NEPA, CEQA and the Renewable Energy Boom Implications for Joint Compliance Defenders of Wildlife.

Slides:



Advertisements
Similar presentations
Ron Bass, J.D., AICP, Senior Regulatory Specialist Jones & Stokes Common NEPA Mistakes and How to Avoid Them January 17, 2008 Oregon Department of Transportation.
Advertisements

National Environmental Policy Act of Establishes protection of the environment as a national priority Mandates that environmental impacts be considered.
NEPA Environmental Procedure Pam Truitt, Grants Management Consultant  September 4, 2014.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
Yuba-Sutter Regional Conservation Plan EIS/EIR SCOPING MEETING January 6, 2015.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
WETLAND REGULATORY PROGRAM Role of the U.S. Fish and Wildlife Service.
Environmental Review: NEPA, TEPA and Tribes. NEPA – good and bad for Tribes Tribes can use as tool to slow, examine, participate in process and urge changes.
Major Federal & State Approvals Environmental Business Council of New England Land-Based Wind Energy May 29, 2008 Ruth H. Silman, Esq.
Introduction to CESA Incidental Take Permits and Consistency Determinations Developed by Jennifer Deleon, Staff Environmental Scientist CESA Permitting.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
U.S. Fish and Wildlife Service Ecological Services Utah Field Office.
San Joaquin River NWR Proposed Expansion Planning Process Summer 2011 Fall 2011 Spring 2012 Summer 2012 Public Input Public Input Prepare Draft Environmental.
Endangered Species Act
The National Environmental Policy Act (NEPA)
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Module 15 Environmental Considerations Civil Works Orientation Course - FY 11.
1 State Water Resources Control Board Environmental Review for State Bond Funded Grant Projects Presented by Lisa Lee, Environmental Review Unit.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Renewable Energy and the BLM May 4, 2009 Ashley Conrad-Saydah BLM Renewable Energy Project Manager.
California Natural Resources Agency U.S. Army Corps of Engineers.
Fish and Wildlife Service Mission Conserve, protect and enhance fish, wildlife, and plants and their habitats for the continuing benefit of the American.
Endangered Species Act Section 7 Consultations. The Endangered Species Act Sec. 2:Purpose Sec. 3:Definitions Sec. 4:Listing, Recovery, Monitoring Sec.
The Endangered Species Act 1973, 1982, 1985, 1988 (ESA) Larsen Schlachter Per. 3.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
The Endangered Species Act: Species Listings and Implications for Development in Alaska Presented by: Cherise Oram Stoel Rives LLP.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
CORPS OF ENGINEERS SECTION 404 INDIVIDUAL PERMIT EVALUATION PROCESS July 22, 2005.
The Intersection of the National Environmental Policy Act and the Magnuson-Stevens Fishery Conservation and Management Act November 4, 2010 Roger Williams.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
UNDERSTANDING THE ENDANGERED SPECIES ACT. What is the ESA? Federal Law : 1973 (USA), 1976 (Canada) protecting wildlife & plants Conserve & recover species.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
Planning and Permitting Part II: Permitting Overview S.P. Cramer & Associates, Inc. 636 Hedburg Way, Suite 22 Oakdale, CA
Fish and Wildlife : Regulatory Framework and Challenges Cherise M. Oram STOEL RIVES LLP Hydrovision 2008 Ocean/Tidal/Stream Power Track 7D “Environmental.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
Why Conserve Swainson’s Hawks?. Two Reasons Endangered Species Act –Section 2080 –Incidental take permit –HCP CEQA –Mandatory finding of significance.
Defenders of Wildlife Species we are helping to protect.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
1 Completing the CEQA Checklist Terry Rivasplata.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
1 Findings and Board Resolution Steven Blum. 2 CEQA Findings in the Board Resolution  Resolution or separate appended document contains findings critical.
California Department of Fish and Wildlife’s Role in Timber Harvest Review.
Renewable Energy in California: Implementing the Governors Renewable Energy Executive Order California Energy Commission Department of Fish and Game Fish.
NEPA Revival in California: Strategies and Lessons from the Renewable Energy Boom Environmental Law Institute Seminar, April 29, 2010 David J. Lazerwitz.
United States Department of Interior Bureau of Land Management Winnemucca District Draft Resource Management Plan and Draft Environmental Impact Statement.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
1 EIS CONTENT & USE: ROBERTSON v METHOW VALLEY CITIZENS COUNCIL (207) FACTS  CHALLENGE TO ADEQUACY OF EIS FOR FOREST SERVICE PERMITS FOR SKI RESORT ON.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
Welcome to the Public Comment Hearing on the Proposed Regulatory Update to the California Environmental Quality Act AB 52, Gatto (2014) Heather Baugh Assistant.
California WaterFix Aquatic Science Peer Review Sacramento, California April 5, 2016.
1 “Fair Argument” Test Triggering EIR: Friends of “B” Street v City of Hayward Facts & Issue Trial court: city abused discretion in adopting negative declaration.
Overview of Everything You Need to Know About Mitigation.
U.S. Fish and Wildlife Service Migratory Bird Program Conserving America’s Birds Addressing Migratory Birds in NEPA Migratory Bird Conservation for Federal.
National Environmental Policy Act and Endangered Species Act Compliance in the Bureau of Land Management.
Barriers and Challenges to Developing Renewable Energy Projects
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Overview What is the CEQA environmental review process?
Fifth Standard Solar Project Complex
SEQRA as a Tool to Review Energy Projects
Unit 6 NEPA.
Presentation transcript:

