Workshop & Listening Session January 13, 2014 NPDES General Permit for Wastewater Discharges from Water Treatment Plants.

Slides:



Advertisements
Similar presentations
EO TP3 SAMPLING WASTE DISPOSAL SYSTEMS.
Advertisements

Wastewater Lagoon Cleanout How do they do that? Why is it important?
Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
Rocky Beem 2013 Smithfield Environmental Training Conference.
Antideg and Municipal Stormwater Discussion Sept. 23, 2009.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee August 24, 2010 Metro Permit Reissuance Proposed.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
Indiana Department of Environmental Management
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
©Lloyd Gosselink Rochelle & Townsend, P.C. Presented by: LAUREN KALISEK (512) Congress Avenue Suite 1900 Austin, Texas.
NPDES Boatyard Permit and Stormwater BMPs Kurt Baumgarten, Gary Bailey and Greg Stegman November 10, 2011.
Proposed Reclassification of a Section of the Cape Fear River in New Hanover and Brunswick Counties (Cape Fear River Basin) to Class SC Swamp (SW) with.
Storm Water Regulation: What’s Next? Presented to: September 30, 2014.
Controlled Discharge Lagoons 2 Cell vs. 3 Cell Bacteria & Ammonia Performance.
State Water Resources Control Board and Regional Water Quality Control Boards Regulatory Authority Review and Concepts for a Statewide Order for Composting.
Environmental Streamlining Task Force Water Quality Ordinance April 5, 2012.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
General Permits Schedule Update Water Quality Partnership Meeting May 19, 2005 Dewey Weaver.
Spokane River Forum 26 May 2013 Spokane’s CSO Reduction Status.
NetDMR Training for KYG4E and KYG4W
Municipal Regional Stormwater NPDES Permit Overview of Requirements, Recommended Changes, and Assistance Needed March 12, 2009.
2014 Industrial General Permit Summary of Key Updates Order DWQ Sandy Mathews August 19, 2014.
DID YOU KNOW? – Cuyahoga River on Fire in Cleveland, Ohio – Raw wastewater spewed in the San Francisco Bay – City of Columbia Discharged Raw Wastewater.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
NPDES Primer for Executive Officers of Wastewater Facilities Indiana Department of Environmental Management Office of Water Quality Compliance Branch.
Draft Phase II Small MS4 General Permit Water Quality Monitoring & Assessment Jonathan Bishop Chief Deputy Director Director State Water Resources Control.
Spokane River Forum 23 May 2011
Inspection Records and Reports NC DWR, Raleigh Regional Office 3800 Barrett Drive Raleigh NC (919)
1 Underground Injection Control (UIC) Program Rules.
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
NPDES Compliance Update NCMA Workshop April 1, 2015.
1 Stakeholder Workshop October 19, 2005 CIWMB Electronic Waste Recycling Program An Overview of Proposed Revisions to Emergency.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Steps in the Hazardous Waste Permit Reissuance Process December 10, 2014.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst.
Chapter 15, Proposed Amendments to Article IV Water Quality Presented by the Orange County Environmental Protection Division April 9, 2013 Presented by.
Status of California NPDES Permit. TIMELINES SEPTEMBER 2010-DRAFT PERMIT AVAILABLE FOR PUBLIC COMMENT OCTOBER 19, 2010-PUBLIC HEARING NOVEMBER 2 ND, 2010-PUBLIC.
NPDES Wastewater Permitting Update 2015 NCMA Workshop Tom Belnick DWR/NPDES Permitting.
Ordinance No. 489 BMC Chapter SURFACE WATER MANAGEMENT.
CASE STUDY NENAGH REGIONAL WATER SUPPLY PLANT. PUBLIC WATER SUPPLIES PERSPECTIVE BOTTLED WATER USAGE in IRELAND BOTTLED WATER USAGE in IRELAND = 0.3 million.
1 Briefing Materials Flow and Nitrogen Issues By: D.C. Water and Sewer Authority February 28, 2008 Blue Plains Regional Committee Presented to: District.
S ELF -I NSURANCE R ULEMAKING A C OLLABORATIVE A PPROACH July 1, 2015.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Clark County’s Municipal Stormwater Permit Stormwater Manual and Code Update National Pollutant Discharge Elimination System & State Waste Discharge General.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
United States Navy San Clemente Island Wastewater Treatment Plant NPDES Permit Renewal Item #11.
Anaerobic Digestion at Wastewater Treatment Plants Regulatory Issues Bureau of Resource Protection April 2011.
Connie Brower NC DENR Division of Water Resources.
Updated eNOI System - Screen Shots Registration Additional Help Text CGP NOI LEW.
2012 Industrial Stormwater General Permit Modification Presented by: Jeff Killelea Department of Ecology Moderated.
Clean Water Act Significant Noncompliance De-Mystified Presentation for Federal Facilities Managers by Michael Barrette Enforcement Targeting and Public.
Anticipated Changes to Oklahoma’s Multi-Sector Industrial Permit for Stormwater Discharges (OKR05)
Waste Discharge Permit: Paradise Irrigation District
Boatyard General Permit Stormwater System
Department of Environmental Quality
Report of the SEEA Editor
John Tinger U.S. EPA Region IX
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
Session Law Water Quality Permitting for Composters
Unit 2 (Reading) F 2015 Unit 2 (Reading) H 2015
Monitoring TDG for Compliance with WA Water Quality Standards
Indiana Department of Environmental Management Office of Water Quality
Wastewater Permitting Updates
Presentation transcript:

Workshop & Listening Session January 13, 2014 NPDES General Permit for Wastewater Discharges from Water Treatment Plants

Permit History First IssuedDec 1997EIA done ReissuedJuly Permittees Reissued (eff date)Sept Permittees To Be Reissued (eff)Sept 2014 Lower: Cl 2 Limit Drop: D.O., Temp, THM, Discharge Rate, Volume Add: SWPPP

Late DMR28 Chlorine effluent exceedance 3 Missed sampling 2 Missing O & M Manual12 Missing Solid Waste Control Plan15 Missing Spill Plan15 Missing Stormwater PPP16 Permit Violations in 2013

Ecology’s Intent for Sept 2014 General Permit Stay the course Reorganize all GPs to make them more consistent Define terms consistently Clarify goals of and methods for monitoring State universal requirements consistently (Chapter WAC)

Specific Tweaks Reorder the terms & conditions Require electronic applications (eNOI) Require electronic reporting of monitoring (eDMR) Fix typos: Report effluent flows S2C2a vs. S2C3 – Possible contradiction S3A – “and all other discharges” S3A – Indicates averaging pH is OK S4 – Groups 1 & 2 not exhaustive S5B – Must be 5 years retention S6B2 – Add “or”

Plan for Re-Issuance 11/8/2013 Send reminder letters to Permittees 1/13/2014 Workshop & Listening Session 3/1/2014 Application Renewal Due Date Early April 2014 Issue Draft Permit: 45-day comment period Early May 2014 Workshop & Public Hearing Mid-July 2014 Issue Final Permit & Responses to Comments 30-day appeal period Sept 1, 2014 Effective Date of Revised Permit

Your Ideas ?