Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,

Slides:



Advertisements
Similar presentations
City of North Liberty North Liberty Area Development Corporation University of Iowa Community Credit Union Economic Development Partnership Project October.
Advertisements

Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
G LASGOW R EGIONAL L ANDFILL M ETHANE R ECOVERY TO E LECTRIFICATION P ROJECT GOVERNOR’S ENERGY CONFERENCE By Mayor Rhonda Riherd Trautman.
1 Informational Meeting March 5, 2003 Perry Township Administration Building Delmar Addition/Glenn Avenue Sewer Improvement Area.
CUMBERLAND COUNTY BOARD OF COMMISSIONERS April 19, 2010 Presented by: Tom Cooney – Director, Cumberland County Public Utilities Department 1.
AIRPORT AREA INFRASTRUCTURE TIF DISTRICT: Public Hearing Presentation Oct 21, 2013.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
OLD KINGS ROAD Special Assessment District. Overview History Phased Project Initiating Special Assessment Next Steps.
COOPERATIVE Border To Border Broadband Conference February 5 th, 2014 Fiber to Homes, Farms and Businesses.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
OLD KINGS ROAD Special Assessment District. Overview History Phased Project Current Status.
RETROFIT POLICY FOR GRANT FUNDED PROJECTS Utilities Department Orange County Board of County Commissioners September 23, 2014.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Board of County Commissioners Allen County, Ohio Tuesday, May 1 st, 2001 Presented By: Stephen M. Kayatin, Sanitary Engineer Ryan Rase, Business Manager.
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
Utility Extension Project
Innovation Strategies Presented to MODE January 2014.
Prepared by National Flood Services Flood Insurance It’s more than just a lender requirement – don’t get left behind… 1.
ANNUAL REPORT MANY CULTURES, ONE BRIGHT FUTURE! Board of County Commissioners August 19, 2014.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
BITHLO COMMUNITY WATER Utilities Department Orange County Board of County Commissioners December 18, 2012.
Beech Grove, Indiana TAX INCREMENT FINANCING Heather R. James, Ice Miller LLP April 18, 2013.
Long Range Facility Planning assisted by Silver Falls School District.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Back Creek Floodplain SEPTEMBER 2, Why are we here Introductions Almost 300 parcels affected by revised flood study of Back Creek Outline ◦History.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Page 1 Town of Williamston Water Rates. Page 2 Page 3 Major New Costs Incurred Due to MCRWASA Plant Coming On Line Extra staff time: $10,000 (estimated)
Water System Consolidation and Restructuring Scott Torpie Washington State Department of Health Drinking Water Advisory Group November 3, 2014.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
1 Construction Assessment Hearing May 23, 2001 Shawnee Middle School Cafeteria.
Southwood Waterline Project Shawnee Twp. House 7:30 PM November 29 th 2000.
Potential Sources of Financial Assistance to Connect to the New Sewer PRESENTED BY SHERYL FLORES AND ALMA AGUILAR 11/5/2015.
Roadway Median Tree Program Public Works Department July 13, 2015.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
Update Presented by Neighborhood Services Division Board of County Commissioners April 6, 2010 Census 2010… IT’S IN OUR HANDS!
City of Key West Stormwater Fund Fiscal Year Half-Year Budget Review April 20, 2010.
Hummock Pond Road Bike Path Implementation Update January 25, 2012.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
Mandatory Connection 1 st Information Meeting. Review project Explain mandatory connection process via Frequently Asked Questions Answer questions Supply.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
MWRA WATER SOURCE TOWN MEETING OCTOBER 05, :30 PM NR HIGH SCHOOL PERFORMING ART CENTER.
Pasco County “Budget 101” OFFICE OF MANAGEMENT & BUDGET.
1 Standards and Construction Specifications Manual Orange County Utilities February 13, 2007.
Preparing for the future. With Infrastructure.
DORSET Water System Information Meeting
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Eastham Water System Board of Selectmen Meeting February 1, 2016
FY Proposed Budget and Rates
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Utilities Department Wedgefield Water November 28, 2017.
Springbrook Estates Sewer Improvement Area Informational Meeting
City-wide LED Street Light Conversion Program
CAPITAL PROGRAM OVERVIEW
Transportation Regional Incentive Program
Board Retreat November 7, 2007
Biltmore C Proposed Water & Sewer Improvement Project
Town of Bergen Water District (WIBA No
Ward Park Restroom Timeline
Presentation transcript:

Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson, NC (252)

Presentation Outline History of Project History of Project Water System Details Water System Details Signup Information Signup Information Benefits Benefits Questions? Questions?

History of Project Land Use Plan identified need for water throughout the county Land Use Plan identified need for water throughout the county Vance County Water District formally established (Oct. 4, 2004) Vance County Water District formally established (Oct. 4, 2004) Preliminary Engineering Report Completed (Engineering firm: Hobbs and Upchurch Associates) Preliminary Engineering Report Completed (Engineering firm: Hobbs and Upchurch Associates) Jan – March; 1 st set of public meetings Jan – March; 1 st set of public meetings March – April; Public information meetings March – April; Public information meetings May; Bond Referendum for $27 million passed May; Bond Referendum for $27 million passed October; USDA committed funds to Phase 1A (loan) October; USDA committed funds to Phase 1A (loan) November; USDA granted $1 million grant November; USDA granted $1 million grant December; notified of $1 million grant from NC Rural Center December; notified of $1 million grant from NC Rural Center

History Cont January; VC Water Board approved rules and regulations; Requirement of USDA January; VC Water Board approved rules and regulations; Requirement of USDA January; Authorization for beginning of engineering field work concurrent with sign up campaign January; Authorization for beginning of engineering field work concurrent with sign up campaign July – preliminary design complete; shovel ready July – preliminary design complete; shovel ready October – Kittrell Water Association expressed interest in Phase 1B; Application made to USDA for Phase 2A & 2B funding. Application made to NC Rural Center for $1,000,000 grant for Phase 2A & 2B. October – Kittrell Water Association expressed interest in Phase 1B; Application made to USDA for Phase 2A & 2B funding. Application made to NC Rural Center for $1,000,000 grant for Phase 2A & 2B. November – Sign up campaign officially began with mass mailing and signup meetings (12/1, 12/3, 12/10). November – Sign up campaign officially began with mass mailing and signup meetings (12/1, 12/3, 12/10) March – Made aware of successful funding for Phase 2A and 2B March – Made aware of successful funding for Phase 2A and 2B April – Sign up campaign for Phase 2 with mass mailing and signup meetings April – Sign up campaign for Phase 2 with mass mailing and signup meetings (4/15, 4/19, 4/26) Finalized water purchase agreement with City of Henderson Finalized water purchase agreement with City of Henderson Phase 1A Tank Site Secured; Location off of Warrenton Road Phase 1A Tank Site Secured; Location off of Warrenton Road.

History Cont Secured meter vault site (connection site to City of Henderson); Secured meter vault site (connection site to City of Henderson); Project advertised for bidding; Selected local contractor H.G. Reynolds to complete the construction; Project advertised for bidding; Selected local contractor H.G. Reynolds to complete the construction; Water Tank advertised for bidding; Selected Caldwell Tanks from Kentucky Water Tank advertised for bidding; Selected Caldwell Tanks from Kentucky July 9, 2012 – Official start of Construction for Phase 1A(anticipate 9-12 months of construction); July 9, 2012 – Official start of Construction for Phase 1A(anticipate 9-12 months of construction); Anticipate construction beginning on Phase 2 in Spring Anticipate construction beginning on Phase 2 in Spring 2013.

