Ursula Bassler/Gregorio Bernardi1convenors meeting, Sep 4th 2003 CALGO: Overview Create a dynamic group  reduce the number of meetings  1 big meeting.

Slides:



Advertisements
Similar presentations
Year 10 ISA Controlled assessment Week starting March 4 th 2013.
Advertisements

LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
Calorimetry Summary Dhiman Chakraborty, NIU Linear Collider Workshop UC Santa Cruz, 29-june-2002.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
ADM Nov G. Bernardi for CALGO CALGO  TMBfix CALGO recommends to implement in the next TMBfixing: 1)New Hot Cell Killer 2)Restore ICR region to.
September 16, 2002 ID Groups Physics Coordinator B. Klima Software and Computing A. Boehnlein, J. Qian Physics Groups Spokesmen G. Blazey J. Womersley.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Parent Session #1 Thursday, March 5th, Parent Session #1 Thursday, March 5, 2015.
Action & activity fundamentals Developing a custom declarative activity Developing a custom code activity.
January 26,2007 D0 Collaboration Organization TeV Working Groups Physics J. Hobbs R. Van Kooten Physics Groups Spokespersons T. Wyatt D. Denisov Online.
July 7, 2012 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, C. Schwanenberger Physics Groups Spokespersons G. Bernardi D. Denisov.
ARISE Summer Institute UC Davis June 17-June 22, 2011.
Ursula Bassler/Gregorio Bernardi1convenors meeting, Sep 4th 2003 CALGO: Overview Create a dynamic group  reduce the number of meetings  1 big meeting.
(Tentative) Plan for Last Days of School. Friday 5/8 / Monday 5/11 Work on empathy final project Tuesday 5/12 / Wednesday 5/13 (MIN.) Work on empathy.
Aug 1, 2009 D0 Collaboration Organization TeV Working Groups Physics A. Juste Physics Groups Spokespersons D. Denisov S. Soldner-Rembold Production Speakers.
August 27,2007 D0 Collaboration Organization TeV Working Groups Physics A. Juste, S. Soldner-Rembold Physics Groups Spokespersons D. Denisov D. Wood Production.
Objectives and Process WLE Volta/Niger Design Workshop May 28-30, 2013 Accra.
1convenors meeting, Sep 4th 2003G.B. for CALGO Calorimeter Algorithms  A few remarks on the calo. problems  Overview of the CAT force results  From.
Arrival Morning Meeting/RTI 7:40- 8:30 Phonics 8:30-8:50 (Snack) at 8:50ish.
PART OF SPEECH DEFINITION SYNONYM SENTENCE WORD ORIGIN NAME TEACHER AND DATE1 WORDS OF THE WEEK.
Aug 2005 Working Groups Physics J. Hobbs V.Buescher (deputy) Physics Groups Spokespersons G. Blazey T. Wyatt Trigger Silicon Layer O Online L3/DAQ Trigger.
Session # TGn Opening Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE gman-10/0036 Date Submitted:
December 28, 2009 D0 Collaboration Organization TeV Working Groups Physics G. Bernardi, M. Verzocchi Physics Groups Spokespersons D. Denisov S. Soldner-Rembold.
September 1, 2009 D0 Collaboration Organization TeV Working Groups Physics G. Bernardi, M. Verzocchi Physics Groups Spokespersons D. Denisov S. Soldner-Rembold.
Calorimeter Status Nirmalya Parua, Brook.
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
September 19,2006 TeV Working Groups Physics J. Hobbs R. Van Kooten Physics Groups Spokespersons T. Wyatt D. Denisov Trigger Silicon Layer O Online L3/DAQ.
Trigger DQ flags Discussed at April Workshop on Detector Conditions for the Trigger Talks by.
PIP Wednesday April 10 th, /4/12 Agenda Project Update(s) Pellico - PIP Status Talk(s) 1.None –(Review Status Report Effort)
Algebra II – Week 1 (Jan. 5 th – 9 th ) Monday – Introduction; Textbook, Pgs , 5-43 odd Tuesday – Warm-up; 1-4; Notes, Section 6; Workbook, Pg.
Ursula Bassler1online monitoring 7/2/2002 Calorimeter Data Quality  aim: enhance the information flow concerning the data quality between the detector-
Reflections of a System Run Coordinator Or Equivalent! Bruce M Barnett STFC, Rutherford Appleton Laboratory L1Calo Collaboration Meeting January.
Radio Alarm Radio Alarm Project. 시나리오 메인화면 Set alarm Play radio Add radio channel.
DØ Algorithms Meeting March 9, Leslie Groer Columbia UniversityCalorimeter Online Software Status 1  Examines  Crate Unpacking  Calibration 
1 Silke Duensing DØ Analysis Status NIKHEF Annual Scientific Meeting Analysing first D0 data  Real Data with:  Jets  Missing Et  Electrons 
Ursula Bassler, LPNHE Paris1Collaboration Meeting - 13 Sept Calorimeter: Status & Plans Preamp/ Driver Trig. sum Filter/ Shaper x1 x8 SCA (48 deep)
WEEK 1 You have 10 seconds to name…
Technical Workshop 5-6 November 2015 Alberto Di Meglio CERN openlab Head.
Warm Up Week 10. Monday, October During photosynthesis, radiant energy is changed into ______________ energy. 2. The opening in the leaves that.
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
Using Operations Dashboard on Multiple Platforms Chris Olsen Dave Nyenhuis.
DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 1  Examines  Crate Unpacking.
March 15,2005 Working Groups Physics J. Hobbs V.Buescher (deputy) Physics Groups Spokespersons T. Wyatt D.Denisov Trigger Silicon Layer O Online L3/DAQ.
DØ Algorithms Meeting April 6, Leslie Groer, Columbia Univ Ursula Bassler, LPNHE, ParisCalorimeter Online Software Status 1  Examines  Crate Unpacking.
Q1.8 Monday, October 5 LA Agenda: Good Things Assignments: Introduction, counterargument, and conclusion for argument essay Raters Thought for the day:
Ursula Bassler convenors meeting, August 28th, Tower 2 problem For about 30 BLS boards tower 0 is read out instead of tower 2  the information.
September 1, 2014 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, R. Van Kooten Physics Groups Spokespersons D. Denisov P. Grannis.
Electricity & Magnetism Electricity Vocabulary / Concepts.
Calibration Workshop 8 Sept Calorimeter Calibration: Calibration procedure and Database Definition Ursula Bassler, Mrinmoy Bhattacharjee, Leslie.
Week #27Monday, March 4th, 2014 Due: This week will end with our 3 rd quarter memory review test on the following verses: Romans 5:3Romans 8:28 1 Corinthians.
Happy Days by Charles Fox and Norman Gimbel PowerPoint by Camille Page.
Design and Analysis of Algorithms CS st Term Course Syllabus Cairo University Faculty of Computers and Information.
Daily Math Review September 2-6, Monday Solve the following problems with strategies and/or algorithms 5, = 9, = 3, =
DØ Calorimeter Task Force Meeting September 26, Leslie Groer Columbia UniversityOffline Zero Suppression Bug 1 Offline zero suppression bug  In.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
Need Help With Trig graphs? Then this workshop is for YOU! Where: MS109 When: Wednesday March 16 th and Thursday March 17 th When: 11:30 – 12:30 All Math.
DEVRY ACCT 251 W EEK 1 T O W EEK 7 A LL DQ' S Check this A+ tutorial guideline at
CALGO: Software Tasks cal software:
CALGO: Overview Create a dynamic group  reduce the number of meetings  1 big meeting + 1 steering group meeting + 2 subgroups: CALGO – meetings : weekly,
Electron-ID and EM scale status
D I s , a ·.... l8l8.
أنماط الإدارة المدرسية وتفويض السلطة الدكتور أشرف الصايغ
I ll I
The Perils of Missing pT Corrections
The Big 6 Research Model Step 3: Location and Access
' 1 A ./.\.l+./.\.l
Cat.
Presentation transcript:

