TECH 50800 Project JagWaRz Administrator Console Measure Phase October 29, 2014 Vicky L. Smith.

Slides:



Advertisements
Similar presentations
Start and Stop: Creating Surveys for Courses with Start and End Dates? Michele Borucki CoursEval Implementation & Success Specialist.
Advertisements

June Should you designate your course as a Standard or a Coordinator course? The default setting on newly created courses is Standard, which.
Blackboard Hands-On Lab Session Karl R. Wurst Computer Science Department Daron Barnard Biology Department Center for Teaching and Learning Worcester State.
Microsoft Settlement Project Data Collection Website Contact: Arlene de la Mora, Ph.D. Psychology in Education Research Lab Iowa State University Ames,
How do we know it works? Evaluating Learning Technology Projects EDUCAUSE Learning Initiative Seminar Clare van den Blink
Labreg in WPF By Lior Shetrit Semester: Spring 2009 Instructor: Viktor Kulikov March 25, 2009 Networked Software Systems Lab Department of Electrical Engineering,
Oct 31, 2000Database Management -- Fall R. Larson Database Management: Introduction to Terms and Concepts University of California, Berkeley School.
Access Control System Characterization Presenting: Ehud Bahat Amir Levy Instructor: Erez Zilber November 2003.
Chapter 6 Database Design
Cornell University Library Instruction Statistics Reporting System Members: Patrick Chen (pyc7) Soo-Yung Cho (sc444) Gregg Herlacher (gah24) Wilson Muyenzi.
IT Learning Programme The Evaluations Tool – Workshop 3 18 th May 2010.
Design Aspects. User Type the URL address on the cell phone or web browser Not required to login.
WebInSight Goals Automatically add alt text to webpages Coordinate multiple labeling sources Receive and process labeling requests Do all without harming.
Cooperative Efforts Using Theater Students for Construction Management Technology Philip Dunn PE Assistant Professor Construction Management Technology.
TECH Project Title : Customer service management in automotive industries Measure Phase Date:29/10/2014 Team member: Ponnappa Bheemaiah.
Naming And Directory Services Geetika Sharma 09/22/200 8 CSC8320.
Distributed Software Development
TeamSTEPPS TM National Implementation Measurement The following slides are not part of the TeamSTEPPS Instructor Guide. Due to federal 508 compliance requirements.
TECH Project Title:Customer Service management in automotive industries Improve Phase Date: Team member: Ponnappa Bheemaiah.
Assessing Sustainability Learning Outcomes at Two Community Colleges Jason Lijewski & J. Gabe Estill AASHE Conference 2012 October 16, 2012 Jason Lijewski.
Health and Wellness for all Arizonans Bureau of EMS and Trauma System Secure, Encrypted, On-Line EMS Services System 2015 Training Programs System Instruction.
Annual SERC Research Review - Student Presentation, October 5-6, Extending Model Based System Engineering to Utilize 3D Virtual Environments Peter.
Mastering, Improving and Managing of the Advanced Metering Infrastructure (AMI) Implementations Date: November 19, 2014 Team members: Joe Jones TECH
Guide to MCSE , Enhanced 1 Activity 4-1: Creating and Adding Members to Global Groups Objective: Use Active Directory Users and Computers to create.
Math RtI Kickoff Meeting. Welcome/Introductions Mike Klavon K-12 Math Consultant Robyn Lucas K-5 Math Consultant Sara Gortsema Early Intervention Project.
Grade Management System -Leo Barnabas Mariadoss Anthoniraj.
Library function automation and security System Customize existing Fully-featured Free and Open- Source Library Add RF Identification to the System to.
To provide new information for anyone who is familiar with the former School Improvement process To discuss the information that has been added to,
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Confidential 1 Cisco Learning Credits A Solid Business Value Proposition.
Distributed Software Development VLab project plan.
ITEC 3220M Using and Designing Database Systems
Technical Programming Option Presentation 2015 Mirela Gutica.
Project Implementation for COSC 4120 Database Applications Lab 3.
TECH581 Analyze Presentation Fall 2008 Date: 11/11/08 Team Members: xxxxx xxxxx Sound Removed.
TECH581 Fall 2008 Measure Presentation Date: 10/24/08 Team members: xxxxx Sound Removed.
ENHANCED MONITORING TOOL PROJECT Project Presentation By: David Nasi & Amitay Svetlit Supervisor: Oved Itzhak Software Systems Lab Department of Electrical.
Maps and their textual associations in a digital collection: a report from the Early Washington Maps project. Trevor Bond, Special Collections Librarian.
A proposal Connect the Dots: Curriculum Dashboard for STEM Careers Theodore Frick Associate Professor School of Education Indiana University Bloomington.
A DESIGN AND IMPLEMENTATION COURSE FRAMEWORK: A CURRICULUM PROPOSAL FOR AN EXPERIENTIAL APPROACH TO THE SYSTEMS ANALYSIS AND DESIGN AND THE PROJECTS IN.
THE SLO PROCESS #1 create/update SLO’s, rubrics, & assessment methods #2 assess all students in all sections of all courses #3 maintain SLO assessment.
Module 3: Configuring Mailbox Server Roles. Overview Overview of Exchange Server 2007 Administration Tools Implementing Mailbox Server Roles Managing.
Comm. & Syst. Planning Review School of Business Eastern Illinois University © Abdou Illia, Fall 2002 (Week 16, Monday 12/09/2002)
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Slide 1 Use Case Packets.
1:1 Learning Scott Drossos :1 Learning2.
Progress to Date State and CDC accepted recommendations from DPS and others to add health indicators related to nutrition, physical activity and marijuana.
Presentation to the Before and Afterschool Advisory Committee California Department of Education January 11, 2011 January 11, 2011 Pilot Findings and Field.
Academic Programs and Graduate Studies Office of Semester Conversion October 22, 2015 LI 2250 Get InFORMed: Support for Completing New Course Request Forms.
07/21/97 MOSS Project Introduction and Definition -Senior Project-
Information Management System “Institutions Module" Information Management System “Institutions Module" The System management module is an integrated part.
Introduction to Infant/Toddler Curriculum Planning
Module 6: Configuring User Environments Using Group Policies.
Institute for the Protection and Security of the Citizen HAZAS – Hazard Assessment ECCAIRS Technical Course Provided by the Joint Research Centre - Ispra.
DEC. 11, 2015 DAVID SCHIPPNICK TECH PROJECT STREAMLINE ORDERING IMPROVE/CONTROL.
OCT. 26, 2015 DAVID SCHIPPNICK TECH PROJECT STREAMLINE ORDERING MEASURE PHASE.
Blackboard Learn 9.1 Communicating with Students © 2010 Blackboard Inc. All rights reserved.
IT 242 Week 6 Individual Router and Switch Configuration To purchase this material link Individual-Router-and-Switch-Configuration.
Database Development Lifecycle
Databases and Database Users
RAF9038 Final Coordination Meeting
Plan of Study: A Student’s Road Map to Success
3D Tetris Game on Android OS
CPSC-608 Database Systems
Chapter 6 Database Design
- Partnering with faculty and using their voices -
Unit 3 NT1330 Client-Server Networking II Date: 1/6/2016
An N-tier web application
60 MINUTES REMAINING.
SAMPLE COST ROLL-UP Sample OVERALL COST ROLL-UP
Field monitoring Project (number and title)
Presentation transcript:

