1 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES Rocky Mountain Steel Construction Association Structural Engineers Association of Colorado Structural Engineers.

Slides:



Advertisements
Similar presentations
Benefits of Construction Management
Advertisements

Construction Project Coordination Presented by: Philip H
East Hampton High School July 2013 – July 2014 Design Phases.
Structural Steel Construction
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP
PRESENTATION ON TURNKEY CONSTRUCTION.
Special Inspections
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
ACI “Standard Specifications for Tolerances for Concrete Construction and Materials” gives (2) tolerances for suspended slabs on metal deck: Thickness.
Conditions of the Contract for Construction
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
ESTIMATING By Laith Jacob.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
The Australian Owner Builders Planning Kit. What is the Australian Owner Builders Planning Kit?  The planning kit is an essential tool for people looking.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Design & Layout of Foodservice Facilities
Construction Contract Documents
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Appendices Subpart R Steel Erection
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
Reading Structural Drawings
Owner Has Idea and Conducts Feasibility Study GoNo Go End of Project Pursue A/E Hire A/E to Design Project Scope of Work Defined Contract Negotiated Go.
TECHNOLGICAL DESIGN Architectura l Design Process.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
Contract Training Class I
Palomar West Medical Center Segmental Review Brett W. Beekman, S.E. Senior Structural Engineer, Southern California.
Fundamentals of Structural Detailing
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
You passed the Bond or secured some funds What do we do now? 2014.
Milestone Meeting Milestone Meeting Client Activity / Task Client Activity / Task Design For Health Activity / Task Design For Health Activity / Task Document.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Structural Steel Connection Design between the Structural Consultant & the Steel Fabricator Dr. Magdi A. Khalifa Abu Dhabi - United Arab Emirates.
Palomar Medical Center West: Segmented Review Process.
1 DESIGN RESPONSIBILITIES Contract Information Supplied by Design Team Responsibility of the Precaster Option I Provide complete drawings and specifications.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Construction Management At Risk Process
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Steel Fabrication & Erection of Belle Chase Primary School Proposal – Fall 2015 ET 494 – Senior Design II Derek Duhon Instructor: Dr. Koutsougeras Advisor:
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Introduction to Building Trades Denver High School.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
1 Punch list / Close Out - Project Completion Best Practices May 2016.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
Structural drawing.
SC Railing Company Overview
Temporary Works Co-ordination
Wood Structures Topic 8 Quality Workmanship
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
The project's conception: A feasibility study is done
Structural Drawing Chapter 19.
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
FIVE PROJECT PHASES.
Construction Management Services April 16, 2018
Architecture & Interiors Design Process
Presentation transcript:

1 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES Rocky Mountain Steel Construction Association Structural Engineers Association of Colorado Structural Engineers Association of Colorado Steel Liaison Committee

2 Past products from SEAC and RMSCA 1.AESS Guidelines – Prepared to assist in defining finishing and cost issues associated with AESS Steel 2.Input for the 2005 AISC Code of Standard Practice 3.Checklist for Structural Design Drawings 4.Pre-Detailing Meeting Agenda/Checklist 5.Current project: Improving the Shop Drawing Process

3 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES ENGINEERING TOLERANCE CONSTRUCTABILITY

4 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES consulting structural engineer = EOR architect = AOR

5 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES EOR’s primary role(s) design team member assist the AOR with issues that involve engineering prime design team contact to the structural steel detailer insures the completed structure is safe and performs as expected

6 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES information gathering AOR to determine skin type AOR to coordinate application with the EOR EOR to insure structural adequacy at exterior wall interface EOR to define connection between exterior wall and structural frame

7 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES what is the goal?  produce clear information on the design documents  assure all parties know who is responsible for what aspect of the design  meet with fabricators, erectors and exterior wall suppliers  insure that the GC understands the desired final expectations

8 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES illustrate the eccentricities for which the steel frame is designed and/or the eccentricities for which the exterior wall must be designed

9 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES keeping the column line pushed out as far as possible could result in cost savings to the owner

10 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES check points if possible, move the column line outward understand the exterior wall system and the desired interface with the structural frame meet with fabricators, erectors and exterior wall suppliers understand the tolerances involved with the project

11 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

12 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

13 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES 3 : the allowable deviation from a standard; especially : the range of variation permitted in maintaining a specified dimension

14 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES the range of variation permitted in maintaining a specified dimension 3 : the allowable deviation from a standard; especially :

15 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES the range of variation permitted in maintaining a specified dimension

16 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

17 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

18 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES design team may not know WHO

19 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES owner retains consultants contract documents progress general contractor is retained steel and exterior wall subs are secured

20 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES design team issues DD contract documents general contractor releases DD docs for bid design team issues CD’s general contractor has steel sub under contract design team issues 100% CD’s general contractor releases steel sub to proceed with detailing

21 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

22 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES general contractor detailing approval steel sub starts project begins steel to be purchased steel frame critical path

23 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES steel frame critical path ? ?

