Mod 0273: 1 st Development Group Workshop 4 th February 2010.

Slides:



Advertisements
Similar presentations
A business makes payments for what it buys, In return it receives payments for goods it sells or services it provides.
Advertisements

Mod 373 “Governance of NTS Connection Processes”
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
Sunday, 04 October 2015 UNC Mod Action WG0505: Provide for discussion/development the potential categories of connection offer and associated timescales.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
PARCA: Contractual Overview TX Workgroup 27 th February 2013 Steve Pownall.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0273: 3 rd Development Group Workshop 4 th March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
1 CS 501 Spring 2003 CS 501: Software Engineering Lecture 7 Business Aspects of Software Engineering.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Business Aspects of Software Engineering SWE 513.
Mod 273 – Governance of Feasibility Studies Customer Experiences Julie Cox Transmission Workstream - 4 th March 2010.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Mod 0273: Governance of Feasibility Study Requests to Support Changes to Network Exit Agreements – National Grid NTS Response.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Category Connection criteria Application for a new Minimum NTS Offtake Connection (exit) in a green-field site Application for any other category of new.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Transmission arrangements for distributed generation DCMF 9 April 2008 Pre consultation document.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Review Group -140 Thoughts on additional information requirements.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.
Sufficiently Complex Connection Involving Pipeline Construction and/or System Reinforcement Project Sequence.
Industry Dialogue on xoserve Services 14 th September 2007.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
Network Services: RM1045 Procurement Process
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
Accelerating Renewable Connections Stakeholder Workshop Scotsman Hotel, Edinburgh 26 th June 2014 Presented by Euan Norris Senior Project Manager, Future.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Food Suppliers Implementation of EDI &PAV March 2010
User Pays User Committee 12th November 2013
After the FCC Form 471 E-rate Program Applicant Training
Exit Capacity User Commitment – Transmission Workstream update
Example Feasibility Study Matrix
Transmission Planning Code
UNC Modification Proposal 0373
Richard Fairholme, E.ON UK
Assignment Workshop 2 16th September 09, Solihull.
Key Value Indicators (KVIs)
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Long Term Non Firm Capacity Update
Proposed Transitional Gas Exit Arrangements
Open Letter - Summary of Responses
Presentation transcript:

Mod 0273: 1 st Development Group Workshop 4 th February 2010

NG NTS Initial Views (December 2009)  Are comparisons to the electricity model appropriate?  The 3 month Connection and Use of System Code (CUSC) Modification Application process employed in electricity does not include a feasibility study  Feasibility Study fees are not published in electricity  The gas process needs to be fully understood  In comparison to electricity, the number of new connections and Network Exit Agreement (NExA) changes are relatively few  Receiving a number of enquiries in a relatively short period can cause workload planning difficulties  The timescales in gas vary considerably depending on the complexity of the customer requirements/installation  Feasibility Studies are important as they are undertaken to meet legislative obligations

Electricity Connections / Modifications Connection & Use of System Code (CUSC) Process

Electricity New Connections & Modifications - CUSC Process  The CUSC process offers a 3 stage connection process;  Feasibility Study (If required)  Connection Offer and Acceptance  Physical Connection / Modification Feasibility Study Formal application & Payment cleared Clock Start Sanction Offer Made Connection OfferAcceptance (Optional) 3 Months 6 Months+ Works

Electricity New Connections & Modifications - CUSC Process (Cont.) – Feasibility Study  Typically undertaken to help determine the best location for a new connection (e.g. Power Station)  Rarely used (1-2 p.a.) as information quickly becomes out of date and timescales are longer than for formal application process  Unregulated service - all costs are recovered, no delivery SLA  National Grid Daily rates are published but costs of studies may also include contractor costs. The number of hours involved is also not known until the scope is agreed.