TECH Project JagWaRz Administrator Console Measure Phase October 29, 2014 Vicky L. Smith

Brief Review of Project Charter Business Case: Connie Justice, the project Champion, is course coordinator for most the networking and information security courses in CIT. She wants to get this tool implemented within the curriculum by the Fall semester Problem: During the testing of JagWaRz, administrators reported dissatisfaction with the usability of the administrator console. They felt it took too much time and effort to set up or modify a game. Goal: Improve the administrator console by to the point where 75% of instructors agree to implement the tool in the classroom. Process Boundaries: The process starts when an administrator creates a new game construct. The process includes creating a game, adding challenges to a game, editing challenges, and re-ordering challenges. The process stops when game and challenge creation or modification is complete.

SIPOC

CTQ Tree(s) CustomerCTQKPOVKPIV Database Structure Add ChallengesCode Functionality User Interface Living Lab Staff Database Structure Ease of UseEdit ChallengesCode Functionality User Interface CIT Instructors Database Structure Reorder ChallengesCode Functionality User Interface

Process Map

Process Observation Worksheet TIME OBSERVATIONS Date: Process:Create and Modify JagWaRz Game Observer: StepDescription Create Game 2Add Access Control Challenge 1 3Add Attack Exploitation Challenge 2 4Add Wireshark Challenge 3 5Add Maltego Challenge 2 6Add Nmap Challenge 1 7Add Access Control Challenge 3 8Edit Attack Exploitation Challenge 2 9Edit Maltego Challenge 2 10 Insert Attack Exploitation Challenge 3 in 3rd Slot & reorder challenges below 11 Insert Attack Exploitation Challenge 2 in 5th Slot & reorder challenges below Total Time for 1 Cycle (Minutes)

Data Collection Plan

Measurements Time to create a game Time to add a challenge Time to edit a challenge Time to insert a challenge and reorder remaining challenges Sampling 11 Step protocol developed to test those items being measured Observer: Vicky Smith Measurements measured in minutes and seconds Sampling frequency irrelevant One measurement will be collected from each participant

Data Collection TIME OBSERVATIONS Date:10/28/2014Process:Create and Modify JagWaRz Game Observer:Vicky Smith StepDescription Create Game3:003:12 2Add Access Control Challenge 12:453:18 3Add Attack Exploitation Challenge 22:152:54 4Add Wireshark Challenge 32:452:23 5Add Maltego Challenge 22:201:35 6Add Nmap Challenge 12:152:35 7Add Access Control Challenge 33:002:57 8Edit Attack Exploitation Challenge 22:322:47 9Edit Maltego Challenge 22:221:18 10 Insert Attack Exploitation Challenge 3 in 3rd Slot & reorder challenges below17:2916:29 11 Insert Attack Exploitation Challenge 2 in 5th Slot & reorder challenges below9:578:25 Total Time for 1 Cycle (Minutes)50:4047:53