APPLICATIONS: WHENEVER IT IS NOT POSSIBLE TO INSTALL A RAIL SYSTEM DIRECTLY ABOVE A WORK AREA, AN ARTICULATING ARM IS A SOLUTION ARTICULATING ARMS PROVIDE.

Slides:



Advertisements
Similar presentations
Boom Lift and Scissor Lift UNIVERSAL STUDIOS
Advertisements

F&T Inc. OVERHEAD CRANE SAFETY.
Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
McDonald’s Vertical Toaster. View inside cabinet Relays Drive Train Motor with fan in place. Plate heater.
Statics Worksheet Solutions
M760 TOWER CRANES ERECTION
Honda 450 Installation Manual.
Click on this image to open the full PDF document.
Subpart R Steel Erection
Tension.
Leg Assembly A step-by step guide to the disassembly and service of a HUBO leg.
4Identifying Leakage Source (Mech/ Elec) 4Mechanical Air Leak- Down 4Mechanical Air Leak- Up 4Electronic Drift- Up/ Down 4Load Cell Operation 4Understanding.
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
Rigging Equipment for Material Handling Your Safety is the #1 Priority
1 How to Rig and Use the PowerQuick Ascender in Horizontal Applications PQ 500 Series Instruction.
BLR’s Safety Training Presentations
1 Westinghouse Non-Proprietary Class 3© 2012 Westinghouse Electric Company LLC. All Rights Reserved. Structural Analysis of a Nuclear Fuel Handling Machine.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Copyright  Business & Legal Reports, Inc.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Cranes and Slings 29 CFR and 184.
Climbing the Ladder to Safety
Crane and Hoist Training
1. How is torque calculated?. Torque = Force X length of torque arm T = F x l.
Physics 151: Lecture 26 Today’s Agenda
Senior Design: Validation of Design December 15, 2008.
FVCC Fire Rescue LADDERS.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Suntraders Company Ltd. / Anthony Kent Gibbons Industrial Park, Christ Church, Barbados BB17101 (246) Fax: (246)
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
McPherson Strut Service and Diagnosis
Levers and Pulleys. Levers A lever is a tool that people use to make work easier. Levers are used to lift things or overcome resistance. Levers give us.
Cranes and Slings 29 CFR and 184
Balancer Operation Intelift Operation Installation Troubleshooting Preventive Maintenance Preventive Maintenance OVERVIEW.
Applications of Newton’s Laws of Motion
This property of all matter to continue in its present state of motion (straight line, constant speed) is called inertia. What determines how much inertia.
Materials Handling Equipment
Copyright © 2009 Pearson Education, Inc. An object with forces acting on it, but with zero net force, is said to be in equilibrium. The Conditions for.
Physical Science Applications in Agriculture Unit Physical Science Systems.
Columbus McKinnon Corporation 125 years old. Publicly traded. More than a hoist and chain company.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Aim: More Law of Acceleration Solve for the normal force on the following diagram: 10 kg 2 N N mg ΣF = 0 2 N + N – mg = 0 N = mg – 2 N N = (10 kg)(10 m/s.
Section 5-4. A pulley is a rope wrapped around a wheel. Pulleys can change the direction or the size of a force.
Pulleys Vocab. Vocab  A Pulley is a wheel with a grooved rim in which a rope can run to change the direction of the pull (force) that lifts a load.
LEVERS AND PULLEYS Simple Machines. LEVERS: A BEAM, FREE TO PIVOT AROUND A POINT, USED TO MOVE A LOAD.
Design of Crane Components
Torque & Equilibrium AP Physics.
Copyright © 2012 American Safety Management Inc. Crane and Hoist Safety.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Visit us online at Crane Truck Sydney Services By DELTA TRANSPORT.
SBN Far Detector Installation & Integration
This is the same as both situations above Springs and Hooke’s Law k is the “force constant”
Escalator Installation
Safe Rigging Practices
Crane - lever, gear or pulley?
The Basics of Overhead Crane Pre-op Inspections
RESCUE BOAT DAVIT CME Models: D & D
MAIN 220 Industrial Rigging
Reaction Forces and Moments
Problem 1 T1 T=24 N M2 = 4 kg M1 = 2 kg Find acceleration of blocks and tension T1.
F&T Inc. OVERHEAD CRANE SAFETY.
Understanding Variable-Geometry Outriggers
Missoula Electric Coop
Takai robotics & Automation
FS ” Maximum Blade Capacity 9 HP Honda engine Weight – 141Lbs
Synthetic Chain Wire Rope
Robot Deployment System
Cranes and Hoists Standard 29 CFR Part
Mechanics Chapter 3 Vertical Motion.
Presentation transcript:

APPLICATIONS: WHENEVER IT IS NOT POSSIBLE TO INSTALL A RAIL SYSTEM DIRECTLY ABOVE A WORK AREA, AN ARTICULATING ARM IS A SOLUTION ARTICULATING ARMS PROVIDE THE ABILITY TO REACH BEYOND THE RAIL SYSTEM TO PICK UP OR SET DOWN A LOAD.

Maximum Capacity 272Kg (500 lb.) with 3M (10 ft.) Reach Carriage or Column Mounted; will install to most competitor rail Balancer Mounted Horizontally 270° Articulation at Center Pivot 360° Articulation at Mounting Pivot Internal Pulleys to Prevent Wire Rope from Resting in Bottom of Arm End of Arm Pulley Provides Vertical Lift

Maximum Capacity 272Kg (500 lb.) with 3M (10 ft.) Reach Carriage or Column Mounted; will install to most competitor rail Balancer Mounted Horizontally 360° Articulation at Mounting Pivot End of Arm Pulley Provides Vertical Lift 360° Articulation at Center Pivot

Maximum Capacity 454.5Kg (1000 lb.) Carriage or Column Mounted; will install to most competitor rail Balancer/ InteLift/ Hoist provide lifting 360° Articulation at Mounting Pivot ZRA1/ ZRA2 Vertically Mounted Rail 8 Wheel Trolley & Attachment Bracket

Runway Dual Bridge Flow of Line (FOL) Pick up Set Down Carriage

Standard Configured Products:

Standard Configured Products:

Pulleys Pulleys Abrade Wire Rope & Accelerate Wear- INSPECT DAILY- Preventive Maintenance Schedule in Service Manual MHD56162

Wire Rope Replacement- 700 & 713 Rotate Balancer Down Lower the Load to the Full Down Position- Remove Air Supply- Remove Load from Hook Remove Upper Balancer Mount Bolt Cut Wire Rope at Balancer- Install new wire rope to reel- Butt Splice New Rope to Old Rope- At End of Arm Pulley Pull Old Wire Rope Out to Feed New Wire Rope through Pulleys Reinstall Balancer- Turn on Air Supply- Keep Tension on Wire Rope while moving with no load on hook End of Arm Pulley

 Provides Reach Beyond Normal Rail System  Carriage or Column Mounting  272 Kg (500lb) Capacity- 700/ 713 Series  Kg (1000lb) Capacity- 600 Series