NEPA, CEQA and the Renewable Energy Boom Implications for Joint Compliance Defenders of Wildlife

title here text here Overview Comparison of relevant NEPA and CEQA requirements. Discussion of issues with joint compliance Two case studies: Ivanpah Solar Thermal Generating System and Calico Energy Solar Farm.

Defenders of Wildlife title here text here Differences Between NEPA and CEQA NEPACEQA Environmental ImpactsAgency decisions must be founded on a reasoned evaluation of the relevant factors. *Procedural requirement only. Direct and indirect significant effects of the project on the environment must be clearly identified and described, giving consideration to both the short-term and long-term effects. *Agency must respond pursuant to CEQA Guidelines, section 15002(h). MitigationAgencies must include a discussion of the means to mitigate adverse environmental impacts of projects. 40 C.F.R. § (h). Agencies must adopt feasible mitigation measures (or feasible alternatives) in order to substantially lessen or avoid significant impacts. AlternativesEIS must devote substantial treatment to each alternative and rigorously evaluate all reasonable alternatives, including the proposed action, in a comparative form. Alternatives must be discussed in “meaningful detail”.

Defenders of Wildlife title here text here Differences Between NEPA and CEQA (Cont’d) Procedural Requirements  Generally no public review needed for FONSI.  Public review requirement for Negative Declaration. Public Comment45 days is required for a draft EIS. BLM has allowed 90 days for renewable projects on public land. 45 days is required for a draft EIR published by a state agency. Interagency ConsultationThe EIS should be drafted in conjunction with other agency permitting procedures. The EIR should be drafted in conjunction with other agency permitting procedures.

Defenders of Wildlife title here text here NEPA and CEQA Joint Compliance The environmental document will satisfy the requirements of both NEPA and CEQA. State and federal agencies jointly draft and release a DEIR/DEIS, follow the requisite procedural requirements, and ultimately release an FEIR/FEIS.

Defenders of Wildlife title here text here Problems with Joint Compliance NEPA and CEQA have differing procedural timelines – public comment, interagency consultation, etc… NEPA and CEQA have differing substantive requirements – alternatives, mitigation, etc… NEPA and CEQA differ in definition of scope of environmental impacts. Removal, translocation or relocation of listed species requires approval of wildlife agency (usually only USFWS).