Ursula Bassler/Gregorio Bernardi1convenors meeting, Sep 4th 2003 CALGO: Overview Create a dynamic group  reduce the number of meetings  1 big meeting + 1 steering group meeting + 2 subgroups: CALGO – meetings : weekly, Tuesday 10:30-12:30 CAT – Steering group meeting bi-weekly (A) Wednesday 9:00-10:30 JES bi-weekly (B) Wednesday 9:00-10:30 tau-id bi-weekly (A) Thursday 8:30-10:00 Note: CALOP  operation meetings: weekly, Thursday 9:00-10:30 CAT now includes all calorimeter subgroups/id responsible

Ursula Bassler/Gregorio Bernardi2convenors meeting, Sep 4th 2003 CALGO: Activities & Structure CALOP - calo hardware & operations R. Zitoun cal/icd-softw. Jan Stark/Lee Sawyer cal – dq Slava Shary, Jan Stark cps-software A. Magerkurth/D.Alton fps-software A. Patwa/A. Turcot calib – online em-id Harald Fox, Jan Stark tau-id Dhiman Chakraborty / Serban Protopopescu met Patrice Verdier, Sophie Trincaz jes Ia Iashvili/ Nirmalya Parua  -id Yurii Maravin Drew Alton jet-id Slava Kulik Alexander Kupco l3cal-software cal-simulation Leslie Groer CAT eflow Anna Goussiou Jon Hays hardware data taking slow control trigger L1/L2 icd CALGO - calorimeter algorithms & objects U.Bassler/ G. Bernardi

Ursula Bassler/Gregorio Bernardi3convenors meeting, Sep 4th 2003 Tentative agenda Calo WKSP Welcome/goals of the workshop UB Shutdown status/Operation organization RZ Data Quality VS/JS Level Simulation Status and prospects LG Electron-id session HF/JS gamma-id session YM/DA MET session ST/PV Jet-id session AK/SK h00 JES session II/NP h00 Energy Flow AG/JH h45 Tau-id DC/SP