Selection Scoring Methodology Presented by August 23, 2007.

Slides:



Advertisements
Similar presentations
Flight Plan To The Future Ad Hoc Committee P3 Report Overview April 8, 2013.
Advertisements

St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, :00 PM.
1 Bid Evaluation - Goods Objective Secure goods/services at most economical cost Price only one factor Other optional factors Time of delivery/completion.
Research and Innovation Research and Innovation Brussels, 12 November 2013 Types of Action Focus on Innovation Actions and the SME Instrument.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
National Park Service U.S. Department of the Interior Receiving & Evaluating Offers.
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
Contents Introduction General Description of Tender Process Threshold Requirements Submission of Bids Evaluation Award Post-Award Actions Principles of.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Selection of Consultancy Services
Public Private Partnerships P3s What the Public Sector Considers When Selecting the Right Private Partner Jose A. Galan - Division Director Miami-Dade.
Syed Zaidi, P.Eng. PM (Stanford), PhD. Director, Strategic Partnerships Alberta Infrastructure. Government of Alberta Canada Richard. B. (Dick) Innes,
Software Development Contracts and Legal Issues Cost plus Fixed price Combined.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Chapter 5 Initiating and Planning Systems Development Projects
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Part 4 PowerPoint Presentation by Charlie Cook Copyright © 2003 South-Western College Publishing. All rights reserved. All rights reserved. Finding Sources.
Public Private Partnerships Virginia Concrete Conference March, 2011 Public Private Partnerships Dan Dawood, P.E. (PA)
Mid-City Exposition Light Rail Transit Project Closed Session Presentation March 2, 2006 Exposition Metro Line Construction Authority.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
Americas Interchange Proposal Evaluation Board of Directors Presentation February 26, 2010.
Ohio River Bridges Project
FGFOA STANDING COMMITTEES Established and Evaluated by the FGFOA Board of Directors to Utilize talent and resources of the FGFOA Membership.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
Overview of PPI’s in Georgia April 26, 2006 Earl Mahfuz, Treasurer.
E-Rate Training for TASBO Members October 8, 2008 Presented by Susan Sullivan Director of Technology/Media.
Revenue-Based Development Incentives Property Tax Revenues Bob Rychlicki Kane, McKenna and Associates, Inc.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Inter-American Development Bank Private Sector Financing and the IDB Presentation by the IDB Private Sector Department February 2004.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
TIFIA Credit Program Overview Updated October 2012 T ransportation I nfrastructure F inance and I nnovation A ct (TIFIA)
TIFIA Credit Program Overview Updated May 2011 T ransportation I nfrastructure F inance and I nnovation A ct (TIFIA)
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
1 Evaluation of the quality By committee of 3 or more specialists  Specific experience of firms ( points) Relevant assignment, similar size, complexity,
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Angelo Vian President of FEPAC Washington, D.C., U.S.A. – May 10-11, 2007 Biennial Meeting International Lending Agencies and Consulting Industry – BIMILACI.
North Metro Rail Line Design/Build Contractor Staff Recommendation FasTracks Monitoring Committee November 5, 2013.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
2017/18 SIP Request Process September 2016.
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
Well Trained International
Light Rail Transit Project
Scoring the Technical Evaluation Maximum possible score
CIFA 2016 Workshop Performance Based Infrastructure
Evaluation Grids Evaluation Grids.
Request for Proposal - Best Value
Finance and Risk Public-Private Partnerships
Request for Proposal - Best Value
PROJECT DELIVERY METHODS
Audit RFP Evaluation Process
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
GREAT HALL INITIATIVE.
Provision of HR Services, UNOPS Nepal
Presentation transcript:

Selection Scoring Methodology Presented by August 23, 2007

Organizational Structure ■DOT appoints multidisciplinary team to review proposals –Evaluation and Selection Recommendation Committee (ESRC) –Selection Advisory Committee (SAC) –Three Technical Subcommittees ■Technical Subcommittees –Legal/Administrative Subcommittee –Development Plan Evaluation Subcommittee (DPES) –Financial Proposal Evaluation Subcommittee (FPES)

Proposal Review & Evaluation

Development Plan & Financial Plan ■Project Development Plan consists of: –Project Management Plan –Quality Management Plan –Technical Approach ■Financial Plan consists of: –Financial Letters –Financial Strategy –Financial Model –Cost and Pricing Data

