ACKNOWLEDGEMENT: numerous photo contributions courtesy of Robert Stephenson of Facilities Joint Use Thanks, Rob!

Slides:



Advertisements
Similar presentations
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Advertisements

Oregon Joint Use Equipment Code Descriptions Standards Subcommittee.
In the user guide section as shown below, please add all four manuals attached with this … Remove the earlier Sonic and Ideos X3 software guides.
ACKNOWLEDGEMENT: Numerous photo contributions courtesy of Robert Stephenson of CenterPoint Energy Thanks, Rob! Contributions to this photo gallery are.
One Source Smarter Packaging Solutions WELCOME TO THE SAMUEL STRAPPING SYSTEMS BALER TRAINING PROGRAM Baler Overview Making a.
Reviewing the Experience IPRO 358 The Smart Hat. Thank you and congratulations! Prof. McKinney and I (Robert Babbin) acknowledge all of you for your participation.
FEA of Wind Turbine Tower Martin Knecht. The Problem FEA modeling of a wind turbine tower. Analysis: –Stress –Deflection Want to prevent –Yielding –Excessive.
CLIMBING SPACE Section 236
ACKNOWLEDGEMENT: Numerous photo contributions courtesy of Robert Stephenson of CenterPoint Energy Thanks, Rob! Contributions to this photo gallery are.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
Cutnell/Johnson Physics 8th edition
Magnetic Field Generator: Toroid. Example: Force Between Parallel Currents Four long wires are parallel to each other, their cross sections forming the.
Electrical Power Systems
Applied Control Systems
Connectors. host! /p intoxicat! or dr*nk! or alcohol! /s guest After you have decided on the terms that you will use in your search, the next step is.
Marketing Information and Research
Photo Realistic 3D Cloud of Points
THE GOOD CLUB GUIDE EXTRA: FOR A CLUB WELFARE OFFICER.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
The Disability Services Commission has developed this training package for public authorities to use in staff training.
Team 4 “Flying Wind Turbine” Jason Landry Bryan MacDonald Scott Montgomerie Daniel Pollock Robert Ringrose Dr. Dale Retallack Team Members Supervisor.
What is a Computer HardwareStorageSoftware Random Questions.
Internal Communication Team Task  Identify better communication methods for university internal audiences  Evaluate construction of internal communication.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Environmental Assessment Survey of School Building Sarva Shiksha Abhiyan Mission Gujarat State Annexure-VI.
Systems analysis and design, 6th edition Dennis, wixom, and roth
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
1 Service Delivery Point(s) for Multi-tenant Facilities An Overview Matt Imel Sr. Tariff Specialist PG&E December 8, 2011.
ELECTRICAL DESIGN GUIDELINE STEPS Maria C. Gonzalez.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
Introduction to Vexnet
Utility Engineers, PC.  Generation  Transmission  Distribution.
Identifying Violations Exploration 3A Ms. Ripley.
Leading Effective Meetings By Jessica Kruse. Key Actions For Leading Effective Meetings  Prepare For a Focused Meeting Prepare For a Focused Meeting.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
ACKNOWLEDGEMENT: numerous photo contributions courtesy of Robert Stephenson of CenterPoint Energy Thanks, Rob!
Medical Practice Management Marketing & Customer Service Young, A. (2007). Kinn’s the administrative medical assistant: An applied learning approach (6th.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
Cupid Shuffle.  Everyone find a line on the floor and face the stage.  Now put your arms stretched out to your sides, you should not be able to touch.
New CPUC Order on Pole Attachments Wireless West Conference Anaheim, California April 21, 2016 Charlotte F. TerKeurst Program Manager Electric Safety and.
COP 3503: Programming Fundamentals for CIS Majors 2 Basics.
Safety and Access Solutions for the Wireless Industry Workforce Wireless West Conference April 21, 2016 Anaheim, California.
07/03/13Victorian Soaring Association Inc. AIRWORTHINESS COURSE VICTORIAN SOARING ASSOCIATION INC. CABLE SYSTEM - INSPECTIONS.
HNC/D Engineering Science
Children & Young People’s Service Procedures
Presented by Leighton Porter, EIT Monte R. Lee & Company
Sub Station.
Wooden stake or rebar Riparian zone Stream Riparian zone Nylon cord
Flexible System Hardware
Applied Control Systems
Applied Control Systems
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Energy Conversion and Transport George G. Karady & Keith Holbert
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
Objective Explain the procedure for installing switches, making common splices, and doing other electrical wiring tasks.
Safety Meeting Topics Standby Generator Safety
Working Drawings Legal Documents that Provide All the Visual, Numerical and Textural Information Required to Manufacture a Component, Mechanism or Structure.
2.) How are each of these illustrations related to one another?
Electrical components and systems
ST800 Service Tester, 800 Amps.
Stop! Look! Listen! Think!.
Pole Position Student Points Time
A B C D.
The photo app every contractor & supplier needs
Presentation transcript:

ACKNOWLEDGEMENT: numerous photo contributions courtesy of Robert Stephenson of Facilities Joint Use Thanks, Rob!

All four communication cables are in violation of the transformer loops

Storage of excess cable in one spot can create operational, access and possible loading concerns…

And storage of a full cable spool creates major loading concerns!

Communication cable constructed through primary power risers

Again, storing of a full cable spool creates major loading concerns!

Communication cable using streetlight arm as support for street crossing

Communication cable built through support arms of primary power

Communication cable built through transformer loops

Communication cables installed above weatherhead risers

Communication cable using power conductor for street crossing clearance

Communication cable turn guyed with rope to power

Avoiding situations such as those illustrated on the preceding pages can reduce costs, improve efficiency and promote safer working conditions…for everyone. Now that’s important! For more detailed information, refer to Section 2 (Design/Construction) of your Pole Attachment Guidelines and Procedures Manual.