BROOKHAVEN SCIENCE ASSOCIATES Manufacturing and Quality Assurance Magnet Production Workshop Frank DePaola April 11-12, 2012.

Slides:



Advertisements
Similar presentations
…your final connection. Mine Cable Services Corporation. Cable Repairs: Vulcanized Splices.
Advertisements

Injection Molding Dr.Apiwat Muttamara.
Sheet metal processing
TOOLING. WHAT IS REQUIRED OF THE TOOL? support weight of the part support weight of the part maintain structural integrity and dimensional stability following.
TAREK A. TUTUNJI Rapid Prototyping. Prototype A prototype can be defined as a model that represents a product or system. This model is usually used for.
SPRAY-UP. WHAT IS SPRAY-UP? one or more continuous fiber rovings fed through a chopper one or more continuous fiber rovings fed through a chopper fiber.
Tire Servicing Program. Agenda WorkSafeBC Requirements Definitions Responsibilities General safety.
Summary of the end part design process using BEND R. Bossert February 14, 2013.
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
Manufacturing Processes
Guidelines for the Development of Process Specifications, Instructions, and Controls for the Fabrication of Fiber-Reinforced Polymer Composites by Liquid.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Electrical Issues John Escallier, NSLS-II Project To achieve high quality electrical characteristics for storage.
Estimation of Engine Frictional Power P M V Subbarao Professor Mechanical Engineering Department Understand and Analyze All means of Power Draining…
MACHSEAL 101. Design Information Stationary rotary face seal that utilizes axial spring force to positively mate the optically flat seal face against.
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
3- Pipsqueak Piston and Cylinder. Work holding in the Lathe Collets have definite advantages over chucks in gripping work pieces in the lathe. They apply.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
2313 W Sam Houston Parkway NSuite 105Houston, TX77043 (T): (F): ROK FLEX M Application Instructions.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Mechanical Engineering Issues Sushil Sharma, NSLS-II Project The NSLS-II storage ring requires multipoles and.
Gage Blocks.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet Design Workshop: Magnet Design and Analysis Charles Spataro, NSLS-II Project NSLS-II is a new 3Gev synchrotron.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Gage Blocks Unit 12.
Vacuum Fundamentals High-Vacuum Technology Course Week 6 Paul Nash HE Subject Leader (Engineering)
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
FUNDAMENTALS OF METAL FORMING
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Introduction to Manufacturing Processes Pt. 2 © 2012 Project Lead The Way, Inc.Principles Of Engineering.
FUNDAMENTALS OF METAL FORMING
HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL Peter Wanderer BNL Archamps Workshop, March 2003.
18.1 Introduction Powder metallurgy is a process by which fine powdered materials are blended, pressed into a desired shape, and then heated to bond.
LARP Collaboration Meeting Racetrack Coil Fabrication
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Modification of the 11T Dipole impregnation mould Impact on impregnation parameters Remy Gauthier,
Thomas Jefferson National Accelerator Facility Page 1 FNAL/JLab weekly meeting, April 23, 2014 Agenda  Path Forward  Status at FNAL  Status at JLab.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Manufacturing Processes & Techniques Designers need to understand a wide range of manufacturing processes and techniques to match their knowledge of materials.
Polymer Matrix Composites Matrix Resins and Composite Fabrication
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
Lessons learnt from CERN experience
Some Design Considerations and R &D of CEPCB Dipole Magnet
QXF Coil Fabrication & Tooling Reaction / Impregnation
MAGM 262 Hydraulic Seals Mr. Conrado.
TQS Structure Design and Modeling
The design schemes of the low field dipole magnets
FORGING DIE DESIGN Die Design.
Rapid Tooling.
CHEN, Fusan KANG, Wen November 5, 2017
Magnets for the ESRF upgrade phase II
Pierre-Alexandre Thonet
I. Bogdanov, S. Kozub, V. Pokrovsky, L. Shirshov,
TRENTON Casing Filler Presentation
High Precision Magnet Production for NSLSII at IHEP
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Manufacturing Technology 1 CUPE219 Lecturer details L. Chidzuu Office: E3 Contact: Metal casting process Permanent.
Fiber Reinforced Polymer Systems
Electric Machine Design Course
Presentation transcript:

BROOKHAVEN SCIENCE ASSOCIATES Manufacturing and Quality Assurance Magnet Production Workshop Frank DePaola April 11-12, 2012

