1 Supply Chain Management: Issues and Models Inventory Management (stochastic model) Prof. Dr. Jinxing Xie Department of Mathematical Sciences Tsinghua.

Slides:



Advertisements
Similar presentations
Independent Demand Inventory Systems
Advertisements

Statistical Inventory control models I
Inventory Control Models
ISEN 315 Spring 2011 Dr. Gary Gaukler. Lot Size Reorder Point Systems Assumptions –Inventory levels are reviewed continuously (the level of on-hand inventory.
Chapter 5 Inventory Control Subject to Uncertain Demand
Chapter 13: Learning Objectives
Managing Facilitating Goods
6 | 1 Copyright © Cengage Learning. All rights reserved. Independent Demand Inventory Materials Management OPS 370.
Stochastic Inventory Modeling
Q. 9 – 3 D G A C E Start Finish B F.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
1 Chapter 15 Inventory Control  Inventory System Defined  Inventory Costs  Independent vs. Dependent Demand  Basic Fixed-Order Quantity Models  Basic.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Inventory Control – IV Multiperiod Probabilistic Demand:
Inventory Control IME 451, Lecture 3.
12 Inventory Management.
Chapter 11, Part A Inventory Models: Deterministic Demand
Stochastic Modeling & Simulation Lecture 17 : Probabilistic Inventory Models part 2.
1 Inventory Models. 2 Overview of Inventory Issues Proper control of inventory is crucial to the success of an enterprise. Typical inventory problems.
Supply Chain Management (SCM) Inventory management
Production and Operation Managements
HW #7 ANSWER
© 2015 McGraw-Hill Education. All rights reserved. Chapter 18 Inventory Theory.
EMGT 501 HW #3 Solutions Chapter 10 - SELF TEST 7
Statistical Inventory control models II
ISEN 315 Spring 2011 Dr. Gary Gaukler. Demand Uncertainty How do we come up with our random variable of demand? Recall naïve method:
1 Managing Flow Variability: Safety Inventory The Newsvendor ProblemArdavan Asef-Vaziri, Oct 2011 Marginal Profit: Marginal Cost: MP = p – c MC = c - v.
Inventory Models Uncertain Demand: The Newsvendor Model.
1 ANALYSIS OF INVENTORY MODEL Notes 2 of 2 By: Prof. Y.P. Chiu 2011 / 09 / 01.
1 Managing Flow Variability: Safety Inventory The Newsvendor ProblemArdavan Asef-Vaziri, Oct 2011 The Magnitude of Shortages (Out of Stock)
Analysis of Supply Contracts with Total Minimum Commitment Yehuda Bassok and Ravi Anupindi presented by Zeynep YILDIZ.
Chapter 5 Inventory Control Subject to Uncertain Demand
INDR 343 Problem Session
Chapter 12 – Independent Demand Inventory Management
Inventory Management for Independent Demand
Chapter 12: Inventory Control Models
Stochastic Inventory Theory Professor Stephen R. Lawrence Leeds School of Business University of Colorado Boulder, CO
Lot Sizing. Inventory Types of inventory Types of inventory –Raw materials/purchase parts –Work-in-process –Finished goods Holding of inventory is expensive.
Graduate Program in Business Information Systems Inventory Decisions with Certain Factors Aslı Sencer.
Operations Management
Chapter 12 Inventory Models
Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted by Gerard.
ECES 741: Stochastic Decision & Control Processes – Chapter 1: The DP Algorithm 1 Chapter 1: The DP Algorithm To do:  sequential decision-making  state.
Independent Demand Inventory Management
CHAPTER 12 Inventory Control.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Inventory Management.
Slides 2 Inventory Management
Managing Inventory Why do we have inventory?
5-1 ISE 315 – Production Planning, Design and Control Chapter 5 – Inventory Control Subject to Unknown Demand McGraw-Hill/Irwin Copyright © 2005 by The.
1 Inventory Control with Stochastic Demand. 2  Week 1Introduction to Production Planning and Inventory Control  Week 2Inventory Control – Deterministic.
1 Slides used in class may be different from slides in student pack Chapter 17 Inventory Control  Inventory System Defined  Inventory Costs  Independent.
Economic Order Quantity The economic order quantity (EOQ) is the fixed order quantity (Q) that minimizes the total annual costs of placing orders and holding.
Inventory Management MD707 Operations Management Professor Joy Field.
Independent Demand Inventory Planning CHAPTER FOURTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Managing Uncertainty in Supply Chain: Safety Inventory Spring, 2014 Supply Chain Management: Strategy, Planning, and Operation Chapter 11 Byung-Hyun Ha.
CHAPTER 5 Inventory Control Subject to Uncertain Demand McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Chapter 6 –Inventory Management Policies Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
© Wallace J. Hopp, Mark L. Spearman, 1996, EOQ Assumptions 1. Instantaneous production. 2. Immediate delivery. 3.
1 Managing Flow Variability: Safety Inventory Operations Management Session 23: Newsvendor Model.
Introduction to Basic Inventory Control Theory
© The McGraw-Hill Companies, Inc., Chapter 14 Inventory Control.
MBA 8452 Systems and Operations Management
Operations Fall 2015 Bruce Duggan Providence University College.
Chapter 17 Inventory Control
Inventory Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Historical Distribution
NATCOR Stochastic Modelling Course Inventory Control – Part 2
Optimal Level of Product Availability Chapter 13 of Chopra
Slides by John Loucks St. Edward’s University.
Presentation transcript:

1 Supply Chain Management: Issues and Models Inventory Management (stochastic model) Prof. Dr. Jinxing Xie Department of Mathematical Sciences Tsinghua University, Beijing , China math.tsinghua.edu.cn Voice: (86-10) Fax: (86-10) Office: Rm. 1308, New Science Building

2 Inventory Control with Uncertain Demand The demand can be decomposed into two parts, where = Deterministic component of demand and = Random component of demand.

3 Inventory Control with Uncertain Demand  There are a number of circumstances under which it would be appropriate to treat as being deterministic even though is not zero. Some of these are:  When the variance of the random component, is small relative to the magnitude of.  When the predictable variation is more important than the random variation.  When the problem structure is too complex to include an explicit representation of randomness in the model.

4 Inventory Control with Uncertain Demand However, for many items, the random component of the demand is too significant to ignore. As long as the expected demand per unit time is relatively constant and the problem structure not too complex, explicit treatment of demand uncertainty is desirable.

5 Inventory Control with Uncertain Demand Example: A newsstand purchases a number of copies of The Computer Journal (weekly). The observed demands during each of the last 52 weeks were:

6 Inventory Control with Uncertain Demand Example :

7 Inventory Control with Uncertain Demand Example : Estimate the probability that the number of copies of the Journal sold in any week. The probability that demand is 10 is estimated to be 2/52 = , and the probability that the demand is 15 is 5/52 = Cumulative probabilities can also be estimated in a similar way. The probability that there are nine or fewer copies of the Journal sold in any week is ( ) / 52 = 19 / 52 =

8 Inventory Control with Uncertain Demand We generally approximate the demand history using a continuous distribution. By far, the most popular distribution for inventory applications is the normal. A normal distribution is determined by two parameters: the mean and the variance

9 Inventory Control with Uncertain Demand These can be estimated from a history of demand by the sample mean and the sample variance.

10 Inventory Control with Uncertain Demand The normal density function is given by the formula We substitute as the estimator for and as the estimator for.

11 Inventory Control with Uncertain Demand

12 Optimization Criterion In general, optimization in production problems means finding a control rule that achieves minimum cost. However, when demand is random, the cost incurred is itself random, and it is no longer obvious what the optimization criterion should be. Virtually almost all of the stochastic optimization techniques applied to inventory control assume that the goal is to minimize expected costs.

13 The Newsboy (girl) / newsvendor Model (Continuous Demands) The demand is approximately normally distributed with mean and standard deviation Each copy is purchased for 25 cents and sold for 75 cents, and he is paid 10 cents for each unsold copy by his supplier. One obvious solution is approximately 12 copies. Suppose Mac purchases a copy that he doesn't sell. His out-of-pocket expense is 25 cents  10 cents = 15 cents. Suppose on the other hand, he is unable to meet the demand of a customer. In that case, he loses 75 cents  25 cents = 50 cents profit.

14 The Newsboy Model (Continuous Demands) Notation: = Cost per unit of positive inventory remaining at the end of the period (known as the overage cost). = Cost per unit of unsatisfied demand. This can be thought of as a cost per unit of negative ending inventory (known as the underage cost). The demand is a continuous nonnegative random variable with density function and cumulative distribution function. The decision variable is the number of units to be purchased at the beginning of the period.

15 The Newsboy Model (Continuous Demands) The cost function G(Q) is convex The optimal solution equation

16 The Newsboy Model (Continuous Demands) Determining the optimal policy for convex function

17 The Newsboy Model (Continuous Demands) Example (continued): Normally distributed with mean = and standard deviation = = 25  10 = 15 cents. = 75  25 = 50 cents. The critical ratio is = 0.50/0.65 = Purchase enough copies to satisfy all of the weekly demand with probability The optimal Q* is the 77th percentile of the demand distribution.

18 The Newsboy Model (Continuous Demands) Example (continued):

19 The Newsboy Model (Continuous Demands) Example (continued): Using the data of the normal distribution we obtain a standardized value of = The optimal Q is Hence, he should purchase 15 copies every week.

20 The Newsboy Model (Discrete Demands) Optimal policy for discrete demand: The procedure for finding the optimal solution to the newsboy problem when the demand is assumed to be discrete is a natural generalization of the continuous case. The optimal solution procedure is to locate the critical ratio between two values of F(Q) and choose the Q corresponding to the higher value. That is

21 The Newsboy Model (Discrete Demands) Example:

22 The Newsboy Model (Discrete Demands) Example : The critical ratio for this problem was 0.77, which corresponds to a value of between = 14 and = 15. Since we round up, the optimal solution is = 15. Notice that this is exactly the same order quantity obtained using the normal approximation.

23 The Newsboy Model: Extension to Include Starting Inventory Critical number policy: The optimal policy when there is a starting inventory of x is: Order Q*-x if x<Q*. Don't order otherwise.  Note that Q* should be interpreted as the order-up-to point rather than the order quantity.  It is also known as a target or base stock level.

24 Single-Period Single-Location Model: When there is positive set-up cost Starting Inventory: x Ordering quantity z=(y-x) + (Order-up-to-level: y) Purchasing cost: Total expected cost: here

25 Single-Period Single-Location Model: When there is positive set-up cost (s,S) policy convex G(y)=cy+L(y)

26 Single-Period Single-Location Model: When there is positive set-up cost Optimal Policy: (s, S) Policy: The optimal policy when there is a starting inventory of x is: Order up to S if x < s. Don't order if x>=s.

27 Multi-Period Single-Location Model: When there is no positive set-up cost dynamic programming Optimal Policy: Order-up-to policy still holds, although the order-up-to level changes from period to period: S 1 >= S 2 >= … >= S n m(y,t)=y-t for backorder case; =(y-t) + for lost sales case  : discounter factor

28 Multi-Period Single-Location Model: When there is positive set-up cost Optimal Policy: using dynamic programming and the K-convexity of the objective functions, one can prove the (s n, S n ) Policy still holds: For each period n, the optimal policy when there is a starting inventory of x (maybe <0, backlog) is: Order up to S n if x < s n. Don't order if x>=s n. But different periods may have different (s,S) values. And it’s difficult to compute the values for (s n, S n )

29 Infinite Period Single-Location Model: When there is positive set-up cost Assume:  Demand distribution is i.i.d for all periods  Using cost function with discount factor Optimal Policy: One can prove the (s, S) Policy still holds: For each period, the optimal policy when there is a starting inventory of x (maybe <0, backlog) is: Order up to S if x < s. Don't order if x>=s. But it’s difficult to compute the values for (s, S)

30 Finite Period Multi-Echelon Model Events in each period:  Shipments arrive;  Decision making;  Demand arrives;  Cost evaluation.  Only consider N=2:  one depot base (d) and one retailer outlet (r)  The index n denotes the number of remaining periods until the end of the planning horizon

31 Finite Period Multi-Echelon Model Cost parameters Index n is used when applicable Only for the depot Only for the outlet

32 Finite Period Multi-Echelon Model Other parameters Index n is used when applicable

33 Finite Period Multi-Echelon Model Decision Variables (at the beginning of a period) Index n is used when applicable On hand

34 Finite Period Multi-Echelon Model Basic inequalities Dynamics of the system depotoutlet xrxr vdvd y 1,…, y L y z s 1,…, s l wdwd wrwr

35 Finite Period Multi-Echelon Model At the beginning of a period, let At the end of a period, inventory of the system: = x r ? On hand

36 Finite Period Multi-Echelon Model L >= l ?

37 Finite Period Multi-Echelon Model Total cost:

38 Finite Period Multi-Echelon Model Total cost for n-period decision problem:

39 Finite Period Multi-Echelon Model Total cost for n-period decision problem: (Dynamic Programming)

40 Finite Period Multi-Echelon Model Dynamic Programming: Decomposition Retailer’s Decision

41 Finite Period Multi-Echelon Model Depot’s Decision

42 Infinite Period Multi-Echelon Model Two kinds of objective functions: Average-cost Discounted-cost

43 Summary: Periodic review system Single-location: Single-period Multiple-period Infinite-period Multi-Echelon Single-period ?? Multiple-period (1960) Infinite-period (1984) All are periodic review inventory systems All are centralized control system All are (s, S) policies (order-up-to policy, basic stock policy, or critical number policy when s=S)

44 Lot Size-Reorder Point Systems: Continuous review system  In what follows, we assume that the operating policy is of the (R, Q) form. However, when generalizing the EOQ analysis to allow for random demand, we treat R and Q as independent decision variables.  Decision variables: R = the reorder point (level) in units of inventory Q = the lot size or order quantity

45 Lot Size-Reorder Point Systems Assumptions  The system is continuous-review  Demand is random and stationary  There is a fixed positive lead time L for placing an order  The following costs are assumed  Setup cost at $ K per order.  Holding cost at $ h per unit held per year.  Proportional order cost of $ c per item.  Stock-out cost of $ p per unit of unsatisfied demand

46 Lot Size-Reorder Point Systems Describing demand: The demand during the lead time is a continuous random variable D L with probability density function (or pdf) f L (x), and accumulative distribution function (or cdf) F L (x). Let and be the mean and standard deviation of demand during lead time.

47 Lot Size-Reorder Point Systems Inventory vs. Time Safety Stock level Order arrives Q Order placed Time R Inventory L

48 Lot Size-Reorder Point Systems i.i.d demand: If the demands in all periods are i.i.d; The demand in each period is a continuous random variable D with probability density function (or pdf) f(x), and accumulative distribution function (or cdf) F(x). The the mean and standard deviation of demand during lead time.

49 Lot Size-Reorder Point Systems i.i.d demand with uncertain leadtime: The the mean and standard deviation of demand during lead time.

50 Lot Size-Reorder Point Systems Order quantity Q can be set as EOQ (near-optimal) Reorder point R = L + (safety stock) One method to set the safety stock (SS): SS= k  L ( k is the safety (stock) factor, related to service level or penalty cost data etc.)

51 Additional Discussion of Periodic-Review Systems Define two numbers, s and S, to be used as follows: When the level of on hand inventory is less than or equal to s, an order for the difference between the inventory and S is placed. If x is the starting inventory in any period, then the policy is:  If x <=s, order S - x.  If x>s, don't order.

52 Additional Discussion of Periodic-Review Systems Determining optimal values of (s, S) Note: In periodic-review system, the order quantity Q may be not a constant for all the periods, if order point level s and order-up-to level S are constants.

53 Multiproduct Systems ABC analysis:  The trade-offs between the cost of controlling the system and the potential benefits that accrue from that control.  In multiproduct inventory systems not all products are equally profitable.  A large portion of the total dollar volume of sales is often accounted for by a small number of inventory items.

54 Multiproduct Systems ABC analysis:

55 Multiproduct Systems ABC analysis: Since A items account for the lion's share of the yearly revenue, these items should be watched most closely. Inventory levels for A items should be monitored continuously. More sophisticated forecasting procedures might be used and more care would be taken in the estimation of the various cost parameters required in calculating operating policies.

56 Multiproduct Systems ABC analysis: For B items inventories could be reviewed periodically, items could be ordered in groups rather than individually, and somewhat less sophisticated forecasting methods could be used.

57 Multiproduct Systems ABC analysis:  The minimum degree of control would be applied to C items. For very inexpensive C items with moderate levels of demand, large lot sizes are recommended to minimize the frequency that these items are ordered.  For expensive C items with very low demand, the best policy is generally not to hold any inventory. One would simply order these items as they are demanded.