24 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES submittal schedule approval dwgs shop dwgs Sub’s RFI’s erection sched coordination of design must happen of

25 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES clear intent predictable

26 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES leveling the playing field preparation

27 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES section 6.4 “fabrication tolerance”

28 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES steel tolerance sweep roll camber

29 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES section 7.5 “installation of anchor rods foundation bolts and other embedded items”

30 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES section 7.12 “structural steel frame tolerance”

31 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES section 7.13 “erection tolerances”

32 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

33 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES section shall “in the design of steel structures, the owners designated representative for design shall provide for the necessary clearance and adjustments for material furnished by other trades to accommodate the mill tolerance, fabrication tolerances and erection tolerance as accepted in this Code for the Structural Steel frame.”

34 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES responsibility

35 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES suggested details dimensions and usage of tolerances

36 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES section 7.5 installation of anchor rods, foundation bolts and other embedded items -associated AISC tolerances- section 6.4 fabrication tolerance section 7.13 erection tolerances section 7.12 structural steel frame tolerances

37 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

38 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES 2005 AISC code of standard practice -section “the accumulation of the mill tolerance and the fabrication tolerances shall not cause the erection tolerance to be exceeded”

39 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES 2005 AISC code of standard practice -section “erection tolerances shall be defined relative to the member working points and working lines”

40 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

41 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES the more understanding the design team has of the interface of the structural frame to the exterior wall system, tolerance will become a useful tool and not a problem for the construction team

42 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

43 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

44 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

45 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

46 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES has or das will need to be field installed appropriate flange width fewer restrictions at the roof

47 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES project success

48 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES good communications heroes are rewarded if proper attention is given review and understand structural framing system to control cost select edge materials that will perform with the exterior wall system

49 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES edge materials that account for tolerance variations clearly show all necessary offset dimensions on the design documents use the AISC code of standard practice, ASTM and experiences of the construction team

50 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES ENGINEERING TOLERANCE CONSTRUCTABILITY

51 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES ENGINEERING TOLERANCE CONSTRUCTABILITY

52 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES CONSTRUCTABILITY brief history of project evolution EOR drawing process recommendations

53 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

54 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

55 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

56 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION PRIOR TO 1950’S 1. ARCHITECT – MASTER BUILDER 2. DRAWINGS – DRAWN IN INK ON LINEN & VERY DETAILED 3. STRUCTURE INCLUDED IN ARCHITECTURAL DRAWINGS 4. BUILDING SHAPES – RECTANGULAR, 1-3 STORIES

57 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION PRIOR TO 1950’S 7. GC’S SELF PERFORMED ALL OF THE WORK 5. EXTERIOR MATERIALS – LIMITED TO STONE, MASONRY, AND PUNCHED WOOD WINDOWS 6. FLOOR AND ROOF SYSTEMS – WOOD OR CONCRETE

58 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION 1950’S – 1960’S 1. STRUCTURAL SYSTEMS EXPANDED TO INCLUDE STRUCTURAL STEEL, STEEL JOISTS AND PRECAST CONCRETE 2. STRUCTURAL DRAWINGS BECAME SEPARATE DOCUMENTS 3. STRUCTURE INCLUDED IN ARCHITECTURAL DRAWINGS 4. BUILDING SHAPES – RETANGULAR, 1-3 STORIES

59 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION 1950’S – 1960’S 3. GC’S STARTED BROKERING WORK OUT TO SUBCONTRACTORS 4. STEEL SHOP DRAWING PREPARATION BY IN- HOUSE ENGINEERS 3. STRUCTURE INCLUDED IN ARCHITECTURAL DRAWINGS 4. BUILDING SHAPES – RETANGULAR, 1-3 STORIES

60 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION 1970’S 1. BEGINNING OF MORE COMPLEX EXTERIOR WALL SYSTEMS 2. DRAWINGS PREPARED ON MYLAR AND PIN- BAR SYSTEM 3. COMBINATION OF STRUCTURAL AND EXTERIOR WALL SYSTEMS INCREASED 4. BUILDING SHAPES – RETANGULAR, 1-3 STORIES

61 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION 1980’S 1. ADVENT OF CAD 2. BUILDING COMPLEXITY SKYROCKETS 3. MORE EXTERIOR WALL SYSTEM CHOICES 4. BUILDING SHAPES – RETANGULAR, 1-3 STORIES

62 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION 1980’S 4. GC LOYALTY TO SUBCONTRACTORS STARTS TO DIMINISH 5. EOR SELECTION SHIFTS FROM QUALIFICATION TO FEE BASIS 6. STEEL SUBCONTRACTORS START CUTBACK OF SHOP DRAWING STAFF AND BEGIN TO OUTSOURCE 4. BUILDING SHAPES – RETANGULAR, 1-3 STORIES

