McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.

Slides:



Advertisements
Similar presentations
Presentation Basics Lesson 2.
Advertisements

Microsoft Project Entering and Organizing Tasks Adapted from the Microsoft Step by Step Series by Aaron Schroeder.
TUTORIAL 6 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 25/11/2012 Introduction to MS Project 2007.
PERTEMUAN 3 PPSI Microsoft Project Presentation. What is a Gantt Chart? A Gantt Chart is a visual tool to help Plan, Manage, and Track a project or projects.
Chapter 4 Financial Functions, Data Tables, and Amortization Schedules
Using Macros and Visual Basic for Applications (VBA) with Excel
Excel Tutorial 6 Managing Multiple Worksheets and Workbooks
EXCEL Spreadsheet Basics
Chapter 5 Multitable Forms
| | Tel: | | Computer Training & Personal Development Microsoft Office Project 2003 Intermediate.
Creating a Document with a Table, Chart, and Watermark
® Microsoft Office 2010 Word Tutorial 3 Creating a Multiple-Page Report.
Project Information: Customizing and Printing Lesson 7.
Office 2003 Post-Advanced Concepts and Techniques M i c r o s o f t Word Project 7 Creating an Online Form.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Basics Lesson 1. Skills Matrix SkillsMatrix Skill Start Microsoft Project Standard Create a project planOpen a new project plan Specify a start.
Excel Lesson 3 Organizing the Worksheet
® Microsoft Office 2010 Word Tutorial 3 Creating a Multiple-Page Report.
Office 2003 Introductory Concepts and Techniques M i c r o s o f t Outlook Project and Contact Management with Outlook.
Microsoft Project 98 Tutorial1 Microsoft Project 98 Presented By: Ipsita B. Chowdhury.
Office 2003 Introductory Concepts and Techniques M i c r o s o f t PowerPoint Project 1 Using a Design Template and Text Slide Layout to Create a Presentation.
Copyright 2007, Paradigm Publishing Inc. POWERPOINT 2007 CHAPTER 1 BACKNEXTEND 1-1 LINKS TO OBJECTIVES Create Presentation Open, Save, Run, Print, Close,Delete.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Starting a New Project Cheryl A. Wilhelmsen Lee Ostrom.
Office 2003 Introductory Concepts and Techniques M i c r o s o f t Access Project 1 Creating and Using a Database.
Microsoft Project Presentation By Corey Johnson 10/11/00.
Excel Lesson 3 Organizing the Worksheet
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Excel And Microsoft Project Technology Plug-In T12.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Fine-Tuning Tasks Lesson 11. Skills Matrix SkillsMatrix Skill Manage task constraints and dependencies Explore the effects of constraints and dependencies.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Outlook Project 2 Scheduling Management and Instant Messaging Using Outlook.
Chapter 9 Macros, Navigation Forms, PivotTables, and PivotCharts
Chapter 2 Querying a Database
Tracking progress on tasks and assignments TUTORIAL # 3.
Chapter 3 Maintaining a Database
Microsoft Project – Tutorial 2 Project Goal network company computers to easily share resources within a time frame of three months and within a budget.
Abeer Bin Humaid. Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements”
Working with a Database
Chapter 1 Databases and Database Objects: An Introduction
XP New Perspectives on Microsoft PowerPoint 2002 Tutorial 1 1 Microsoft PowerPoint 2002 Tutorial 1 – Creating a PowerPoint Presentation.
Chapter 6 Advanced Report Techniques
Lecture 1 Saima Gul. What is a Project? A Project is a job that has a beginning and an end (time), a specified outcome ( scope) at a stated level of quality.
Project Management Applications Software Skills.
MS project Abeer Bin Humaid. What is project management? Project management is “the application of knowledge, skills, tools, and techniques to project.
Becoming a Great Project Manager Gini Courter Annette Marquis TRIAD Consulting.
McGraw-Hill/Irwin The Interactive Computing Series © 2002 The McGraw-Hill Companies, Inc. All rights reserved. Microsoft Excel 2002 Lesson 1 Introduction.
Using Microsoft Project Gavrilă Cristian. Using Microsoft Project 1. Introduction 2. Tasks 3. Resources and costs 4. Fine tunning 5. Publishing projects.
Fourth R Inc. 1 WELCOME TO MICROSOFT OFFICE PROJECT 2003 INTRODUCTORY COURSE.
Learning With Computers II (Level Orange) ©2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly.
SOFTWARE PROJECT MGT. SESSION # 3– LAB MANUAL AMAN QUADRI
Microsoft Office 2007 Access Chapter 6 Using Macros, Switchboards, PivotTables, and PivotCharts.
Chapter 1 Creating a Worksheet and a Chart
TUTORIAL 5 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 18/11/2012 Introduction to MS Project 2007.
Microsoft ® Office Project 2007 Training Linking Project tasks [Your company name] presents:
© 2008 The McGraw-Hill Companies, Inc. All rights reserved. WORD 2007 M I C R O S O F T ® THE PROFESSIONAL APPROACH S E R I E S Lesson 15 Advanced Tables.
Introduction to Microsoft publisher
Microsoft Project Tutorial Jesal Bhuta
Copyright 2007, Paradigm Publishing Inc. ACCESS 2007 Chapter 6 BACKNEXTEND 6-1 LINKS TO OBJECTIVES Using the Report Button Using the Report Button Print.
Microsoft Project Tutorial for CSCI 577 Fall 2006 Jesal Bhuta
Pasewark & Pasewark 1 Excel Lesson 3 Organizing the Worksheet Microsoft Office 2007: Introductory.
Chapter 5 Working with Multiple Worksheets and Workbooks Microsoft Excel 2013.
MS WORD INFORMATION TECHNOLOGY MANAGEMENT SERVICE Training & Research Division.
Chapter 4 Financial Functions, Data Tables, and Amortization Schedules Microsoft Excel 2013.
© 2008 Prentice HallAppendix A -1 Introduction to Project Management Appendix Microsoft Project Tutorial Information Systems Project Management: A Process.
Integrating Office 2003 Applications and the World Wide Web
Software project mgt. session # 3– lab manual.
Software project mgt. session # 3– lab manual.
Entering the Task List Dr. George.
Shelly Cashman: Microsoft Excel 2016
Presentation transcript:

McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12

T12-2 LEARNING OUTCOMES 1.Explain what a Gantt Chart is 2.Describe the main steps involved in creating a Gantt Chart using Microsoft Project

T12-3 INTRODUCTION Henry Gantt developed the famous Gantt Chart as a tool for scheduling work in factories A Gantt Chart is a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a calendar format

T12-4 INTRODUCTION Gantt Chart In Microsoft Project

T12-5 CREATING GANTT CHARTS WITH MICROSOFT PROJECT Microsoft Project, a powerful project management software tool that can help manage schedules and resources and to track project progress Microsoft Project is one of the most widely used project management software applications available

T12-6 Microsoft Project Basics Microsoft Project is a Microsoft Office application, so it has many elements similar to other Office titles such as Word, Excel, and PowerPoint The Project Guide is an interactive interface element in Microsoft Project that helps you work through your project from the standpoint of project management processes and goals

T12-7 Microsoft Project Basics

T12-8 Creating a Project File To create a blank Gantt Chart: 1.On the File menu, click New 2.Under New, click the Blank Project link Microsoft Project creates a new project, and the New Project task pane is replaced by the Tasks pane of the Project Guide

T12-9 Creating a Project File To set up your project plan to be scheduled from the project start date and finish date: 1.Click Project, then select Project Information 2.In the Start Date box, enter the start date By default, the State Date box shows today’s date 3.In the Schedule From box, click the Project Start Date 4.Leave the Project Finish Date box as is Microsoft Project will calculate this date for you later 5.Click OK