BROOKHAVEN SCIENCE ASSOCIATES Abstract Manufacturing and Quality Assurance Frank DePaola, NSLS-II Project Building Quality into the Magnets necessitates that the quality requirements for the performance specifications are incorporated into the production process and methods used to produce the magnets. This is accomplished through manufacturing travelers, documented procedures, early QA involvement that takes a proactive approach for preventing defects, and the use of established best practices for manufacturing the coils and yokes. *Work performed under auspices of the United States Department of Energy, under contract DE-AC02- 98CH10886 DOE Review of the NSLS II Project, November ,

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, OUTLINE Manufacturing and Quality Assurance Interface Build Quality into the Product Manufacturing Travelers Role of Quality Assurance in Manufacturing Magnet Production Magnet Yoke Fabrication Magnet Coil Fabrication Magnet Assembly

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Build Quality Into The Product Successful manufacturers build quality into their products The quality necessary to achieve the required specification is designed and planned into the product upfront – it than becomes integrated into the manufacturing methods used to produce the product This is accomplished through the use of manufacturing travelers, documented procedures, inspection and test plans, engineered tooling and fixtures, and continuous improvement

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Manufacturing Travelers The single most important item is the manufacturing traveler Sequential listing of required tasks References special work instructions and procedures Incorporates in-process inspection and test requirements Captures individual part data (actual measurements & test results) Provides hold points that require approval prior to proceeding Historical record for each individual item produced Provides consistency from part to part throughout the production run

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Role of Quality Assurance in Manufacturing Provide a systematic and proactive approach for preventing defects Implement procedures that ensure manufactured products consistently meet the required quality specifications Incorporate the QA requirements into the manufacturing traveler Perform audits to ensure: Established procedures are being followed Personnel performing the work are adequately trained Equipment is calibrated and in good repair

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication MATERIAL Ideally all magnets from the same family are manufactured from a single batch of steel (same heat) Shuffling systematically distributes the steel properties among all the yoke segments and ensures that all the magnets in a single family have reproducible and uniform magnetic properties Sorting ensures that variations in the sheet thickness (caused by crowning during the rolling process) are systematically distributed – If the laminations are symmetrical they can be flipped during the stacking process

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Solid Steel Yokes or Steel Laminated Yokes Solid Steel Yokes Machined from a solid block of material Cannot be cycled or pulsed rapidly (eddy currents) Acceptable for use in storage ring accelerator applications Should be considered if a small number of magnets are required

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Solid Steel Yokes or Steel Laminated Yokes Laminated Steel Yokes Joining Methods – Glued / Welded / Combination of gluing and welding Gluing is generally used for magnets that are < 0.5 meter in length Longer dipole magnets are more suited to a welded construction Trying to glue dipole magnets that have a long length to yoke cross section ratio is very difficult to accomplish – and stacking curved dipole magnets adds yet another level of complexity

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Solid Steel Yokes or Steel Laminated Yokes Cost Comparison “ Typical undocumented studies have shown that the cost of fabricating a few (≤ 4) laminated magnet yokes is dominated by the tooling costs and exceeds the cost of machining the same number of yokes from solid blocks. However, these same studies have shown that the cost of machining exceeds the cost of fabricating laminated cores for the typical accelerator application where the tooling costs can be shared by the larger number of core segments.” (J. T. Tanabe) If secondary machining is required to achieve high mechanical precision the cost advantage offered by laminated yokes is lost

BROOKHAVEN SCIENCE ASSOCIATES Manufacturing Process Comparison Magnet Production Workshop – April 11-12,

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Preparing Laminations for Stacking and Bonding Unclean laminations will result in poorly bonded yokes Laminations contaminated with stamping lubricants or cutting oils and handling laminations with bare hands that can leave dirt and oily finger prints on the surface Important to handle the laminations wearing clean lint free gloves and cleaning the laminations prior to stacking using a recommended or proven cleaning method

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Preparing Laminations for Stacking and Bonding Burrs on lamination cut edges and other defects (bent or creased laminations) will result in poorly bonded yokes with low and inconsistent packing densities Indications of these defects can generally be observed on the outer surface of the yoke at the un-bonded area Incorporate a visual inspection of laminations – a deburring process – and a sorting procedure to ensure that defective laminations do not end up in the stacked yoke

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Yoke Stacking / Bonding Fixture Stacking fixtures that do not apply an evenly distributed pressure across the entire yoke and a constant pressure throughout the bonding cycle will result in poorly bonded yokes Some stacking fixtures had to be modified to incorporate the following standard practices and features A) Engineered to be sufficiently rigid so that it will not deflect or deform under the applied forces

