SolarCurrents - Customer-Owned Expansion Phase 2 Program Overview MREP Solar Committee Meeting December 12, 2012 Julie Londo, Program Manager.

Slides:



Advertisements
Similar presentations
October 16, 2013 Feed In Tariff (FIT) and Renewables Procurement in Ontario Dirk van de Waal – Business Analyst, Renewables Procurement.
Advertisements

Meeting with Rep. _______________ Solar Industry Representatives May 5, 2010.
A Workshop for Solar Installers The Berkeley FIRST Program Financing Initiative for Renewable and Solar Technology.
SolarCurrents TM Rebuild Ypsilanti Julie Londo August 26, 2010.
The Nuts and Volts of Community Solar... USGBC Green Scene RJM Construction 701 North Washington Avenue February 26, 2015 Brian Ross, AICP, LEED GA.
SRC Application Process Fall 2014 Version: November 12, 2014.
United States Representative Gabrielle Giffords Presents Solar Power for the Home: Getting Started The 8th District of Arizona
Solar Energy Presentation Watergate-Emeryville Hattie Carwell March 12, 2009.
Solar Incentives for Arizona Public Service, Salt River Project, Tucson Electric Power.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
What - How Does Solar System Work? Grid-connected projects can apply for Net Metering (utility meter spins backwards)
State Incentives for Renewable Energy and Energy Efficiency: Public Utilities Commission Programs Manchester Community College, April 7 th, 2011 Kate Epsen.
Welcome and Introductions CoServ Presentation & Member Input.
1 RELIABILITY AFFORDABILITY ENVIRONMENTAL STEWARDSHIP Bringing Solar to the Community Jennifer Szaro, Orlando Utilities Commission.
LAKELAND ELECTRIC Pricing to Meet Net Meter Rules APPA 2009 Business & Finance Conference Sept 14, 2009 Jeff Sprague Manager Pricing & Rates.
Integrating Renewables – A Utility Perspective Jennifer S. Szaro OUC ~ The Reliable One.
Genesis Solar Module Brochure ™
Lori Singleton Manager, Sustainability Initiatives and Technologies September 15, 2010 SRP’s Sustainability Initiatives and Programs.
ORECA Director Education Conference June 2, 2015 Jeff Beaman, Member Services Director Central Electric Cooperative The Road to Community Solar.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
Discussion of Feed-in Tariff Pilot Programs September 18, 2013 Presentation to the Regulatory Flexibility Committee of the Indiana General Assembly 1.
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
1 Implementation of the Solar RPS in New Jersey ABA Renewable Energy Panel November 16, 2005 Jan Pepper.
1 Emerging Renewables Program Solar Conference North State Renewable Energy Chico, CA March 10, 2005 BILL BLACKBURN Lead, Emerging Renewables Program California.
DTE Energy Commercial & Industrial Energy Optimization Program Energy Efficient, Sustainable Detroit DTE Energy Headquarters December 9, 2010.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
2009 Bidders Workshop Attachment D August 3, 2009.
Creating A Greener Energy Future For the Commonwealth Procurement of Renewable Energy on Landfills January 19, 2010 Courtney Feeley Karp, Esq.
July 9, 2010, AB 920 Workshop Pacific Gas and Electric Company.
New Jersey Board Of Public Utilities Office of Clean Energy Air Innovations - Chicago August 10,2004 NJBPU - OCE New Jersey’s Solar Program An Integrated.
1 Renewable Energy at Closed Landfills June 17, 2009 Jim Christo Massachusetts Renewable Energy Trust.
Net Metering Fall 2009 Customer Meetings. What is Net Metering?  Net metering allows the meter to “run backwards” and record generation in excess of.
Cost of Going Solar in DC 4 Ways to Save! 1.DC Rebate $3/watt up to 3KW…. 2.Federal Tax Credit 30% of Total 3.Savings on your energy Bill (Net Metering.
AmerenUE SHOW ME SOLAR June 15, 2010 MISSOURI NET METERING AND SOLAR REBATE PROGRAM Lisa Cosgrove – Renewables Specialist.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
Presented By: Diana Golis Energy Innovations Summit Small Hydro: Opportunities & Challenges Holy Cross Energy October 27, 2014.
Smart Energy Smart Energy July 28, Smart Energy.
March 2012 CONFIDENTIAL AND PROPRIETARY CA REC Market Update FOR.
Michigan Public Service Commission Renewable Energy Overview 2011 GLREA Energy Fair Jesse Harlow Engineer, Renewable Energy Section Michigan Public Service.
New Jersey’s Clean Energy Program: 2011 Renewable Energy Plan Overview of Final Compliance Filing REC Meeting 12/7/10 Charlie Garrison.
Julie Baldwin Renewable Energy Section Michigan Public Service Commission Michigan Renewable Energy Program Bioenergy Committee.
Southern California Edison SM Southern California Edison Company Proposed AB920 Net Surplus Compensation Rate [NSCR] July 9, 2010.
2008 Bidders Workshop Attachment D April 11, 2008.
Putting the U in Community Solar Creating a Local, Meaningful University Offset Program Myron Willson, U of U Sustainability Resource Center Director Stephanie.
2014 Distributed Generation Contracts Program - Megawatt Allocation Plan Tentative Scenarios Thursday, November 7, 2013.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
Program Overview Solar resource will be built by j uwi, (pronounced “you-vee”), a developer based out of Boulder, Colorado. Solar farm will be located.
The time to jump into SOLAR is … NOW! Lindsay Joye, P.E. Solar Program Manager City of Palo Alto Utilities November 5, 2015.
WSSC Solar PV PPA Phase 2 Rob Taylor Energy Manager May18, 2016.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
SOLAR*CONNECT COMMUNITY SM COMMUNITY SHARED SOLAR GARDENS Centrally-located solar PV arrays that provide electricity to participating subscribers.
SOLAR*CONNECT COMMUNITY SM David Donovan, General Manager, Customer and Community Service March 1, 2016.
Sunverge Energy – SGIP Overview
Carbon Free Energy with Storage 2017 JOINT REQUEST FOR OFFERS
Solar in NYC – Pratt SOLAR ENERGY SYSTEMS David Buckner President
Erin Buchanan Iowa League of Cities Annual Conference
Meeting Your Renewable Goals
Customer Dedicated Solar
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Environmental Sustainability Manager
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Solar Panels on Your Home & in Your Community
Photovoltaic Systems Engineering Application to PV Systems
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
PG&E EV Fleet Program.
PG&E EV Fleet Program.
PA Supplier Workshop Net Metering September 10, 2019.
The Seller’s Webinar will begin promptly at 1:03
Presentation transcript:

SolarCurrents - Customer-Owned Expansion Phase 2 Program Overview MREP Solar Committee Meeting December 12, 2012 Julie Londo, Program Manager

A quick look at the results of Phase projects commissioned as of 12/12/12 (20 pending) 75/25 split between residential and non- residential based on number of projects (60/40 based on capacity) Projects located in all 13 counties of DTE Energy’s electric service territory Highest concentration of projects by City - Ann Arbor (54) - Detroit (21) - Ypsilanti (15) Average capacity factor ≈ 12%

Program Incentives – Phase 2 3 Program Incentives *Pricing will be reviewed prior to each offering. Program ParameterResidentialNon-Residential Program Capacity1.5MW0.5 MW (One-time) up-front payment$0.20/W initially*$0.13/W initially* Ongoing Payment$0.03/kWh initially*$0.02/kWh initially* Agreement termUntil August 31, 2029 Eligible system size1-20kW DC Award method Random selection process to award four 500- kW offerings of capacity released, from 2013 through 2014 New pricing reflects updated market pricing in installed cost of PV systems and different economics for residential / commercial customers Discrete offerings of capacity to control pace of subscriptions and avoid stampede for available kilowatts Desire to incentivize better system design and maintenance (new pricing reflects 30/70 split between up front and ongoing incentive components vs. 50/50 split in Phase 1) Note: (over 2.5MW of projects are active in Net Metering Program since Phase 1 concluded with 1.1MW fully commissioned)

Program offering timeline 4 The new process drives controlled approval, and quicker construction, of projects −Approximately 2 ½ months from program launch until project selection −10 months from project selection until completion deadline. Planned offering schedule −Jan 2013– 500kW −Jun 2013– 500kW −Jan 2014 – 500kW −Jun 2014 – 500kW −Feb 2015 – remnants SolarCurrents Customer-owned Program Launch Timeline Offering kW (375kW Res / 125kW Non-Res) Actual Date Offering Launches – Customers apply Day One 1/7/ a.m. Application Deadline30 days 2/5/ p.m. SolarCurrents team completes review of applications 5 business days2/12/2013 Random Selection Event held (if required) Within 10 business days 2/18/2013 Selected Projects Posted on SolarCurrents website 24 hours2/19/2013 Submit Interconnection Application 20 business days 3/19/2013 Submit invoice or project quote, site plan and PVWatts annual solar production form 40 business days 4/16/2013 Project Completion Deadline10 months12/16/2013

