Sales & Inventory Operation Planning (SIOP)

Slides:



Advertisements
Similar presentations
Moving Inventory easily between plants
Advertisements

How to release MRP planned orders through OBPM MO/PO create and maintain through OBPM Jim Simunek
1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.
Creating & Using Compound Cards
Fully integrated AX module Demand forecasts Sales orders Transfer orders Purchase orders Production orders Master Planning Demand Forecasting.
Enhancement Summary Moving Forward with XA IFM Enhancements R7.8 & R9.
Using XA Browser/Power-Link Preferences to Improve Efficiency
What is New in Inventory & Purchasing? Presented by: Derek Kratz.
Main Menu F3 Exit = Press F3 to exit this screen. Commonly Use Keys: F4 Prompt = Position cursor in front of ‘?’ location and press F4 to display a list.
MRF T&S USER REFERENCE MANUAL
What’s New in GE Part 1 (AR, AP, PO, Job Cost Presented by: Derek Kratz.
GL Interfaces 1 Using General Ledger Interfaces The File Maintenance and Procedures to successfully use the General Ledger Interfaces Jim Simunek, CPIM.
2014 User Group Meeting – Maumee Bay Lodge and Convention Center Presented by: John Underwood Brian Gribble.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
PowerLink Navigation The Power Of the ‘Right Click’ in PowerLink Jim Simunek
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Inter-Warehouse Transfers An Enhancement For iSeries 400 DMAS from  Copyright I/O International, 2004, 2005, 2007, 2010 Skip Intro.
1 GL Interfaces – COM Transactions 1 Using the General Ledger Interfaces COM Transactions Jim Simunek, CPIM.
General Financial Supply Website & E-Commerce Solutions This presentation will demo the GFS corporate website and On-Line Order Inquiry options available.
SuttonDirect Sutton Planner Version 2.0. Sutton Planner Primarily designed for make to order / engineer to order environments Benefits ANY environment.
Advanced Planner The Next Generation in Planning Jim Simunek CISTECH Inc.
High Lights of SAP Business One for Manufacturing.
ZETA ERP FINANCE MODULE. Finance General Ledger Accounts receivable Accounts Payable Bank FINANCE MODULE.
SAP R/3 Materials Management Module
Module 10 Setup for Production.
Production Scheduling: What Tool is Right for You?
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Sales Invoices.
Supplier Consignment File Number Why Consignment 1.Reduction of expedites Less over time, airfreight, disruption to the factory 2.Smoother demand.
Faster and Easier Record Entry with Custom Templates & Card Files Jim Simunek, Senior Consultant
Starter Kit. Starter kit Production : Cut operations receiving ECN (Eng. Change Notice) Auto copy to prod orders details Shop floor reporting Generic.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Cash and Cash Management.
Material and Production Planning Options with XA Deborah Vermillion, CPIM, CIRM CISTECH Inc.
New Tools to Increase Sales And to Enhance The User Experience.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Order Policy Codes for use in MRP and AVP
The Systems House TSH User Group Meeting Cases Updated this Year Cases Completed By System Area ODBC2 Purchasing12 Pricing5 Remotenet2 Reporting10.
Master Scheduling Chapter 3.
RemoteNet Presented By The Systems House Inc.. Enhancements Order by multiple selling units of measure Updated the webpage’s look and feel –Style sheets.
Revolutionize Material and Production Planning with Advanced Planner Deborah Vermillion, CPIM, CIRM CISTECH Inc.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
POINT OF SALE ZETA ERP. ZETA POS.
The Best of 2013 Top Features in V12.3 Presenter – Karoline Lapko Account Manager 1.
1 Managing MO’s with OBPM How to use Browser/PowerLink technology to revolutionize Manufacturing Orders Jim Simunek, CPIM
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
XA BROWSER WORKBENCHES ARE COOL! (Broadcast/Receive for Regular Tasks) Brenda Butler, Senior Consultant
Aggregate Planning and Resource Planning Chapters 13 and 14.
Master Production Scheduling
MRP Deep Dive Presented by: Bryan Dehler Implementation Consultant November 10 th, 2015.
Inventory Management The goal of effective inventory management is to “meet or exceed your customers’ expectations of product availability with the amount.
I. About Us Our Product Freedom for Bedding Business Management Sales and Marketing Operations Management Conclusion About Us Our Product Freedom for.
Oracle eBusiness Financials R12 Oracle Receivables Functional Overview TCS Oracle Practice.
Inquiries. Order Inquiries  Where is my order?  When will my backorder ship?  Received my order, but it’s not what I ordered?
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
AXUG Partner Showcase – Introducing Preactor
MRP: Material Resource Planning
Facility Inventory Old Facilities Modern Facilities Classroom Size
Dynamics GP Manufacturing
BUAD306 MRP/ERP.
EzyAccounting An Accounting Software An Accounting Software By: Delicate Software Solutions Dubai, Manage Your Business… Not Just Accounts.
CHAPTER 14 MRP and ERP.
When You Can See It, You Can Believe It.
Reserved for Intro Picture
Production Planning (P/P) Process Flow
Tips & Tricks Beyond the Basics
Cash and Cash Management
Product Training Jobs Where “Lean” principles are considered common sense and are implemented with a passion! ©2008 TTW.
Set Up For Success : Reviewing Manufacturing Best Practices
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis

Sales & Operation Planning Data Flow Forecast – Projection of Future Sales Feeds Material Planning: Master Production Schedule Planning MRP Advanced Planner Planning Applications create Planned MO’s & PO’s Cash Flow Analysis: Use Existing AR, COM Orders & Forecast for income Use Existing AP, PO & Planned Orders for Expenditures

XA Forecasting Forecast Code in Item Balance record determines: Codes: Build forecast for item Build forecast and pass to MRP or MPSP Codes: 0 = No Forecast 1 = Forecast, do not pass to planning 2 = Forecast, pass to MPSP as requirement and MRP as reference 3 = Forecast, pass to MPSP and MRP as requirement

Forecast Code

Forecasting Month End Processing will retrieve booking information from COM Move the periods forward by 1 period Calculate the forecast (using experiential roughing) Menu option to pass forecast to MPSP Updates Demand Interface (DMDIFF) file

Forecast Master Forecast Master holds: Sales vs. Forecast for past 12 periods Forecast for next 12 periods Seasonality Factor for fluctuating sales Safety Stock and Reorder Point (option in Tailoring to update Item Balance record) System Calculated forecast can be manually overridden, either at the ‘Annual’ level or in individual periods

Forecast vs. Sales (past) Forecast Master Forecast vs. Sales (past) Future Forecast

Forecast in SIOP If the Forecast is used as a requirement in the Material & Capacity Planning Applications: Forecast needs to be an accurate representation of sales (i.e. not a ‘wish list’) If there is seasonality within the monthly forecasts, the Master Schedule will need to be ‘smoothed’ Need to verify that there is capacity to produce the forecast prior to running material planning

Other Forecast Options 3rd party forecasting applications can ‘feed’ forecast to material planning Futurecast Customer provided forecasts FD6 MPSP – put forecast in Demand Interface file (DMDIFF) MRP – load forecast to Requirements (REQMTS) file Advanced Planner – put forecast into access table

Forecast Metrics Forecast vs. Sales Shipments by Item/Quantity Forecast vs. Sales Shipments by dollar Customer Order fill rate (actual ship date vs. manufacturing schedule due date) Forecast vs. Master Schedule Production

Planning

Master Schedule Master Schedule needs to be an accurate statement of what is to be built Master Schedule should be isolated to Finished Goods (level 0 of the bill of material) If lower level items are flagged as MPSP items, their parent items also need to be MPSP items Master Schedule should be reviewed by Senior Management within the company Summarized by Product Family

MPSP MPS Source Code in Item Balance determines what will be treated as a requirement in MPSP: F = Forecast only C/E = Customer Orders only B/D = Greater of Forecast or CO for the period (Forecasting Tailoring determines period length weekly/monthly) M = no requirements, master schedule is manually entered

MPSP Sequence of Events Load Forecast to Demand Interface (DMDIFF) Set Horizon dates Generate Master Schedule Test Master Schedule against capacity constraints (rough cut capacity test) Work/approve the Master Schedule Transfer Master Schedule to MRP

Resource Profiles Resource Master record needs to specify hours/day resource is available Resource ID is loaded into Production Facility ‘Prime Load Code’ determines if resource constraint is machine or labor time ‘Resource Profile Build’ job will go through the indented BOM for the MPSP item to find load in constraining facility and time offset

Production Facility Record

Resource Test Resource test will compare master schedule against ‘Resource Profile’ file Resource display will show weekly periods where master schedule has overloaded the constraining facility Use date field to determine which Master Schedules are contributing to overload No report is available, only inquiry

MPSP load to MRP When performing an MRP generation question ‘Transfer new orders from MPSP?’ answered ‘Yes’ will bring the master schedule planned orders from MPSP to MRP to generate planned orders through all levels of the bill of material

Master Schedule Metrics MPSP MO Performance % of MPSP orders started on time (actual start date vs. scheduled start date) % of MPSP orders completed on time (actual completion date vs. due date) Quantity completed vs. quantity orders MPSP order changes within ‘frozen’ zone (i.e. ‘X’ number of days from start and/or due date)