63 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION 1990’S 1. BUILDING SHAPES AND EXTERIOR SKINS FURTHER EVOLVE INTO UNTESTED CONSTRUCTION 2. EOR & SUBCONTRACTOR SELECTION BASED ON LOW DOLLARS 3. “GIVE & TAKE” ATMOSPHERE OF CONSTRUCTION BEGINS TO ERODE 4. BUILDING SHAPES – RETANGULAR, 1-3 STORIES

64 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION 1990’S 4. GC LOYALTY TO SUBCONTRACTORS IS RARELY SEEN 5. COMPETITION FOR LOWER COST FORCES LESSER QUALITY DOCUMENTS 6. TECHNOLOGY EXPLOSION LEAVES EXPERIENCE ON THE SIDELINE 4. BUILDING SHAPES – RETANGULAR, 1-3 STORIES

65 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION 1990’S 7. COORDINATION OF DOCUMENTS WITH OTHER TRADES WANES 8. STEEL SUBCONTRACTORS OUTSOURCE MAJORITY OF SHOP DRAWING PREPARATION 4. BUILDING SHAPES – RETANGULAR, 1-3 STORIES

66 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION 2000’S 1. SUBCONTRACTOR COMPETITION IS INTENSE, SO REPEAT WORK IS DIFFICULT TO OBTAIN 2. TIGHT MARGINS FORCE LESS “GIVE & TAKE” 3. SHOP DRAWINGS ARE DIFFICULT TO PREPARE 4. BUILDING SHAPES – RETANGULAR, 1-3 STORIES

67 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION 2000’S 4. LOWER CONSULTANT FEES AND TIGHT SCHEDULES RESULT IN LESS COMPLETE DOCUMENTS 5. GC REACTION – CM, NEGOTIATE IN ORDER TO HELP CONTROL DESIGN & COST 6. ARCHITECTURAL EXPERIENCE LEVEL IN PREPARING DOCUMENTS DROPS 4. BUILDING SHAPES – RETANGULAR, 1-3 STORIES

68 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES BRIEF HISTORY OF PROJECT EVOLUTION 2000’S 7. TIMELY, BUILDABLE INPUT FROM ARCHITECT TO SER DROPS OFF RESULTING IN INCOMPLETE COORDINATION OF DRAWINGS 8. MIX OF EXTERIOR WALL SYSTEMS INCREASES 9. EFFECTIVE COMMUNICATION TRADED FOR 4. BUILDING SHAPES – RETANGULAR, 1-3 STORIES

69 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

70 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES EOR DRAWING PROCESS 1. SCHEMATIC DRAWINGS PROVIDED BY ARCHITECT TO EOR 2. EOR FRAMES BUILDING 3. TYPICAL EDGE CONDITIONS ARE DEVELOPED BY EOR BASED ON IDEAS BY ARCHITECT 4. AS ARCHITECTURAL DRAWINGS DEVELOP, EOR ADJUSTS STRUCTURAL DOCUMENTS

71 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES RECOMMENDATIONS 1. EOR MUST ASSIST ARCHITECT WITH CONSTRUCTABILITY ISSUES AS DOCUMENTS ARE DEVELOPED 2. EOR SHOULD SEEK CONSTRUCTABILITY INPUT FROM AFFECTED TRADES AS DOCUMENTS ARE PREPARED 3. FABRICATOR SHOULD IDENTIFY CONSTRUCTABILITY ISSUES UPFRONT 4. AS ARCHITECTURAL DRAWINGS DEVELOP, SER ADJUSTS STRUCTURAL DOCUMENTS 4. THE GC MUST COORDINATE CONSTRUCTABILITY ISSUES BETWEEN TRADES

72 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

73 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

74 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

75 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES RECOMMENDATIONS 1. EOR MUST ASSIST ARCHITECT WITH CONSTRUCTABILITY ISSUES AS DOCUMENTS ARE DEVELOPED 2. EOR SHOULD SEEK CONSTRUCTABILITY INPUT FROM AFFECTED TRADES AS DOCUMENTS ARE PREPARED 3. FABRICATOR SHOULD IDENTIFY CONSTRUCTABILITY ISSUES UPFRONT 4. AS ARCHITECTURAL DRAWINGS DEVELOP, SER ADJUSTS STRUCTURAL DOCUMENTS 4. THE GC MUST COORDINATE CONSTRUCTABILITY ISSUES BETWEEN TRADES

76 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES RECOMMENDATIONS 5. FABRICATOR MUST PARTICIPATE IN COORDINATION OF AFFECTED TRADES 6. EOR & ARCHITECT NEED TO ACCOMMODATE CONSTRUCABILITY ISSUES THAT ARISE DURING CONSTRUCTION 7. TIMELY PRE-CONSTRUCTION MEETINGS ARE ESSENTIAL 8. CONSULTANTS MUST GET FIELD EXPERIENCE

77 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

78 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

79 ENGINEERING TOLLERANCE CONSTRUCTABILITY STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

80 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

81 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES

82 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES ENGINEERING TOLLERANCE CONSTRUCTABILITY

83 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES ENGINEERING TOLERANCE CONSTRUCTABILITY

84 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES