Problem Activity Immediate Predecessor a m b A B 4 16

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

The Normal Distribution
Operations Management Session 27: Project Management.
pert and cpm ch 9 Learning objectives:
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Fall 2001BA Project Management1 BA 301 – Spring 2003.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
Sampling: Final and Initial Sample Size Determination
EMGT 501 HW #3 Due Day: Oct 3 Chapter 10 - SELF TEST 7
MGMT 483 Week 8 Scheduling.
MGMT E-5050 Scott Corey CPAs Project Crashing Homework Solution.
Example: Frank’s Fine Floats
Other Scheduling Methods Dr. Ayham Jaaron Chapter 11.
Applications of the Normal Distribution
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 3 part 2 Project Management.
Normal distribution (3) When you don’t know the standard deviation.
LINE DIAGRAMS Learning objectives After this lecture you will be able to: Prepare and use line diagrams Demonstrate the effect that making activities ‘continuous’
Assuming normally distributed data! Naïve Bayes Classifier.
EMGT 501 HW #2 Solutions Chapter 6 - SELF TEST 21 Chapter 6 - SELF TEST 22.
Chapter 5 Probability Distributions
SEEM 3530 Program Evaluation and Review Technique
Prosjektstyring bma ACTIVITY A B C D E A 4 / 5 / 6 B 8 / 10 / 13 C 9 / 12 / 16 D 7.
Hypothesis Testing and T-Tests. Hypothesis Tests Related to Differences Copyright © 2009 Pearson Education, Inc. Chapter Tests of Differences One.
Analyzing Cost-Time Trade-Offs There are always cost-time trade-offs in project management. – You can completing a project early by hiring more workers.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
SECTION 6.4 Confidence Intervals for Variance and Standard Deviation Larson/Farber 4th ed 1.
Using Normal Distribution to Approximate a Discrete Distribution.
PERT Program Evaluation and Review Technique Tong Wang 511D ERB.
Normal distribution (2) When it is not the standard normal distribution.
AP Statistics: Chapter 7 Review. Let X represent the number of present Mr. Cazzato will receive this holiday from Mrs. Cazzato. Let Y represent the number.
Scott Corey CPAs Project Crashing Homework Assignment MGMT E-5065 Due December 18 th.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Determination of Sample Size: A Review of Statistical Theory
Chapter 7 PERT Project Management for Business, Engineering, and Technology.
§ 5.3 Normal Distributions: Finding Values. Probability and Normal Distributions If a random variable, x, is normally distributed, you can find the probability.
© 2002 Thomson / South-Western Slide 5-1 Chapter 5 Discrete Probability Distributions.
PERT/Activity Diagrams, Completion Probability and the Z Score
Change management control Sources of Change  Project scope changes  Implementation of contingency plans  Improvement changes ISE Ch. 6 1.
An importer of Herbs and Spices claims that average weight of packets of Saffron is 20 grams. However packets are actually filled to an average weight,
Chapter 7 : Risk Management – part 2
Project Crashing. c=6 e=9 b=6 a=7 f=8 g=5 d=4 Given the information below, what is the total additional cost to crash the project as much as possible?
1 1 Slide Continuous Probability Distributions n The Uniform Distribution  a b   n The Normal Distribution n The Exponential Distribution.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Q1) A precedes C. B precedes D & E. C precedes F & G. D precedes G.
8-1 Example: Frank’s Fine Floats Frank’s Fine Floats is in the business of building elaborate parade floats. Frank and his crew have a new float to build.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Chapter 7 Estimation. Chapter 7 ESTIMATION What if it is impossible or impractical to use a large sample? Apply the Student ’ s t distribution.
8.2 The Geometric Distribution 1.What is the geometric setting? 2.How do you calculate the probability of getting the first success on the n th trial?
PERT CPM assumes duration of activity is known with certainty.
PERT/Activity Diagrams, Completion Probability and the Z Score
Random Variables and Probability Distribution (2)
Hospital Establishment
The Distributive Property
PROJECT MANAGEMENT WITH CPM/PERT.
The Normal Probability Distribution Summary
Introduction to Probability & Statistics The Central Limit Theorem
Probability Distribution – Example #2 - homework
Using the Normal Distribution
Random WALK, BROWNIAN MOTION and SDEs
Exam 2 - Review Chapters
Uncertain activity duration (P14)
Uncertain activity duration (P14)
PERT Program Evaluation and Review Technique
Chapter 6 Confidence Intervals.
Statistical Inference for the Mean: t-test
Managing Risk Chapter 7.
PROBABILITY AND STATISTICS
Presentation transcript:

Problem 13-28 Activity Immediate Predecessor a m b A - 9 10 11 B 4 16 The estimated times (in weeks) and immediate predecessors for the activities in a project are given in the following table. Assume that the activity times are independent. Activity Immediate Predecessor a m b A - 9 10 11 B 4 16 C D 5 8 Kelly Devilbiss - Problem 13-28

(a) Calculate the expected time and variance for each activity. b Expected time t= [(a+4m+b)/6] Variance [(b-a)/6]2 A 9 10 11 4/36 B 4 16 144/36 C D 5 8 36/36 Kelly Devilbiss - Problem 13-28

Kelly Devilbiss - Problem 13-28 (b) What is the expected completion time of the critical path? What is the expected completion time of the other patient in the network? Critical Path AC takes 20 weeks Critical Path BD takes 18 weeks Kelly Devilbiss - Problem 13-28

Kelly Devilbiss - Problem 13-28 What is the variance of the critical path? What is the variance of the other path in the network? Critical Path AC: σ2CP = σ2A + σ2C = 4/36 + 4/36 = 8/36 = 0.222 Critical Path BD: σ2CP = σ2B + σ2D = 144/36 + 36/36 = 180/36 = 5 Kelly Devilbiss - Problem 13-28

Kelly Devilbiss - Problem 13-28 (d) If the time to complete path A-C is normally distributed, what is the probability that this path will be finished in 22 weeks or less? t = 20 variance (σ2) = 0.222 standard deviation (√0.222) = 0.47 P(x ≤ 22) = P[(22 – 20)/0.47] = 4.26 Using Appendix A: 4.26 = 1.00 Kelly Devilbiss - Problem 13-28

Kelly Devilbiss - Problem 13-28 (e) If the time to complete path B-D is normally distributed, what is the probability that this path will be finished in 22 weeks or less? t = 18 variance (σ2) = 5 standard deviation (√5) = 2.24 P(x ≤ 22) = P[(22 – 18)/2.24] = 1.79 Using Appendix A: 1.79 = 0.96327 Kelly Devilbiss - Problem 13-28

Kelly Devilbiss - Problem 13-28 (f) Explain why the probability that the critical path will be finished in 22 weeks or less is not necessarily the probability that the project will be finished in 22 weeks or less. Path B-D has more variability and has a higher probability of exceeding 22 weeks. Kelly Devilbiss - Problem 13-28