T12-10 Creating a Project File

T12-11 Saving Your Project To save your project: 1.Click File, then select Save As 2.In the Save As dialog box, choose the drive and folder in which you want to save the new project 3.In the File Name box, enter a descriptive name for your project, and then click the Save button

T12-12 Entering Tasks To enter tasks directly into your project plan, follow these steps: 1.Make sure you are working in the Gantt Chart You can see the name of the current view in the Active View bar that runs vertically along the left side of the view If it does not say Gantt Chart, click View, then select Gantt Chart 2.Type the name of the task in the Task Name field 3.Press Enter or your down arrow key to move to the next row The task name is not recorded and other commands remain unavailable until you press Enter or the down arrow key

T12-13 Entering Tasks

T12-14 Moving Tasks To move a task from one row to another, follow these steps: 1.In the table portion of the Gantt Chart, select the entire task row by clicking the gray row heading 2.With your mouse pointer still over the row heading (the pointer should appear as a black crosshair), drag the task to the location in the Gantt Chart where you want to place it A gray line along the row border follows your mouse movements, indicating where the task will be inserted when you release the mouse button 3.Release the mouse button to insert the task in the new location

T12-15 Inserting Additional Tasks To add a new task to other existing tasks, follow these steps: 1.In the table portion of the Gantt Chart, click the row below where you want the new task to be inserted 2.Click Insert, then select New Task 3.Type the name of the new task, and then press Enter

T12-16 Deleting Tasks To delete a task you do not need, do this: 1.Select the row heading, and then press the Delete key If you want to delete the entire task, click the indicator If you simply want to clear the task name, press Enter or click elsewhere in the view

T12-17 Organizing Tasks into an Outline Tasks need to be structured representing the hierarchy of tasks from the broader perspective to the deep and detailed perspective A task at a higher outline level than other tasks is called a summary task The tasks beneath that summary task are called subtasks

T12-18 Organizing Tasks into an Outline

T12-19 Organizing Tasks into an Outline To make a task a subtask: 1.Click the task 2.On the Formatting toolbar, click Indent The task is indented, and the task above it becomes its summary task To create a subtask under a subtask 1.Click a task under a subtask 2.Click Indent twice To move a subtask to a higher level: 1.Click a subtask, and then click Outdent

T12-20 Organizing Tasks into an Outline

T12-21 Organizing Tasks into an Outline To add a note to a task, follow these steps: 1.Click the task, and then click Task Information on the Standard toolbar or press Shift-F2 2.Click the Notes tab 3.In the Notes area, type a note 4.When finished, click OK

T12-22 Adding Supplementary Information to Tasks

T12-23 Scheduling Tasks To develop an accurate and workable schedule that truly reflects how your project will run, you need to: –Set task durations –Identify dependencies, or the relationships, among tasks –Schedule certain tasks to achieve specific dates when necessary

T12-24 Setting Task Durations To enter a duration, follow these steps: 1.In the Duration field for each task, type the duration, for example, 1w or 4d If a duration is an estimate, add a question mark after it, for example, 1w? or 4d? 2.Press Enter

T12-25 Setting Task Durations

T12-26 Predecessor A task whose start or finish date determines the start or finish date of its successor task. Successor A task whose start or finish date is driven by its predecessor task.

T12-27 Establishing Task Dependencies To link tasks with the finish-to-start task dependency: 1.In the task sheet, select the two tasks you want to link 2.Drag from the predecessor to the successor task if they are right next to each other If they are not adjacent tasks, click the predecessor, hold down the Ctrl key, and then click the successor 3.On the Standard toolbar, click Link Tasks

T12-28 Establishing Task Dependencies

T12-29 Establishing Task Dependencies There are four types of dependencies, as follows: 1.Finish-to-start (FS) - As soon as the predecessor task finishes, the successor task can start 2.Finish-to-finish (FF) - As soon as the predecessor task finishes, the successor task can finish 3.Start-to-start (SS) - As soon as the predecessor task starts, the successor task can start 4.Start-to-finish (SF) - As soon as the predecessor task starts, the successor task can finish