Phase 1A Phase 1A Total Projected Cost - $7,829,000 Total Projected Cost - $7,829,000 Total Project Miles – approx. 60 miles Total Project Miles – approx. 60 miles PROJECT SIZE REDUCED BASED UPON SIGNUPS PROJECT SIZE REDUCED BASED UPON SIGNUPS Total Signups – approx. 825 of which 580 are located along roads that will be served. Total Signups – approx. 825 of which 580 are located along roads that will be served. Revised total cost – approx. $5.1 million Revised total cost – approx. $5.1 million Revised mileage – approx. 35 miles. Revised mileage – approx. 35 miles. Received $2 million grant (25%) Received $2 million grant (25%) Phase 1B (Kittrell Water Assoc.) Phase 1B (Kittrell Water Assoc.) Total Project Miles – approx. 35 miles Total Project Miles – approx. 35 miles Phase 2A Total Projected Cost - $3,898,400 Total Project Miles – approx. 28 miles Total Signups to date – 363 Received 42% grant – stimulus money Phase 2B Total Projected Cost - $6,034,750 Total Project Miles – approx. 44 miles Total Signups to date – 365 Received 33% grant – stimulus money Water System Details (see map)

Signup Information Connection fee Connection fee Incentive connection fee of $125 vs. $750 during construction vs. $2,000 following construction. Incentive connection fee of $125 vs. $750 during construction vs. $2,000 following construction. Need 12 – 14 houses per mile or 80% signup along a given road segment for service. Need 12 – 14 houses per mile or 80% signup along a given road segment for service. Tap Options (Wet vs. Dry Tap) Tap Options (Wet vs. Dry Tap) Wet Tap: Pay $125 connection fee upfront plus $50 inspection fee for total of $175. Water billed at prevailing rate once operational. Owner responsible for water service line to house. Wet Tap: Pay $125 connection fee upfront plus $50 inspection fee for total of $175. Water billed at prevailing rate once operational. Owner responsible for water service line to house. Dry Tap Option 1: Pay $125 connection fee upfront. Once operational pay minimum fee of $20 per month. Property owner will be responsible for $50 inspection fee when/if service line installed. Owner responsible for water service line to house. Dry Tap Option 1: Pay $125 connection fee upfront. Once operational pay minimum fee of $20 per month. Property owner will be responsible for $50 inspection fee when/if service line installed. Owner responsible for water service line to house. Dry Tap Option 2: Pay one time fee of $800 ( 1” tap) with no intended use of water. This option is not counted in 80% participation requirement. Dry Tap Option 2: Pay one time fee of $800 ( 1” tap) with no intended use of water. This option is not counted in 80% participation requirement. Estimated Monthly Bill Estimated Monthly Bill $35-$45 (5000 gallons/mo); $35-$45 (5000 gallons/mo); Following bid estimate closer to $53 Following bid estimate closer to $53 for 5000 gallons/mo. for 5000 gallons/mo.

Benefits of Water System Safety – secured, regulated, constantly monitored; less likely to contamination than private wells. Safety – secured, regulated, constantly monitored; less likely to contamination than private wells. Reliability – ongoing and sustainable during power outages, drought condition, etc. Reliability – ongoing and sustainable during power outages, drought condition, etc. Quality – wells more subject to contamination; discoloration, noticeable odor or high mineral content in well water common. Quality – wells more subject to contamination; discoloration, noticeable odor or high mineral content in well water common. Drought Resistant Drought Resistant Rural fire protection Rural fire protection Reduced ISO insurance ratings Reduced ISO insurance ratings Reduced up front costs of wells and pumps Reduced up front costs of wells and pumps Economic Development - Ability to encourage and attract new development while enhancing existing development Economic Development - Ability to encourage and attract new development while enhancing existing development Ability to utilize wells for outside uses (washing car, watering flowers, etc.) Ability to utilize wells for outside uses (washing car, watering flowers, etc.) Great investment for Vance County’s future Great investment for Vance County’s future

Questions?