Floor Plan October November Early 2013 August September July Map Connections Develop Requirements/Order Equipment Deploy/Test.

Slides:



Advertisements
Similar presentations
TEACHTOWN Adapting the Program to a Tablet Application
Advertisements

United Electronic Recycling United Electronic Recycling.
Are you ready for online learning? 20 questions to measure your readiness to study online at YTC College.
Working At Home.  There has been a growing trend for many years of employees working at home  Here are some tips that companies should be giving to.
HOW WELL DO YOU KNOW THE BASICS OF USING YOUR COMPUTER?
Computer Networking By Brian Bogue. Internet Service Provider [ISP] Satellite, Wireless, Cable and Dial-up Direcway Satellite is our ISP with a connection.
CEO Juice Process for Sales Orders: Paperwork to Delivery Equipment Sales Order Process.
Google Account Basics: Getting Started with free Google applications.
Network Done by: Athra sultan.
Duties of a system administrator. A system administrator's responsibilities typically include:
Methods of communication
MANAGEMENT OF TECHNOLOGY EQUIPMENT Resource Management Associates (RMAs) will be responsible for Technology Equipment at their schools which includes:
1 Georgia Technology Authority  Your Computer will not turn on. First check to be sure the power cord is plugged in your electrical outlet and to the.
Washington SchoolSpeedTest Month Use the SchoolSpeedTest to Assess Internet Readiness For Digital Learning October 1―31 Thank you for joining us…the webinar.
Project ManagementDay 1 in the pm Project Management (PM) Structures.
The Asset Inventory Management module assists with data collection and discovery management processes. Collected information is interpreted and automatically.
Scheduling. Operation Protocol Send an application form to patients Receive the returned application form from patients Check doctor’s schedule Check.
CIS 103 — Applied Computer Technology Last Edited: September 17, 2010 by C.Herbert Wireless Home Networks.
Steps To Set Up Your Home Wireless Network You can use a wireless network to share Internet access, files, printers, and more. Or you can use it to surf.
Training PowerPoint.  Just plug into the USB port on your computer. You will find USB ports on the front or back of your computer.  If you have a laptop.
U.S. Department of Agriculture eGovernment Program July 23, 2003 eAuthentication Initiative Agency Responsibilities and Funding Discussion eGovernment.
Technology. Raptor Replaces School Check-in Computers and Touch Screens are in Raptor will install equipment and train Import students during install.
COMP 2923 A2 Basic Green IT Audit Danny Silver JSOCS, Acadia University.
Networks. A network is formed when a group of computers are connected together. Computers in a Local Area Network (LAN) are fairly close together, generally.
Computer and Information Science Ch1.3 Computer Networking Ch1.3 Computer Networking Chapter 1.
Network equipment used in a modern office
©UNT in partnership with TEA1 Telecommunications & Networking Unit Subtitle: Modems.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Brent Tufts Alex Ferreira Drew Durham Arnie Anderson Vinitha Liyanage.
Hosted Voice & Hosted Contact Center
Troubleshooting Common Printer Issues for PC. Focusing Questions What are common printer issues? How can you resolve these issues?
Introduction to Computer Networks Introduction to Computer Networks.
Ports and Connectors By Karina Hackett Overview: Ports are also known as sockets, and are located at the back of a system unit. Connectors are the parts.
RN/BSN Online Program Online Success! Technical Readiness Connect with Your Instructor Develop a Schedule Be Organized.
Visit: CompTIA A+ Practice Test Questions.
Modem. Introduction: A modem [Modulator -Demodulator] is a device. Data communication means transmitting digital information form one computer to other.
Servelite - Complete IT Solutions. Servelite IT solutions specialize in providing Home solutions and Business solutions. We focus upon delivering quality.
Standard IP Solutions - Call us Now at or Toll Free
Welcome.  Henrietta TurnerManager, License Administration Colorado Parks & Wildlife (CPW) IPAWS Project Sponsor  Ken ThomSenior IT Project Manager Governor’s.
Network and Server Basics. Learning Objectives After viewing this presentation, you will be able to: Understand the benefits of a client/server network.
October 10-13, 2006 San Diego Convention Center, San Diego California Staging and Cutting Your IP PBX “The Install”
What are the steps to Connect Epson Printer Setup for Mac OS X?
Jordan Population and Housing Census 2015
*Plug in the CAT 5 cable to the internet drop
Mobilizing Applications – GPS, LBS, Workflow, etc
YETS 2017 / 2018 Leszek Borakiewicz IT-CS-DO
Brother Printer Support Helpline Number Ireland:
Get best assistance for HP Printer Australia Dial
10 – Workstation Fleet Logistics
Society for Clinical Trials 37th Annual Meeting 2016
HP Printer Technical Support Number
ADD AN HP PRINTER IN WINDOWS 10
HP Printer Customer Support. In today’s technology era, we are surrounded with lots of devices/gadgets which we use in our day to day life. Now, we are.
TECHjOSH.COM TechJosh.com.
HP Printer Customer Support. In today’s technology era, we are surrounded with lots of devices/gadgets which we use in our day to day life. Now, we are.
LINKSYS SUPPORT NUMBER. Linksys Support Number for upgrading firewall, Installation and Repair and Connecting Device and Fix Error Messages by Linksys.
How to Fix a “Scanner Failure” Message Error when Copying, Scanning, or Faxing?
How To Install Brother Printer Without CD
Call to Fix Brother Printer in Error State
Unified Communications
Laptop & Chromebook Cart Procedures
Phone no. (00966) Visit at
Warranty process.
The second Professional Development Day is this coming SATURDAY!!
Chapter 4 : Input & Output devices Visit for more Learning Resources.
Epson Printer in Error State Dial:
Change Tested or Implemented
Now Buy Best External Door Hardware from Doorhardware
Presentation transcript:

