The Hoover Dam. The first concrete was placed into the dam on June 6, 1933. Since no structure of the magnitude of the Hoover Dam had been constructed,

Slides:



Advertisements
Similar presentations
The Construction of Hoover Dam
Advertisements

Superdam by Mel Boring.
Civil engineer is the person who is responsible for the planning and construction of structures such as buildings, roads, bridges, dams and ports. His.
COOLING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
The Birth of The Water Tuber Boiler and Christened as Steam Generator P M V Subbarao Professor Mechanical Engineering Department Generation of Unlimited.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Materials used for pipes: Sewers are made from: 1- Concrete 2- Reinforced concrete 3- Vitrified clay 4- Asbestos cement 5- Cast iron (lined with cement).
So Far: Conservation of Mass and Energy Pressure Drop in Pipes Flow Measurement Instruments Flow Control (Valves) Types of Pumps and Pump Sizing This Week:
HOOVER DAM By Project Monsters Presenters: Nazimah Abdul Rahim Hakki Isik.
Heat and cold generation Meyer Hospital Florence Meeting, 8-9 May 2003.
STAINLESS STEEL PIPES. WHAT IS STAINLESS STEEL TYPICAL PROPERTIES Stainless steels are alloys containing iron, relatively low carbon, a minimum 10.5%
Hoover Dam A MODERN MARVEL. Project Overview Why Build a Dam? Before the Hoover Dam was built, the Colorado River was dangerous and unpredictable. Towns.
1 CM 197 Mechanics of Materials Chap 10: Strength of Materials Strains Professor Joe Greene CSU, CHICO Reference: Statics and Strength of Materials, 2.
STEAM CONDENSERS.
Group D: Hector Hernandez Victor Liberato Roman Rios Tania Ramirez Luis Elias.
1 Class #26 Civil Engineering Materials – CIVE 2110 Concrete Material Concrete Compressive Strength, f’ c Cracking Aging, Maturity Fall 2010 Dr. Gupta.
Concrete Construction
Evaporators For Air Conditioning
September 18, 2009 Critical Facilities Round Table 1 Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Introduction Advantages Dis-advantages Methods of Pre-stressing Mix Design Curing Laboratory Test Visit Report.
Civil Engineering Vocabulary UNT in partnership with TEA, Copyright © All rights reserved.
Natural Draft Cooling Towers
Constructive & Destructive Forces
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
11. 2 Water Energy Energy that comes from the push of water.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
Power Plant Construction and QA/QC Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Engineering Technology Division.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Mechanical Design of Process Equipment
4/12/2011Controller Cooling Test1 Array Controller Cooling Test Bill Hoffmann April 12, 2011 This is a report on a test of the chilled water-to-air heat.
Estimation of the strength development of concrete Exercise 10.
Architecture!!!!!. Hoover dam Located in the black canyon on the Colorado river dividing Arizona and Nevada. There is enough concrete in the dam to pave.
3 Easy Steps STEP 1: SITE SELECTION Select Area with Unsuitable Rock Types.
PREPARED BY: MARCIA C. BELCHER CONSTRUCTION ENGINEERING TECHNOLOGY Concrete: Fundamentals.
Heat Transfer Analysis of a Radiator Heat Transfer MEEN 3210 Dr. Li.
Change of State.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
Hoover Dam Construction. Geological Context Canyon’s tilted layers of andersite breccias Extrusive igneous rock Minerals - plagioclase, pyroxene & hornblende.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Alternative Energy: Hydroelectric Power
Refrigeration What's Refrigerated? What makes up a system?
Hoover Dam Southwest Landform Example Michelle Klepper.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 10A : INDUSTRIAL HOT AND CHILLED WATER UTILITY SYSTEM.
Unit 212/255 – Principles of Fabrication and Welding Technology
OBJECTIVE 3 Students will identify that density is a fundamental property of matter. Changes in pressure and temperature can change the density of a material.
Geothermal Energy Power from Within.
TEKS 8.10A recognize that the sun provides the energy that drives convection within the atmosphere and ocean, producing winds and ocean currents The Sun,
Warm Vessel Leveling Islands (Piers)
Heating and radiological
METHODS OF CRACK REPAIRS
HEAT TRANSFER WITH EXTENDED SURFACES (FINS)
Expansion in solids and liquids
Putt-Putt: The wonderful world of heat engines
Cast in Place 2 way Flat slabs Basically joists in both directions
Hoover Dam.
Produced by - Maniks. INDEX Sr. No Content 3Introduction 4Types of Desuperheater 5Definition of Desuperheater 6Superheated Steam/Gas? 7Desuperheating.
GOALS For the classification of cracks in the wet and hardened concrete. To diagnose cracks in concrete structures and determine their types.
Lecture Objectives: Look at the cooling side of air condition
The biggest concrete structure in the world
Engineering Technology Division
Air Conditioning System-1
KINETIC TERMS 10/16/07.
Unit 3 Nature’s Energy 1.
Lake 16 Dam Repair Presentation
Computational Methods EML3041
TxDOT Implementation Project Texas Tech University
Chapter 5: The Second Law of Thermodynamics
Presentation transcript:

The Hoover Dam

The first concrete was placed into the dam on June 6, Since no structure of the magnitude of the Hoover Dam had been constructed, many of the procedures used in construction of the dam were untried. Since concrete heats up and contracts as it cures, uneven cooling and contraction of the concrete posed a serious problem. The Bureau of Reclamation engineers calculated that if the dam were built in a single continuous pour, the concrete would have taken 125 years to cool to ambient temperature. The resulting stresses would have caused the dam to crack and crumble.[18] To solve this problem the dam was built in a series of interlocking trapezoidal concrete pours. To further cool the concrete each form contained cooling coils of 1 inch (25 mm) thin-walled steel pipe. River water was circulated through these pipes to help dissipate the heat from the curing concrete. After this, chilled water from a refrigeration plant on the lower cofferdam was circulated through the coils to further cool the concrete. After each layer had sufficiently cooled, the cooling coils were cut off and pressure grouted by pneumatic grout guns. The concrete is still curing and gaining in strength as time goes on.[19] There is enough concrete in the dam to pave a two-lane highway from San Francisco to New York.[20]