Electricity New Connections & Modifications - CUSC Process (Cont.) – Design Stage (1)  Formal 3 month process covering New Connections or Modifications to existing contracts  National Grid offers to hold one pre-application meeting  Associated documentation is extensive  ‘Clock starts’ only when all documentation is received/approved & funds have been paid  Modelling analysis work is predominantly conducted “in house” by 40+ engineers  NGET receive a considerable number of applications p.a.  New connections: 40%  Modifications: 60%

Electricity New Connections & Modifications - CUSC Process (Cont.) – Design Stage (2)  Fees (fixed & indicative) published for New Connections & Modifications – average £100k, capped at £400K  Offer includes commencement date (fixed) and list of works (can be amended at a later date)  Offer for new connections & modifications made within 3 months  NG can request an extension to the 3 month timescale but this is rarely used  Acceptance;  User has 3 months to accept and only minor changes to contract are allowed  Major changes = new application

Gas Connections / Modifications NTS Exit Points with Network Exit Arrangements (NExAs)

New Connections & NExA Modification Process (1)  Offering Customers a connection to the NTS or a modification to their existing NExA is a license obligation (LC4B)  New connection & modification processes are undertaken in line with the Statement & Methodology for Connection Charging.  Available via link: 4E F19514F23EC4/35303/SC4BApril2009v30.pdf 4E F19514F23EC4/35303/SC4BApril2009v30.pdf  Statement also includes worked examples of connections with indicative costs:  Conceptual design study for new connection - approx. £30k to £50k  Feasibility study to assess impact of adding a new connection…- up to approx. £150k  Feasibility study for System Extension pipeline (Exit only) - approx. £100k to £400k, depending on pipeline length and route  Users/developers must commit to payment of the cost estimate prior to commencement of the study

Acceptance Feasibility Study New Connections & NExA Modification Process (2)  A 3 phase approach is also offered for new exit connections;  Customer Engagement & Feasibility Study (If required)  Design studies  Conceptual  Detailed  Siteworks  Indicative Conceptual design study timescales are provided (on the web) – weeks but it is also explained that it “would be longer for complex projects”  Work is often staged to enable a customer to understand project feasibility, costs and timescales without committing to full costs at the outset Offer Made Conceptual Design (Optional) 6 months 3 Months3-6 months Siteworks Months Detailed Design 6 months

New Connections & NExA Modification Process (3)  Modifications include physically moving the exit connection and amending ramp rates/operating pressures  A Feasibility Study maybe required prior to conceptual design and/or construction  For Modifications the scope of a Feasibility Study is ‘flexible’ and tailored to suit the customers requirements but also varies depending on:  the complexity of the project  the size of the installation  Once scope is agreed, the timescales and costs of the (bespoke) Feasibility Study are agreed with the customer upfront (contract)  A Feasibility Study may include;  An Impact Analysis of onsite components & wider network issues  An evaluation of options and any additional analysis as specified / agreed with customer  Indicative timescales & costs for Design & Sitework phases  Further detail to follow

Why is it important we conduct analysis within a feasibility study?  Rapid load changes during start up and shutdown could affect the efficient and effective operation of the pipeline system  Trigger safety devices and cut off supply at the installation  Cause damage to National Grid equipment at installations such as pressure regulators, filters and orifice plate meters  Adversely affect other Users of the system (entry and exit points) in the vicinity  Legislation  Health and Safety at Work Act etc  Pressure Systems Safety Regulations (PSSR) 2000  Pipeline Safety Regulations (PSR) 1996  Further detail to follow

Typical timescales and costs  Important to remember that there is no such thing as a ‘typical’ project!  Further detail and case studies to follow CharacteristicTimescaleCost Simple changes/minimum connections3-6 months£10k to £50K Semi complex changes/medium size connections6-9 months£50K+ Complex changes/large connections9-12 months£100K+

What is involved in conducting a study?  Further detail to follow

Further detail  National Grid NTS propose that an Network Design expert should cover certain aspects of the process in detail at March session

Problems with current arrangements – NTS perspective  Timing  Indicative timescales are provided, however  Complexity of exit connections/modifications and associated differences in scope make it difficult to define exact timescales upfront  Costs  Indicative costs are provided, however again  Complexity of exit connections/modifications and associated differences in scope make it difficult to define exact costs upfront

Problems with current arrangements – NTS perspective  Communication  No visibility of upcoming work (types, number, nature and frequency) - r eceiving a number of enquiries in a relatively short period can cause workload planning difficulties  Process  Some enquiries are speculative in nature  Scope creep is sometimes a problem  Customers don’t always know what they want!  Customers often experience difficulties in providing the information requested, especially if it needs to be provided by their equipment suppliers  Difficulties in agreeing Contractual terms (between Customer and NG)