Pass/Fail & Responsiveness Evaluation ■Technical proposals to be evaluated based on following pass/fail criteria: –Business form of the proposer and team members –DBE certification –Proposer information, certifications and signed statements –Proposal security –Commitment dates –Required portions of the Technical Proposal

Financial Proposals–Evaluation Pass/Fail ■Proposer’s financial condition/capabilities –Current financial strength –Credit quality –Current/pending claims, litigation or equivalent ■Sufficient financing –Overall feasibility of proposed Financial Proposal –Robustness of results –Terms/and conditions of the financing –Guarantees and other security –Level of commitment of major participants with direct equity interest –Level of commitment demonstrated by potential lenders –Likelihood of reaching financial close by deadline

Financial Proposals–Evaluation Pass/Fail, cont. ■Lender support letters ■Assurance that private equity will be in place ■Toll rate setting framework ■Ratio of net present value of Annual Lease Payment to the Upfront Concession Payment

Evaluation of Project Development Plan & Schedule ■Project Development Plan evaluation factors –Project management approach (all of equal importance) General project management and key personnel Mentoring/training Design and construction management Operations management Public information/communications Risk management Maintenance management Schedule, cost control and quantity estimating Environmental management

Technical Proposals ■Technical Solutions –Most important Tolling and intelligent transportation systems Routine, preventative and reactive maintenance Road operations –2nd most important Schedule, construction sequencing, and traffic management Roadway and drainage Bridges and structures –Least important Aesthetic design concepts Programmed major maintenance, renewals, and capital works Connectivity

Quality Management ■Quality Management Approach (of equal importance) –Design and construction quality –Operations and maintenance quality

Financial Proposal Evaluation ■Determined using the Net Present Value (NPV) of the offer ■5% discount rate ■NPV of upfront lump sum payment amount plus net present value of the sum of the guaranteed constant Annual Lease Payment amounts

Adjectival Ratings

Adjectival to Numerical

Best Value Determination–SH121 (DBFO) ■Based on point scale –Price 80 points max, technical 10 points max, schedule 10 points max (Total possible points = 100) ■Total proposal score = price score + technical score + schedule score –Price score = (Proposer’s NPV ÷ best proposal NPV) x 80 –Technical score = ESRC evaluation score (100 points max) x 0.10 –Schedule score = (Total days saved ÷ maximum days saved) x 10

■Basis of final total proposal score (FTPS) was established in the RFP ■PPV – Price Proposal Value 15% Technical Component Ranked against highest technical score from any Proposer 85% Price Component Ranked against lowest PPV from any Proposer Technical Score Low PPV High Tech. Score PPV FTPS = Best Value Determination–SH130 Design Build

Best Value Determination – TTC-35 (Strategic Partner)

Best Value Determination – TTC-35

OIPP – Oregon Innovative Partnership Program ■The qualifications and experience of the proposers ■Their approach to and understanding of the project ■Their plans for gaining public support of the proposal, and ■Proposed compensation arrangements

OTC (Actions Oct. 19, 2005) Director (Completed Oct. 3, 2005) ODOT Evaluation Team (Completed Sep. 30, 2005) Innovative Partnerships Manager (Chair) Deputy Director – Highway Technical Services Branch Manager Region One Manager Region Two Manager ODOT Technical Review Team (Completed Sep. 12, 2005) Environmental Financial Engineering Project Development OIPP Proposals (Received Aug. 29, 2005) Interviews (Completed Sep. 28, 2005) Local Consultations (Completed Sep. 16, 2005) Consultant Technical Reports (Completed Sep. 21, 2005) References (Completed Sep. 29, 2005) Proposals Review & Evaluation Process for OIPP RFP

OIPP ■The eligible Adjective Ratings ranged from Excellent to Poor ■Individual members of the TRT prepared their scores ■Joint meeting was held where a consensus score was developed for each criteria

Summary ■Development Plan and Financial Plan are separate reviews ■Each subcommittee reaches consensus ■Evaluation Selection Team combines the scores and selects the best value ■Best Value Formulas – Typically not based on Low Bid –Need to decide on the spilt between price and technical

Are There Any...  Questions  Comments  Concerns