T12-30 SS FF SF

T12-31 Establishing Task Dependencies To apply a task dependency, follow these steps: –Select the task that is to become the successor in the dependency you will be setting –On the Standard toolbar, click Task Information –Click the Predecessors tab –Click the first blank row in the Task Name field, and then click the down arrow –Click the task that is to be the predecessor to the current task –Click the Type field, and then select the type of task dependency: Finish-to-Start (FS), Start-to-Start (SS), Finish-to-Finish (FF), Start-to-Finish (SF), or None –Click OK

T12-32 Lead Time One way to make your project schedule more efficient is to overlap linked tasks where possible. Suppose you have a task that cannot begin until a previous task is finished. You realize that the predecessor does not actually have to be finished after it is 50 percent complete, the successor can begin. The successor essentially gets a 50 percent head start, hence the term lead time. Lead time is expressed as a negative value. It can be a percentage of the predecessor, for example, 25%. Or, it can be a specific time period, for example, 4d or 1w. Select: Task Information > Predecessors tab > Lag field

T12-33 Establishing Task Dependencies

T12-34 Overlapping Linked Tasks by Adding Lead-Time To enter lead-time for a linked task, follow these steps: –Select the successor task that is to have the lead-time –On the Standard toolbar, click Task Information. –In the Task Information dialog box, click the Predecessors tab –In the Lag field for the existing Predecessor, type the amount of lead time you want for the successor –Click OK

T12-35 Overlapping Linked Tasks by Adding Lead-Time

T12-36 Creating Milestones in Your Schedule To change a regular task into a milestone: 1.Select the task you want to become a milestone 2.On the Standard toolbar, click Task Information 3.In the Task Information dialog box, click the Advanced tab 4.Select the Mark Task As Milestone check box

T12-37 Organizing Tasks into an Outline

T12-38 Adding Resources The following types of resources can be assigned to your tasks: –People or equipment –Materials –Cost items To add resources to your project, follow these steps: 1.Click View, then select Resource Sheet to switch to the Resource Sheet view 2.Click View, choose Table, then select Entry 3.In the first Resource Name field, type a resource name, such as Deployment Team and press Enter 4.Enter the names of other resources in the same way

T12-39 Adding Resources

T12-40 Adding Resources To assign a work resource to a task, follow these steps: 1.Click the task to which you want to assign resources 2.On the Standard toolbar, click Assign Resources 3.In the dialog box, click the name of the work resource you want to assign to the task, and then click the Assign button 4.The resource name moves to the top of the Resources list in the table and a default percentage appears in the Units field for the resource 5.When finished assigning resources to tasks, click the Close button

T12-41 Adding Resources

T12-42 Setting Up and Printing When you print a view, it becomes a type of report that further enhances your ability to manage the project To print a view, follow these steps: 1.Open the view, and arrange the data as you want it to appear when printed 2.On the Standard toolbar, click Print

T12-43 Print Views To adjust how the view will look when printed, follow these steps: 1.Open the view, and arrange the data as you want it to appear when printed 2.Click File, then choose Page Setup 3.Specify the options you want for the printed view using the controls on the different tabs of this dialog 4.When finished, click OK 5.On the Standard toolbar, click Print Preview 6.To make further adjustments to the print options, click Page Setup 7.To make further adjustments to the view itself, click Close the Print Preview toolbar, and work in the view 8.When finished with your adjustments, click Print on the Standard toolbar

T12-44 Print Views

T12-45 Print Views

T12-46 Printing Reports Project has more than 40 built-in, preformatted reports

T12-47 Printing Reports To select and print a report, follow these steps: –Click View, then select Reports –In the Reports dialog box, double-click the report category you want –Double-click the report you want –If a dialog box prompts you for more information, such as a date range, enter it, and click OK –When ready to print the report, click Print on the Print Preview toolbar –Select the page range and number of copies you would like to print, and click OK

T12-48 Printing Reports