Overview of USAID Studies for the Diamer Basha Dam Project 1 Michael R. Curtis, Ph.D. Director, Energy Office USAID/Pakistan.

Slides:



Advertisements
Similar presentations
1st Meeting of the Working Party on International Trade in Goods and Trade in Services Statistics - September 2008 Australia's experience (so far) in.
Advertisements

AIMS (Administration Information Management System) Status Report ITPWG: February 3-5, 2003 World Intellectual Property Organization.
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Watershed Approaches and Community Based Planning
October 7, 2014 A Presentation to the Caddo Parish School Board by: Evergreen Solutions, LLC.
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
Costed Implementation Plans for FP2020 Date: Presented by: Costed Implementation Plan Resource Kit Produced by:
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP 1 Progress.
Cumulative Impact Assessment for the Wind Energy Sector
A Bridge to Universal Energy Access
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Information Sharing and Riparian Discussions Almaty, Kazakhstan May 17-19, 2011 Assessment Studies for the Proposed Rogun Hydropower and Regional Reservoir.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
SAMPLE IMPLEMENTATION PLAN OF A POVERTY ASSESSMENT TOOL To Report to the Management of Microfinance Association of Patharland (MAP), Patharland This proposal.
EIA Internationally Erkki Ikäheimo. EIA Internationally  Most of the “international” projects need environmental assessment or EIA (environmental impact.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Introduction A GENERAL OVERVIEW OF THE WCD FINDINGS, RECOMMENDATIONS & APPLICATION Alex Muhweezi & Chihenyo Mvoyi IUCN Uganda Country Office.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Jefferson Parkway Public Highway Authority Bidder Information Conference December 14, 2010.
T UCKER A LAN I NC. …business and litigation consulting.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
The assessment concept of innovative level of Armenia’s industry Gagik Makaryan RUEA chairman 9 September, 2013.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Achieving the MDGs: RBA Training Workshop Module 7: Synthesis of sector needs assessments and preparation of 10 year framework 9-12 May 2005.
Investment Planning and Implementation for Low Emissions Development LEDS Global Partnership Annual Workshop Punta Cana, Dominican Republic October 14-16,
Draft of Terms Of Reference For Hiring a Consultant “Study for establishing the regulation and tools in implementing of DG connection to distribution network”
In the Framework of: Financed by: Developed by: DANUBE WATER PROGRAM Professional Technical Assistance Services for Business Planning and Commercial Efficiency.
The Second Regional Workshop on capacity development for Clean Development Mechanism Siem Reap, Cambodia, March 2004 REVIEW AND FUTURE PLAN OF TASK.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
24 August 2007 EDR Effort 1 CF&S Environmental Process for an Americas Regional Effort EDR Planning Jerry Aarons & Rod Walton.
Technical Track Work Group Report Out August 22, 2012.
24 th June 2013 Challenges and barriers on Accessing Adaptation Financing. Sergi Bosque Garcia. A new climate for change.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Office of Major Project Development (OMPD) Overview November 2015.
1 Workshop “Energy Efficiency management in chemical Industry sector" Thessaloniki, Greece Use of CARE +Tools in Bulgaria energy management.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
1 Town of Dedham Energy Saving Performance Contracting.
Task 9:Fusion Power Plant Studies Status & Planned Activities
Advertising Request for Proposals September 19, 2016 Recommendation to Award.
Support to Strengthening Devolved Structures’ Capacity for Emergency Preparedness and Response (EPR) 12 th October 2016 The 4 th National Symposium on.
Principal Investigator ESTCP Selection Meeting
Monitoring and evaluation of disability-inclusive development
UNEP/Global Mechanism support for UNCCD reporting
SustainRisk Financial Governance, Social and Environmental
STATE LAW OFFICE AND DEPARTMENT OF JUSTICE
Principal Investigator ESTCP Selection Meeting
EUT 443 – ENGINEERING MANAGEMENT
THE FEASIBILTY STUDY LECTURE-5.
Enterprise Content Management Owners Representative Contract Approval
Phase 2 Tollgate Review Discussion Template
Environmental industry – an update on DG Environment activities
Due Diligence Review of Proposed Eagles Ledge Energy Refinery
The Construction Industry
North Slope Science Initiative (NSSI)
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
Environmental Commitments
Principal Investigator ESTCP Selection Meeting
Day 1: Business Case and Concept for a Sound ESMS
ABCPhD Doctoral Program in architecture, built environment and construction engineering ABCPhD Call4Scholarship 34 RESEARCH TOPIC: Automation, Robotics.
TUCKER ALAN INC. …business and litigation consulting.
Principal Investigator ESTCP Selection Meeting
Stakeholder Engagement
Q2 Updates on 2019 Board Priorities
Q2 Updates on 2019 Board Priorities
LEARNING & DEVELOPMENT STRATEGY: PROCESS OVERVIEW
Presentation transcript:

Overview of USAID Studies for the Diamer Basha Dam Project 1 Michael R. Curtis, Ph.D. Director, Energy Office USAID/Pakistan

Step 1 - Rapid Data Review - completed 2 Scopes of Work (detailed analysis) TechnicalEnvironmentalFinancial Rapid Gap Analysis Identify gaps in the existing data, information and analyses in comparison to international best practices Rapid Data Collection To collect data, information, and copies of studies and reports prepared by the GOP and other partners

USAID Support – Step 2 Environmental and Social Impact Assessment –Required under the U.S. Government Laws –Initiated Environmental and social Impact Assessment –Hired internationally credible consulting company –Estimated time – 24 months (September 2016) Financial Assessment –Pave the way for financing of the Project –Help GOP develop a realistic financing plan –RFP issued for hiring international investment firm –Estimated time – 12 months (Nov/Dec 2015) Technical Assessment –Review the dam type and design, Vis-à-vis seismology, other geographic conditions, construction phasing and value engineering –RFP issued to hire international consulting firm –Estimated time – 12 months (Nov/Dec 2015) 3

Coordination with International Financers/Donors Our efforts are to ensure that the plans meet requirements of international donors/financers. Coordinating with the ADB to review the studies and outcomes of the work 4