Defenders of Wildlife title here text here Renewable Energy Projects in California Executive Order S Retail sellers of electricity shall serve 33 percent of their load with renewable energy by Over 50 ARRA-eligible “fast-track” projects are proposed in California, ranging from a few hundred acres to 10,000 acres. Around 200 total renewable projects are proposed in California.

Defenders of Wildlife title here text here State Jurisdiction California Energy Commission (“CEC”) has siting authority for solar thermal and geothermal power plants over 50 MW. CEC site certification process is a certified regulatory program. The Staff Assessment is a functional equivalent of an Environmental Impact Report.

Defenders of Wildlife title here text here Federal Jurisdiction BLM must issue a right- of-way and a site specific amendment to the California Desert Conservation Plan. These actions trigger NEPA and ESA requirements.

Defenders of Wildlife title here text here NEPA, CEQA and Wildlife Projects on BLM land trigger section 7 of the Endangered Species Act. BLM as lead agency under NEPA must analyze significant impacts to wildlife. CEC has interpreted its organic law, the Warren-Alquist Act, as allowing the agency to supercede the California Department of Fish and Game’s incidental take authority. Therefore, the CEC issues its site certification “in lieu” of a state incidental take permit. CEC as lead agency under CEQA must also mitigate impacts to non-listed, special status species.

Defenders of Wildlife title here text here Examples of Affected Species Migratory birds – Golden eagle, burrowing owl. Reptiles – desert tortoise, flat-tailed horned lizard. Rare plants – White-margined beard tongue, Mojave milkweed, Rusby’s desert mallow. Mammals – American badger, Nelson’s bighorn sheep, desert kit fox, giant kangaroo rat.

Defenders of Wildlife title here text here Desert Tortoise State and Federally listed threatened. Declining throughout its range due to the cumulative load of human caused and disease- related mortality accompanied by habitat destruction, degradation, and fragmentation. Predation also a major issue. Many CA population are genetically distinct. Ivanpah population found at high altitude.

Defenders of Wildlife title here text here Ivanpah and Calico solar thermal projects

Defenders of Wildlife title here text here First in Line: Ivanpah Solar Thermal Proposal Demonstrates New Challenges 800 MW gas-fired power plant can be sited on acres. 400 MW Ivanpah plant is proposed to be sited on approximately 4,000 acres. Alternatives analysis limited to “project” and “no-project”. BLM later issued a supplemental EIS to fully analyze two separate site reconfiguration alternatives. Nested, in-lieu fee mitigation program is untested.

Defenders of Wildlife title here text here Calico Solar Thermal Proposal: an “Amicable Divorce” CEC and BLM staff had begun drafting a SA/DEIS. After time constraints made the joint document impossible, they separated. Possible issues: scope of alternatives, public comment period, mitigation, interagency consultation.

Defenders of Wildlife title here text here When do we get our new habitat? (or, the problem with in-lieu mitigation) In-lieu mitigation – applicant pays into a fund, which is later used for habitat acquisition, habitat enhancement or management actions. When are the lands acquired? Where are they located? What are the habitat enhancement actions? Desert Renewable Energy Conservation Plan and interim measures. –Identify geographic areas designated for renewable energy project development. –Identify areas for conservation and declining species management. Interim “interim” measures?

Defenders of Wildlife title here text here Desert Tortoise Translocation All desert tortoises must be translocated from the site in Spring or Fall. Desert tortoise translocations are risky: disease, predation, and lack of forage. Ft. Irwin translocation – 252 of 600 tortoises translocated in 2008 died. Additional translocation of 1,000 tortoises on hold.

Defenders of Wildlife title here text here What about Programmatic Review? BLM and DOE are developing a Solar Energy Development PEIS. Assess environmental impacts associated with the development and implementation of agency-specific programs that would facilitate environmentally responsible utility-scale solar energy development in AZ, CA, CO, NM, NV and UT. PEIS will identify impacts, mitigation and two alternatives. Agency-specific actions can tier from it. Also see the Desert Renewable Energy Conservation Plan.