© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.

Slides:



Advertisements
Similar presentations
Pull System Workshop THE GOAL: Directly link all processes - from the customer back to raw material suppliers - to improve responsiveness, shorten lead.
Advertisements

Inventory Management 2.
Inventory Kanbans Automating the Replenishment Cycle
Pull and Kanban in SAP.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Kanban Training A Comprehensive Training Tool for Using Kanban.
JIT AND LEAN PRODUCTION SYSTEM BY AMAR P. NARKHEDE.
LeanSigma ® Facilitator Training Module 9 – Just in Time.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Supplier Development Kaizen Implementation Kit
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Lean Factory Management (LFM). About Us… Lori McNeely Ultriva Customer Support Specialist 2 Ed Conrey Ultriva Application.
Lean Operations (JIT) Module
Kanban.
1 Session 22 Planning and Scheduling JIT Operations Session 22 Planning and Scheduling JIT Operations John Striebich Copeland Corporation.
Operations Management Just-in-Time Systems Supplement 12
Beni Asllani University of Tennessee at Chattanooga
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Summary: Review of Lean Principles
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
JIT/Lean Production Chapter 13.
3.2.4 Materials Management Process Roberts Tool Company June 13, 2011.
The Lean Enterprise VSM Symbols VSM Symbols Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Lean manufacturing execution
© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.
Kanban A New Approach (Tool for Information Flow)
Reid Lifting - QuickScan Feedback Session Friday 11 July 2014.
Freeleansite.com The Lean Enterprise Why Change ? Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
JIT – Just-In-Time Production
Chapter 13 Lean Systems This presentation covers the material in Chapter 13 - Lean Systems.
POUS Point Of Use Storage. Agenda POUS AGENDA »Introduction and definition Agenda | »Why / Benefits »Examples »When to Use, Not to Use »How to Implement.
© The Delos Partnership 2007 page 1 Supply Chain Techniques Getting the plan executed.
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
Waterspider Lean network optimization Final Project IE Deterministic Optimization Instructor: Dr. Leslie MonplaisirLeslie Monplaisir Reed Parker.
The Lean Enterprise Push versus Pull Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Subsystems Design Review Nathan Arrowsmith, Samantha Reinhart, Rachel Short, Yelena Tuzikova.
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Operations Fall 2015 Bruce Duggan Providence University College.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
FMS 300 Series FBP-FMS320A Introduction to Flow Series: FMS320 to FMS325.
1 Observation of best / better practices The followings are “Some” of the best/better practices observed in the plant tour; Systems- House Lean to evaluate.
LESSON 2 Push and Pull Systems
CHAPTER 9 Lean Manufacturing.
JIT/Lean Production Chapter 13.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Lean Manufacturing Series
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
Chapter 27 Cost Management for Just-in-Time Environments
FDFPLSCP4A Manage and schedule production
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Inputs and Outputs to Aggregate Production Planning
Pull Manufacturing and Just In Time
Lean Manufacturing and Just-In-Time Philosophy
andon Japanese term for a signaling system announcing problems
Welcome to my presentation
Just-In-Time and Lean Production
SM KM Consignment Model
Value Stream Mapping GEOP 4316.
Just-In-Time and Lean Production
Kanban Replenishment for All Types of Industries
Value Stream Mapping ASQ March 2018.
Kanban for Inventory Management
Inputs and Outputs to APP
Presentation transcript:

© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training Kanban – Types and Operating Systems

© Improvement Initiatives (used with permission of author) freeleansite.com Kanban What is Kanban? Card system that controls production & inventory Visual pull system vs. a “black box” push system (MRP)

© Improvement Initiatives (used with permission of author) freeleansite.com Categories of Kanban Instruction Withdrawal Kanban Production Kanban (non lot production) Triangle Kanban (for lot production) Interprocess Kanban Supplier Kanban

© Improvement Initiatives (used with permission of author) freeleansite.com Types of Kanbans & Systems

© Improvement Initiatives (used with permission of author) freeleansite.com What did a Milk Man do? What did a Bread Man do? Milkman vs. Breadman

© Improvement Initiatives (used with permission of author) freeleansite.com Real Life Kanban – Milkman Replenish What Was Consumed. Take Empties Back To Factory Replenish Empties Deliver Only What’s Needed Delivery Milk To House Constant Time

© Improvement Initiatives (used with permission of author) freeleansite.com Breadman Replenishment Replenishment Signals –Empty Rack Inventoried Daily –Kanban Card Attached At Reorder Point –MRP Report Replenishment Options –Constant Quantity or Constant Time –Flow through Rack Material Warehouse Withdrawal Kanban Rack At Preceding Process Outside Stores –Production Ordering Replenishment –Supplier Replenishment Point Of Use Transmitted Signal (Filled From Finished Goods)

© Improvement Initiatives (used with permission of author) freeleansite.com Maturity Path Stockroom –Pick List/ MRP –Kitting –Centralized Breadman –P.O.U. Two Bin Warehouse –Two Bin Line Side –Integrated Supply Inventory Turn Goals −One To Two −Once A Month −Twice A Month −Once A Week Replenishment Signals –Empty Bin –Kanban Card Attached To Bin –Visual – Lines On Floor –MRP Report Replenishment Options –Constant Quantity Or Constant Time –Material Warehouse –Stockroom –Supplier Vendor Managed Inventory Point Of Use At Line or Stockroom Transmitted Signal –EDI –Production Ordering Replenishment –Supplier Replenishment TWO-BIN System

© Improvement Initiatives (used with permission of author) freeleansite.com The Conveyance is the designated path or standard work that a water spider (material handler) takes to replenish the shelves. Conveyance or Milk Run Route: Pitch: Refers to the time relating to the cycle the “water spider” has to replenish the stock. Pitch is a lean concept and is calculated by multiplying cycle time by pack quantity (the number of products per container transferred to finished goods from the work cell). Definitions

© Improvement Initiatives (used with permission of author) freeleansite.com XX X X X X Flow of work Flow of information Simple Common Kanban Kanban Squares

© Improvement Initiatives (used with permission of author) freeleansite.com Rack A ABC Part 1232 Battery Clip Location A-1-A 5 Kanban Shelving & Labeling Schemes

© Improvement Initiatives (used with permission of author) freeleansite.com Weld Kanban Bread Man 1 Week supply Milk Man 2 days supply Based on current Mix 1 day to paint Steps: 1.Final assy pulls from paint kanban. 2.Paint pulls from Weld kanban 3.Welder replenishes weld empties, pulls from S/M Kanban 4.Paint replenishes paint kanban daily and puts finished units back in Paint Kanban 5.Sheet metal replenishes S/M Kanban once a week Sheet Metal Kanban Weld Final Assy Sheet Metal Paint Kanban – No Cards

© Improvement Initiatives (used with permission of author) freeleansite.com Supplier Kanban With Cards Lean Materials Strategy Will Maximize Inventory Turns Through Supplier Managed Inventories Material Supermarket SIPLACE 80S SMT Machines Withdrawal Kanban Post Material Withdrawal Kanban Card Supplier delivers Material with Kanban cards from yesterday attached and picks up today's Kanban cards Material Handler (Water Spider) delivers material to supermarket

© Improvement Initiatives (used with permission of author) freeleansite.com Triangle Kanban Established for internal lot-processing or batch worksites For processes that have lengthy set-up times Production time is at a faster pace than that required in the following process This type of Kanban has a signaling device built in to prepare for change over

© Improvement Initiatives (used with permission of author) freeleansite.com Visual Management Kanban used for batches Mold Part Description Location Date Lot Size Trigger Point Tool # Press

© Improvement Initiatives (used with permission of author) freeleansite.com Part Description Part Number Location parts will be consumed (customer) Area defining lot size and time allotted for run Area defines when product needs to be rescheduled for production Defines which equipment product is dedicated to run on Date is hand written by consuming area when pulled What tool is used to produce this product Triangle Grid Definition

© Improvement Initiatives (used with permission of author) freeleansite.com

© Improvement Initiatives (used with permission of author) freeleansite.com Weld Cell #1 Assembly Cell Weld Cell #2 Triangle Kanbans at Work

© Improvement Initiatives (used with permission of author) freeleansite.com Took 12 years to flow down kanban within Toyota It then took: –8 years to have 60% of first tier suppliers on kanban –20 years to get 98% of first tier suppliers on kanban Only approximately 50% of Toyota suppliers are using kanban systems internally today Toyota Kanban Timeframe

© Improvement Initiatives (used with permission of author) freeleansite.com Keep it simple Develop strategy in phases toward P.O.U. –Utilize stockroom and warehouse on floor Then Eliminate stockroom Then Eliminate warehouse Have supplier continue to play larger role Make it very visual. Should not have to count: –Label shelves and boxes –Use water levels –Taped /sealed boxes –Color codes, Bar Codes –Egg carton approach, mistake proof system Continue to reduce quantity and increase replenishment frequency. Kanbans are inventory (evil) and need to be constantly minimized or eliminated As you move from Kanbans to Job Order (MTO) replenishment - upstream processes must adapt. (sets to job order decreases lot sizes i.e. sheet metal) Implementation keys

© Improvement Initiatives (used with permission of author) freeleansite.com Questions ? Discussion ?

© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training Kanban – Types and Operating Systems