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Yoke Stacking / Bonding Fixture B) The clamping arrangement must apply a uniform pressure across the entire yoke Provide as many clamping positions as possible Ideally located directly over the laminations or at least as close as possible to the laminations Positioned in a symmetrical arrangement

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Yoke Stacking / Bonding Fixture C) Belleville washers are used to apply a constant pressure throughout the bonding cycle D) If top and bottom yoke halves are stacked at the same time using the same fixture – Stacking the laminations in series generally has better results than stacking them side by side E) Registration surfaces must be smooth and coated with a molybdenum based lubricant to minimize frictional forces (Molykote leaves no trace of contamination)

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Yoke Bonding Optimized bonding conditions (pressure, time and temperature) are paramount in producing strongly bonded yokes Material manufacturers generally give a broad range for the bonding conditions – The optimized conditions are dependent on the actual yoke size and geometry as well as the method of heating Optimized conditions are best developed through the use of engineering analysis that take into account the following considerations

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Yoke Bonding Applied Pressure Stay within the material manufacturer’s recommended range for applied pressure if possible Pressure measurement film is an accurate and visual representation of the pressure distribution that is being applied to the yoke by the stacking fixture under actual conditions at room temperature Applied pressure should be maintained for as long as possible during the yoke cool down period

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Yoke Bonding Time and Temperature Analysis should be performed to determine the heating profile (ramp-up rate, maximum temperature, soak time, and cool-down rate) using the actual geometry and mass of both the yoke plus the stacking fixture For the most accurate readings – Thermal couples used to monitor the yoke temperature are attached as close as possible to the center of the yoke

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Yoke Fabrication Packing Density A packing density greater than 98% with less than a 0.2% variation between the top and bottom yokes is required for high precision quality magnets Magnet asymmetries caused by a variation in packing density between the top & bottom yokes can often cause disturbance to the field as a result of a displacement between the mechanical and magnetic centers

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Coil Fabrication Vacuum impregnation of the coils and the use of a potting mold was specified in order to accurately produce the coil’s final shape and close mechanical tolerance requirements for Coil installation onto the poles Providing the clearance necessary for installation of the vacuum chamber and other components Solutions to production issues that were encountered during coil fabrication are shown on the next three slides

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Coil Fabrication Coil Preparation Prior to Potting Preformed G10 reinforcement blocks are used to provide the structural support necessary to strain relieve the conductor leads as they exit the encapsulated coil assembly – The conductor and reinforcement block must be secured to the coil assembly using fiberglass tape A ground wrap of fiberglass tape is wound around the completed coil assembly securing its shape during potting

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Coil Fabrication Coil Potting Mold Coat the inside surfaces of the mold cavity with a mold releasing agent to facilitate the removal of the cured coil G10 strips are used to center the wound coil within the mold allowing the epoxy to flow uniformly around the entire coil assembly Large molds containing cavities for multiple coils to be potted simultaneously can potentially cause problems trying to fill all of the cavities in the allotted time before the epoxy starts to cure

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Coil Fabrication Coil Potting (Encapsulation) Process Vacuum impregnation of the coils In order to completely evacuate air from the mold cavity – The vacuum pump draws the mixed epoxy into the cavity from the bottom of the mold – completely fills the cavity – and exists through the top of the mold Alumina filled epoxy resin prolongs the life of the coils by providing added radiation resistance – Getting the mixture to flow uniformly through the mold cavity proved to be a challenging task for most until the exact recipe (alumina particle size, mixing time and temperature) was established

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Assembly Secondary Processing Small variations during fabrication and assembly have an adverse effect on magnet performance and repeatability. Reducing these variations to an acceptable level requires secondary processing of the magnet after bonding and assembly.

BROOKHAVEN SCIENCE ASSOCIATES Magnet Production Workshop – April 11-12, Magnet Assembly Secondary Processing To achieve the high precision quality requirements of the magnetic field and to ensure repeatable magnetic performance after disassembly and reassembly of the magnet Machine the mating registration surfaces of each yoke half and each mid-plane spacer Assemble yoke halves using a documented bolt tightening sequence and torque procedure Best magnetic field quality results are achieved when the pole profile is machined in the assembled magnet

BROOKHAVEN SCIENCE ASSOCIATES Manufacturing Process Comparison Magnet Production Workshop – April 11-12,

BROOKHAVEN SCIENCE ASSOCIATES Lessons Learned Workshop, April 11-13, Acknowledgements THANKS TO THE BNL MAGNET TEAM AND OUR INDUSTRIAL CONTRACTORS AROUND THE WORLD