutions October 2013.
Click to continue…. Railroad Track wetland Image Date: December 2003.
USE OF POLYURETHANE GROUT FOR CONCRETE PAVEMENT SLAB STABILIZATION Indiana County District 10-0 Lessons Learned 1.
By Victoria Howland and Scott Turgeon.  Major Qualifying Project  Stantec Project Center ◦ Center Director: Fred Hart ◦ Faculty Co-Advisor: Suzanne.
Groundwater Control Affects design of: –Permanent Works –Temporary Works May affect viability of scheme Safety Issues –May cause instability of excavation.
GROUNDWATER CONTROL.
East Branch Dam Safety Modification Project
Waterway Permits Update questions to:
IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING URS Corporation January 22, 2003 URS Corporation January 22, 2003.
April 5, 2012 Managing Mine Slimes and Other Lessons Learned Jack Waite Mine Removal Action Todd Bragdon, CDM Smith Brandon Ball, Parametrix Bill Adams,
May 14, 2014 RAMSHORN POND DAM REHABILITATION PUBLIC INFORMATION SESSION PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer.
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Central Valley Flood Protection Board Meeting – Agenda Item No. 13B.
Water Movement in Soil and Rocks. Two Principles to Remember:
Malpasset Dam Disaster
  AN-najah National University Faculty of Engineering Civil engineering Department Prepared by: Eng. Imad A. F. Jarara’h. Submitted.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Sustainable Landscape Architecture Best Practices Manual Peter Cacciatore James Hogan Rebecca Mattern Angel Munoz March 4, 2010.
NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.
Abstract We evaluated various construction methods including: Cast in Place Concrete, CMU, ICF, Precast Concrete, and Structural Steel for an Electrical.
Construction Dewatering
Grindstone Seepage Mitigation Project Village of Ruidoso Ed Toms 2105 NMWDOC Spring Workshop May 12, 2015.
Water Quantity and Conservation #1 Use land according to its capability and treat it according to its needs  Use management to gain the most agricultural.
Walk for a Day and the WQPL. Walk for a Day Proposed Regional Trail Hill Country Conservancy Greenways Inc. City of Austin LBJWC.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
Ground Improvement Issues & Techniques
Department of Civil Engineering,
Of An Evaluation of Performance Measures for Prefabricated Submerged Concrete Breakwaters: Section 227 Cape May Point, New Jersey Demonstration Project.
CWPPRA New Orleans Land Bridge Shoreline Enhancement and Marsh Creation Project Project Kickoff Meeting April 15, 2015.
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
Spokane Valley-Rathdrum Prairie Aquifer Augmentation Study Results Mr. Colt Shelton 1, Mr. Matt McDonald 1, Dr. Michael Barber 2, Dr. Akram Hossain 3,
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Sinkhole Collapses in Middle Creek Collier Drive, Sevierville, TN.
Outline of the Execution Manual for Seismic Retrofitting of Existing Pile Foundations with High Capacity Micropiles Masashi ITANI Takeshi OSHITA Seiichi.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
3 Easy Steps STEP 1: SITE SELECTION Select Area with Unsuitable Rock Types.
THE TETON DAM FAILURE.
Brad Oliver – Structural Option Advisor – Professor Memari.
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
Montana Resources Conceptual Plans for Permitting Continued Mining September 15, 2015.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
New Jersey Institute of Technology Concrete Industry Management Program Prof. David Washington, Ph.D., P.E. Instructor Concrete Industry Management Program.
Brazoria County RESTORE Act Projects
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Horizontal Directional Drilling (HDD) Arvid Veidmark, III EVP, Senior Estimator Specialized Services Company
Introduction to Well Completions
 All civil engineering projects like dams, reservoirs etc. constructed on earth crust and constructed by material obtained from the crust.  So it is.
LAKE HERMITAGE MARSH CREATION BA-42 FINAL (95%) DESIGN REVIEW MEETING NOVEMBER 3, 2008.
Christopher Melson Department of Civil and Architectural Engineering University of Wyoming.
“Megaton” Cerenkov Detector - Excavation Kenneth Lande, Univ. of Pennsylvania 4200 mwe Depth.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
Building on Difficult Soils
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
Infrastructure, Innovation and Standardization
PREPARED BY SK SOHEL, CE-3RD YEAR GUIDED BY JAYASHREE SENGUPTA
Multistory Office Building
Civil Engineering for FCC-eh IR
CT Reinforced Earth Structures
בטיחות בתעשייה בהיבט חברות הביטוח
SAFETY IS TVA’S NUMBER ONE PRIORITY
Diaphragm Wall Construction Long sections of the cut and cover use diaphragm walls to support the sides of the open excavation, while work on the.
Bituminous-faced Rockfill Dam Seismic Performance Prediction of stress-strain behaviour and potential damages Proposal for the 15th International Benchmark.
NISSAN Z31 & Z32 OIL PUMP DIFFERENCES
Presentation transcript:

Kentucky River Lock and Dam No. 8 A Major Qualifying Project for Stantec Consulting Services Inc. Michael Kendall Karyn Sutter

 Major Qualifying Project  Stantec Project Center ◦ Project Advisors  Professor Suzanne LePage  Professor Frederick Hart ◦ Stantec Consulting Service Inc. Mentors  Daniel Gilbert  April Welshans  Adam Hacker

 LD 8 Foundation Improvement ◦ Karst Features ◦ Water Quantity and Quality Concerns ◦ Foundation Stability

 Evaluate Existing Dam Conditions  Develop Design Options  Apply Evaluation Criteria to Design Options  Create a Preliminary Design of Best Foundation Improvement Option

 Boring Layout  Water Pressure Tests Exploratory Borings by Geological Region

 Materials ◦ Portland Cement ◦ Admixtures  Design Techniques ◦ Grout Curtain ◦ Grout Cap

Secant WallsDiaphragm Walls

 Design Selection ◦ Evaluated Existing Conditions ◦ Developed Three Design Options DesignDescription Design 1Grouting in all regions Design 2 Grouting in all regions, secant wall in region 2 Design 3Grouting in all regions, secant wall in region 2, 3 and 4 Design Options

 Application of Evaluation Criteria ◦ Cost ◦ Environmental  Permitting ◦ Risks  Reduction in Seepage  Foundation Damage ◦ Constructability  Dewatering  Site Access  Design Creation

GroutingCut-off Walls RegionRecommended Grout Curtain Depth Elevation (NAVD88) Approx. 15° Inclination (ft.) Region Region Region Region RegionRecommended Cutoff Depths Elevation (NAVD88) Length (Ft.) Region Region Region Each Secant Shaft Designed with a 4 Ft. Diameter with a 1 Ft. Overlap on Each Side Two Row Curtain with 16 Ft. Space Between Rows and Injection Holes every 6 Ft.

 Cost DesignTotal Cost Design 1: Grout Curtain Throughout $2,506,804 Design 2: Grout Curtain Throughout, Secant Wall in Region 2 $2,948,554 Design 3: Grout Curtain Throughout, Secant Wall Regions 2, 3 and 4 $5,024,554 Design Option Costs

 Environmental ◦ Identical Permitting Requirements  Risks ◦ Mostly Dependant on Grouting ◦ Seepage Reduction Crucial  Constructability ◦ All Designs Practical ◦ Verifiability of Technique

 Selected Design 2: Grout Curtain Throughout with a Secant Wall in Region 2 Design of Proposed Foundation Improvement

 Highest Water Loss Observed through Region Two  Favorable Cost to Permeability Reduction Ratio  Practical Design