Random Selection Event Reasons for random project selection award method  Spreading out kW available for length of RPS program 2015 compliance target  Scheduled offerings of kW over time creates opportunities for customers to participate throughout the duration of the program How it works  Applications will be assigned a unique id number keeping customer identities confidential  Numbered balls representing eligible applications will be randomly drawn until the capacity is awarded for the phase  The drawing process stops when total kW capacity exceeds the offering limit  Any capacity not commissioned in an offering will be added the 2015 offering  Any overage of capacity awarded reduces size of next offering  Customers not selected will have to reapply for future offerings  All customers will be informed via within 24 hours of selection  Results will be posted on the DTE Energy Web site (dteenergy.com/SCresults) within 24 hours of selection 5

SolarCurrents Agreement 6 New for Phase 2: Agreement will be mailed upon selection of project Within 10 months of receiving notification of project selection, project must be ready for DTE Energy commissioning or the project may be subject to removal from participation in the SolarCurrents Customer-owned Pilot Program The contractual end date for every commissioned project is August 31, 2029 regardless of commissioning year Customers shall grant access rights to DTE Energy to obtain information regarding design, cost or performance of the solar PV energy system that participates in the DTE Energy SolarCurrents Customer-owned Pilot Program. Customers will be notified prior to scheduled visit.

Process Checklist 7 Step 5: Submit documentation. Within 40 business days of notification of project selection, provide commitment to complete project within 10 months by submitting: ~ Detailed site plan indicating placement of solar panels, including trees, buildings and other structures near the PV installation, and site orientation relative to True North. ~ Invoice showing proof of equipment purchased or document between installer and customer showing agreement to install solar PV system indicating down payment on project. ~ The completed annual solar production form by visiting the PVWatts website:

SUN(4786)

9 Residential example of $0.20/$0.03Non-Residential example of $0.13/$0.02 Solar PV system size5,000 watts Solar PV system cost$30,650* Applicable Federal Tax Credit, if applicable (up to 30%) $9,195 Up-front REC payment upon installation$1,000** Ongoing yearly REC payment for kWh generated over 16 years $2,736*** (term of Agreement depends on project commissioning date) Estimated Reduction In Electricity Costs over 16 years (Net Metering Generation Savings) $11,840**** Total Estimated Savings over 16 years$24,771 *assumes $6.13 per watt installed **in the form of a check *** will appear as a credit on DTE Energy Electric Bill ****based on residential electric service rates and estimated generation of 500kWh per month for 12 months Solar PV system size5,000 watts Solar PV system cost$30,650* Applicable Federal Tax Credit, if applicable (up to 30%) $9,195 Up-front REC payment upon installation$650** Ongoing yearly REC payment for kWh generated over 16 years $1,824*** (term of Agreement depends on project commissioning date) Estimated Reduction In Electricity Costs over 16 years (Net Metering Generation Savings) $11,105**** Total Estimated Savings over 16 years$22,774 *assumes $6.13 per watt installed **in the form of a check *** will appear as a credit on DTE Energy Electric Bill ****based on residential electric service rates and estimated generation of 500kWh per month for 12 months Res vs. Non-Res Pricing Examples

To date, Detroit Edison has built or contracted for approximately 700MW of renewable capacity Detroit Edison has already contracted for ~700 MW of new renewable capacity: L’Anse Warden 17 MW Biomass Baraga County Eagle Valley 3 MW Landfill Gas Oakland County Smiths Creek 3 MW Landfill Gas St. Clair County Stoney Corners 32 MW Wind Missaukee County Gratiot Wind Energy 212 MW* Wind Gratiot County SolarCurrents Pilot: 7 MW contract ed Located at customer /company sites across SE MI ~600 customer-owned projects once complete * Detroit Edison’s capacity equals 102.4MW Detroit Edison owned projects Third party owned projects Tuscola Bay 120 MW Wind Tuscola County Tuscola Wind MW Wind Pending MPSC approval Thumb Wind Farms ~110 MW Wind Huron & Sanilac County 10 Megawatts Wind684 Biomass17 Solar7 Landfill Gas6 Echo ~110 MW Wind Huron County