PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,

Slides:



Advertisements
Similar presentations
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S10-1 Operations.
Advertisements

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
9 Layout Strategies PowerPoint presentation to accompany
LINEAR PROGRAMMING (LP)
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Practice Problems Problem 1:
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Operations Management
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 14-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 14.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 4-20 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle.
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna M2-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Module 2 Dynamic.
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna S-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Supplement 1.
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 16-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 16.
1 Facility Layout Design using Block Diagramming Prepared by: Ryan Allen Brigham Young University March 27, 2006.
COMSOAL Computer Method for Sequencing Operations for Assembly Lines Lindsay McClintock OPERMGT 345 – 004 May 6, 2003.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Copyright © 2003 by Pearson Education, Inc., publishing as Prentice Hall, Upper Saddle River, NJ. All rights reserved. To view maps beyond the range 41-58,
To accompany Quantitative Analysis for Management,9e by Render/Stair/Hanna M4-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Module 4 Game.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
Copyright © 2003 by Pearson Education, Inc., publishing as Prentice Hall, Upper Saddle River, NJ. All rights reserved. To view maps beyond the range 59-76,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Chapter 11 – Counting Methods Intro to Counting Methods Section 11.1: Counting by Systematic Listing.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Assembly Line Balancing
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Assembly Line Balancing Boeing Corporation
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
Technical Note 6 Facility Layout
Chapter 7s Class 1.
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Iron Man Vectors. Iron Man's suit has malfunctioned and will only travel in two directions and for a certain amount of time before it cuts out.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
IE 366 Chapter 9 Organization of Workstations Supplementary Material from: Groover, M.P. (2007). Work Systems and the Methods, Measurement, and Management.
Operations Management Aggregate Scheduling Chapter 13
Combinations COURSE 3 LESSON 11-3
Exponential Smoothing with Trend Adjustment - continued
Process Layout Chapter 8 L L M M D D D D L L M M L L M M G G L L G G A
For these two jobs rate each of Hackman and Oldham ´s core job characteristics on a scale from 1 to 10. What is your total score? What about the job could.
For these two jobs rate each of Hackman and Oldham ´s core job characteristics on a scale from 1 to 10. What is your total score? What about the job could.
Presentation transcript:

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Practice Problems Problem 1: As in most kitchens, the baking ovens in Lori’s Kitchen in New Orleans are located in one area near the cooking burners. The refrigerators are located next to each other as are the dishwashing facilities. A work area of tabletops is set aside for cutting, mixing, dough rolling, and assembling of final servings, although different table areas may be reserved for each of these functions. Given the following Interdepartmental Activity Matrix, develop an appropriate layout for Lori’s Kitchen. ABCD The present layout is below with a distance of 10 feet between adjacent areas.

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Practice Problems Problem 1: As in most kitchens, the baking ovens in Lori’s Kitchen in New Orleans are located in one area near the cooking burners. The refrigerators are located next to each other as are the dishwashing facilities. A work area of tabletops is set aside for cutting, mixing, dough rolling, and assembling of final servings, although different table areas may be reserved for each of these functions. Given the following Interdepartmental Activity Matrix, develop an appropriate layout for Lori’s Kitchen. ABCD The present layout is below with a distance of 10 feet between adjacent areas. Interdepartmental Activity Matrix Cooking burners (A)Refrigerator (B)Dishwashing (C)Work area (D) Cooking burners (A)— Refrigerator (B)—482 Dishwashing (C)—222 Work area (D)—

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Practice Problems Problem 1: As in most kitchens, the baking ovens in Lori’s Kitchen in New Orleans are located in one area near the cooking burners. The refrigerators are located next to each other as are the dishwashing facilities. A work area of tabletops is set aside for cutting, mixing, dough rolling, and assembling of final servings, although different table areas may be reserved for each of these functions. Given the following Interdepartmental Activity Matrix, develop an appropriate layout for Lori’s Kitchen. ABCD The present layout is below with a distance of 10 feet between adjacent areas. Interdepartmental Activity Matrix Cooking burners (A)Refrigerator (B)Dishwashing (C)Work area (D) Cooking burners (A)— Refrigerator (B)—482 Dishwashing (C)—222 Work area (D)— Load * Distance A to B7 * 1070 A to C193 * A to D12 * B to C4 * 1040 B to D82 * C to D222 * Total8190

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Practice Problems Problem 1: As in most kitchens, the baking ovens in Lori’s Kitchen in New Orleans are located in one area near the cooking burners. The refrigerators are located next to each other as are the dishwashing facilities. A work area of tabletops is set aside for cutting, mixing, dough rolling, and assembling of final servings, although different table areas may be reserved for each of these functions. Given the following Interdepartmental Activity Matrix, develop an appropriate layout for Lori’s Kitchen. ABCD The present layout is below with a distance of 10 feet between adjacent areas. Interdepartmental Activity Matrix Cooking burners (A)Refrigerator (B)Dishwashing (C)Work area (D) Cooking burners (A)— Refrigerator (B)—482 Dishwashing (C)—222 Work area (D)— Load * Distance A to B7 * 1070 A to C193 * A to D12 * B to C4 * 1040 B to D82 * C to D222 * Total8190 From the Activity Matrix, C and D should be next to each other and A should be next to C. The other relationships are minor by comparison. One possible solution is: BACD Load * Distance A to B7 * 1070 A to C193 * A to D12 * B to C4 * 2080 B to D82 * C to D222 * Total7000

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Practice Problems Problem 1: As in most kitchens, the baking ovens in Lori’s Kitchen in New Orleans are located in one area near the cooking burners. The refrigerators are located next to each other as are the dishwashing facilities. A work area of tabletops is set aside for cutting, mixing, dough rolling, and assembling of final servings, although different table areas may be reserved for each of these functions. Given the following Interdepartmental Activity Matrix, develop an appropriate layout for Lori’s Kitchen. ABCD The present layout is below with a distance of 10 feet between adjacent areas. Interdepartmental Activity Matrix Cooking burners (A)Refrigerator (B)Dishwashing (C)Work area (D) Cooking burners (A)— Refrigerator (B)—482 Dishwashing (C)—222 Work area (D)— Further improvement may be possible. Try analyzing the following layouts. ACBDACDB Load * Distance A to B7 * A to C193 * A to D12 * B to C4 * 2080 B to D82 * C to D222 * Total5500 Load * Distance A to B7 * A to C193 * A to D12 * B to C4 * 1040 B to D82 * C to D222 * Total7730

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Problem 2: A firm must produce 40 units/ day during an 8-hour workday. Tasks, times, and predecessor activities are given below. Determine the cycle time and the appropriate number of workstations to produce the 40 units per day. Practice Problems TaskTime (Minutes)Predecessor(s) A2— B2A C8— D6C E3B F10D, E G4F H3G Total38 minutes

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Problem 2: A firm must produce 40 units/ day during an 8-hour workday. Tasks, times, and predecessor activities are given below. Determine the cycle time and the appropriate number of workstations to produce the 40 units per day. Practice Problems TaskTime (Minutes)Predecessor(s) A2— B2A C8— D6C E3B F10D, E G4F H3G Total38 minutes Cycle time = = = = 12 minutes/cycle Production time available Units required 8 hrs * 60 minutes/hr 40 units = = = = 3.17 stations or 4 workstations Minimum number of workstations  t i Cycle time 38 minutes 12 minutes/cycle Work time required Cycle time

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Problem 2: A firm must produce 40 units/ day during an 8-hour workday. Tasks, times, and predecessor activities are given below. Determine the cycle time and the appropriate number of workstations to produce the 40 units per day. Practice Problems TaskTime (Minutes)Predecessor(s) A2— B2A C8— D6C E3B F10D, E G4F H3G Total38 minutes Cycle time = = = = 12 minutes/cycle Production time available Units required 8 hrs * 60 minutes/hr 40 units = = = = 3.17 stations or 4 workstations Minimum number of workstations  t i Cycle time 38 minutes 12 minutes/cycle Work time required Cycle time

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Practice Problems Problem 3: Given a cycle time of 4 minutes, develop an appropriate layout. TaskTimeElement Element (Minutes)Predecessor A1— B1A C2B D1B E3C, D F1A G1F H2G I1E, H

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Practice Problems Problem 3: Given a cycle time of 4 minutes, develop an appropriate layout. TaskTimeElement Element (Minutes)Predecessor A1— B1A C2B D1B E3C, D F1A G1F H2G I1E, H Total13 minutes = Minimum number of workstations  t i Cycle time 13 4 = 3 1 / 3 stations or 4 workstations

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Practice Problems Problem 3: Given a cycle time of 4 minutes, develop an appropriate layout. TaskTimeElement Element (Minutes)Predecessor A1— B1A C2B D1B E3C, D F1A G1F H2G I1E, H Total13 minutes = Minimum number of workstations  t i Cycle time 13 4 = 3 1 / 3 stations or 4 workstations Some possible solutions: StationTasksTasks 1A, B, FA, B 2C, DC, D 3EF, G, H 4G, H, II Efficiency = = =  81% 13 minutes 4 station * 4 minutes 13 16