Floor Plan October November Early 2013 August September July Map Connections Develop Requirements/Order Equipment Deploy/Test

Project Team Mike Ahern –High level project manager/communication Randy Crowell –Detailed project manager Andrew Hoyt Louwana Tortora –Service Center Staff Nathan Norris –Infrastructure Staff Satch Dzamov District/Division Team Communication contact –Pave the way –Surface issues Site visit contact –Coordinate access

Floor Plan July Map Connections August In order to make sure that the Ohio EPA is ready for VOIP we need to make sure we have done a complete check of our Network and current phone system and identify continued land line requirements. Phone Fax machine Copier Printer Computer Task NameDuration Site Testing and Mapping25 days Site Testing and Mapping NEDO3 days Site Testing and Mapping NWDO3 days Site Testing and Mapping SEDO3 days Site Testing and Mapping SWDO3 days Site Testing and Mapping DES2 days Site Testing and Mapping GFO2 days Site Testing and Mapping ERAC1 day Site Testing and Mapping of Lazarus8 days

Floor Plan July Map Connections August Phone Fax machine Copier Printer Computer Three people will be working as a team Collect all the device information about the site. Placed in a excel spreadsheet Cable Testing Two staff of the three person team will test all the network drops and mark them on the map Estimated interruption: 5 minute task for each network drop. Including the time it takes to record all the information about the drop on the network, such as what phone do they have what computer and or other devices for the drop. Estimated 3 days of work for each location 5 minutes per each drop and around 200 drops per remote location. Three people will be working as a team Collect all the device information about the site. Placed in a excel spreadsheet Cable Testing Two staff of the three person team will test all the network drops and mark them on the map Estimated interruption: 5 minute task for each network drop. Including the time it takes to record all the information about the drop on the network, such as what phone do they have what computer and or other devices for the drop. Estimated 3 days of work for each location 5 minutes per each drop and around 200 drops per remote location.

Floor Plan July Map Connections August Phone Fax machine Copier Printer Computer Satch, Brent, and the local infrastructure resource will be the three man team for each site. Easy access to network drops, computer and phone Clean, accessible area helpful having to move things around to get to the network drop will delay progress and schedule Identify “hidden” drops before we visit If you know of a phone or fax machine that is not near a network drop help the team make sure it’s not missed on the site visit. Satch, Brent, and the local infrastructure resource will be the three man team for each site. Easy access to network drops, computer and phone Clean, accessible area helpful having to move things around to get to the network drop will delay progress and schedule Identify “hidden” drops before we visit If you know of a phone or fax machine that is not near a network drop help the team make sure it’s not missed on the site visit.

Floor Plan July Confirm Map Connections August Phone Fax machine Copier Printer Computer Collected the information will be compiled A breakdown by each site with it’s map will be given back to the sites to be reviewed for accuracy. Sign off from each site that the team captured all the current phones in the building and tested a network drop for the new VOIP phone to plug into. Confirm when there is no network drop where the current phone is. 90% of the time phone drops are nothing more than cat 5 cable with an RJ45 drop with an RJ11 phone jack plugged in. If the line will pass the 1GB test then we can use that line for the new phone. If not a new network drop will have to be run and tested. Collected the information will be compiled A breakdown by each site with it’s map will be given back to the sites to be reviewed for accuracy. Sign off from each site that the team captured all the current phones in the building and tested a network drop for the new VOIP phone to plug into. Confirm when there is no network drop where the current phone is. 90% of the time phone drops are nothing more than cat 5 cable with an RJ45 drop with an RJ11 phone jack plugged in. If the line will pass the 1GB test then we can use that line for the new phone. If not a new network drop will have to be run and tested.

September Develop Requirements

September Develop Requirements Task NameDuration Network Upgrade20 days Place Order for Network Equipment3 days Receive Equipment and Inventory10 days Task NameDuration Instation of Network Equipment6 days NEDO Install1 day SEDO Install1 day NWDO Install1 day SWDO Install1 day DES Install1 day GFO Install1 day Marketing PIC3 days

October November Early 2013 Deploy/Test

Project team is developing the schedule Begin letting staff know someone will be visiting and will need access to their phone ports Send your contacts to Mike Ahern Send your initial concerns/questions to Mike Ahern

Thank you for your time and support Questions???