Advanced Planner

Advanced Planner ‘Next Generation’ of material and capacity planning Download planning information from XA into an Access database Planning performed on a PC or Server, eliminating job conflicts

Advanced Planner Sequence of Events Download data to Access Load the plan Review Load to Capacity for work centers (color coding shows level of capacity problems) Work daily plans to eliminate capacity overloads Review Supply vs. Demand (MRP) plan Upload plan to AS400 (updates PLNORD and REQMTS files) Release orders same as MRP

Load to Capacity

Load to Capacity Separate line for each facility Red – Facility over capacity (total) Yellow – Facility over capacity for multiple periods Blue – Facility over capacity for one period Green – Facility under capacity Black – Set up time Can ‘drill down’ to daily load

Daily Load

Daily Load Use ‘Drop & Drag’ to move order Other options available: Will reschedule other operations and, if ‘Operation Where Used’ in BOM is completed, will reschedule material Other options available: Outsource: Have vendor perform operation Alternate Route: use different process (EPDM) Offload: move to different facility (only released MO’s) Level load: let AVP move load

AVP New Functionality vs. MRP Customer Orders consume forecast Unlimited number of calendars, can associate multiple facilities to a single calendar Uses routing times (instead of lead time) to calculate MO start date Schedules load for each operation based on operation start/due date; can plan to the minute Uses Maximum Order Quantity to limit order size Planned Orders due the day before the requirement

Supply/Demand for Item

Save Plan Uploads AVP plan to the AS400: Saves Planned Orders in the PLNORD file Saves requirements to the REQMTS file Use MRP recommendations (PowerLink) or MRP Order Release and Review to create MO’s and PO’s Same metrics as MPSP/MRP apply

Save Plan

Cash Flow

Cash Flow Overview The Cistech Cash Flow application was created to provide a future view of income and expenditures for a company Cash Flow is written with XA Integrator and runs exclusively in Browser (R6) and PowerLink (R7) Works with both AM and IFM financials Provides both summary data and detail to support the summary This application is especially important these days when cash management is essential to your company’s overall health

Sample Screen Time periods are user defined and can be: Daily Weekly Monthly Quarterly

Income – Existing AR Uses the existing invoices in Accounts Receivable (either AM or IFM financials) Uses the invoice due date to determine the period for cash receipt Past Due invoices will display in a ‘Past Due’ period column

Income – Future AR ‘Future AR’ is time phased Customer Orders in COM Uses the Manufacturing Scheduled Ship Date for each item plus the Customer’s payment days (based on the terms code in the customer master record) to determine date of cash receipt Assumes shipment/invoice will occur on the Manufacturing Scheduled Ship Date

Income - Forecast Forecast needs to be by Customer and Item for most accurate cash flow Cistech will provide a custom forecast file/file layout to allow you to populate a forecast file for Cash Flow Uses the Customer’s ‘Payment Terms Days’ to age the forecast

Income Sum of: Existing Invoices in Accounts Receivable Aged Customer Orders Aged Forecast

Payments – Existing AP Uses the Existing Vendor Invoices in Accounts Payable (either AM or IFM Financials) Uses the Payment Due Date on the invoice to determine payment date/period

Payments – Future AP Ages the existing Purchase Orders to determine payment date Takes the ‘Due to Stock Date’ plus the vendor’s Payment Days from the Terms Code specified on the Purchase Order Uses the ‘Offset Days’ For Blanket Items, uses the Due to Stock Date for each release

Payment – MRP Plan P-Plan orders from MRP planned order (PLNORD) file are used to calculate future payments Vendor specified as ‘Primary Vendor’ in Item Balance record will be the Vendor whose terms are used to calculate offset payment days Vendor Master record holds Terms Code

Sample Screen Summary and detail are both provided and can easily be copied to Excel

SIOP Summary Use Sales Forecast as the beginning point for developing Master Schedule Use Planning applications to create material and capacity plan Use Cash Flow analysis to determine company’s cash requirements based on existing orders and plan Use Metrics to determine success of SIOP plan

CISTECH SIOP OFFERINGS Education (Forecasting, COM, MRP, MPSP, AVP) Upcoming “AVP JumpStart” Engagements Free Webinars on AVP functionality Classroom Education opportunities On-site AVP “JumpStart” Consulting Engagements CISTECH’s Cash Flow Analysis Tool QuickLook consulting program for SIOP 1-2 day review of your current SIOP Process Executive wrap up session to provide vision and implementation plan for SIOP improvements CONTACT INFORMATION Brock Miller Ben McCormick brock.miller@cistech.net Ben.mccormick@cistech.net 704-814-0010 704-814-0016

THANK YOU FOR ATTENDING!