___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management.

Slides:



Advertisements
Similar presentations
Associate Professor MIS Department UNLV
Advertisements

464 Lecture 09 CPM Revision. Scheduling Techniques r The scheduling techniques are î To plan, schedule, budget and control the many activities associated.
1 1 Slide © 2006 Thomson South-Western. All Rights Reserved. Slides prepared by JOHN LOUCKS St. Edwards University.
Chapter 13 Project Scheduling: PERT/CPM
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Operations Management Session 27: Project Management.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Scheduling the Project
MEM 612 Project Management Chapter 5 Scheduling the Project.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
MGMT 483 Week 8 Scheduling.
Network exercise (P2) Consider the PERT/CPM network shown below. D A 2
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
Chapter 17 Project Management 1Saba Bahouth – UCO.
___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management Example -
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
1 Material Management Class Note # 5-A ( in review ) Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
© J. Christopher Beck Lecture 4: Project Planning 1.
Lecture 4 Project Management Chapter 17.
Drawing AOA and AON networks
___________________________________________________________________________ Operations Research  Jan Fábry Project Management.
___________________________________________________________________________ Operations Research  Jan Fábry PERT Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Reid & Sanders, Operations Management © Wiley 2002 Project Management 17 C H A P T E R.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
1 Material Management Class Note # 6 Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
In Chapter 5: Scheduling the Project From Action Plan and WBS to Gantt chart and project network.  Gantt Chart  Project Network  Activity-on-arrow 
___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry PERT Project Management.
Project Scheduling Software
Project Management in Practice
MEM 612 Project Management Chapter 5 Scheduling the Project.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
1 TCOM 5143 Lecture 11 Project Management. 2 What’s Project Management? Project management involves planning and scheduling the different activities of.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
IE 366 Chapter 6, Section 10 Project Planning and Scheduling.
PROJECT MANAGEMENT.
Project Scheduling
PERT & GANTT CHARTS An Introduction.
The Project Schedule and Budget
Project Scheduling Lecture # 1.
Operations Research Lecture 5.
Most commonly used methods for project management.
Unit 4 Project Design, implementation and evaluation
Projects: Critical Paths
Drawing the AON network
مدیریت عمومی دانش کهن. مدیریت عمومی دانش کهن ارایه تحقیق پایان ترم 3 نمره امتحان پایان ترم 10 نمره ارایه تکالیف کلاس 2 نمره امتحانات.
Operations Research Lecture 4.
Drawing AOA and AON networks
Slides Prepared by JOHN LOUCKS
Operations Research Lecture 7.
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
Material management. Material can be defined as integrated.
Scheduling.
Presentation transcript:

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry  Project Activity 1 Activity 2 Activity 3 Activity 4 Activity 6 Activity 7 Activity 5

Project Management ___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Activity 1 Activity 2 Activity 3 Activity 4 Activity 6 Activity 7 Activity 5 Activity  Node NETWORK – graphical representation of the project

Project Management ___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Activity  Arc NETWORK – graphical representation of the project ACT 1 ACT 11 ACT 2 ACT 3 ACT 4 ACT 5 ACT 6 ACT 7 ACT 8 ACT 9 ACT 10

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry  Event Activity A Design a car Activity B Make a prototype Start point of A Finish point of A Start point of B Finish point of B Project Management

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Activity A Design a car Activity B Make a prototype Project Management Activity A immediately PRECEDES activity B Activity B immediately SUCCEEDS activity A

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management Activity A is the predecessor of Activity B and C Activity A Design a car Activity B Make a prototype 4 Activity C Computer presentation

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management Activity A Design a car Activity B Make a prototype Activity C Computer presentation 5 Activity E Prototype test Activity D Prototype presentation Dummy activity Activity E (Prototype test) follows Activity B Activity D (Prototype presentation) follows Activity B and C

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management - time Activity Requirements - money (cost) - machines - people - material

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management Phases of Project Management Network  Planning  Controlling  Scheduling Start and finish times for each activity Finish time of project Periodic progress reports

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management Methods Deterministic time Critical Path Method (CPM) Probabilistic time Program Evaluation Review Technique (PERT)

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry CPM Project Management

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management CPM  Finish time of the project  Start and finish times of each activity  A critical path consisting of critical activities  Non-critical activities and their possible delay

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management Example - Music DM, Inc.  Christmas compilation of Czech carols  11 activities: 1) Songs Selection 2) Mastering 3) Promotion Material Elaborating CPM

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management Example - Music DM, Inc.  11 activities: 4) Customers Analysis 5) Promotion Material Production 6) Make CD Copies 7) Customers Selection CPM

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management Example - Music DM, Inc.  11 activities: 8) Data to Printing House 9) Promotion Material to Printing House 10) Laser Print 11) Mailing CPM

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management Example - Music DM, Inc. Activity DescriptionDurationPredecessors A Songs Selection 15None BMastering8A C Promotion Material Elaborating 6A D Customers Analysis 7A E Promotion Material Production 4 C, D F Promotion Material to PH 5E G Customers Selection 3D CPM

___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Project Management Example - Music DM, Inc. Activity DescriptionDurationPredecessors H Make CD Copies 12 B, D I Data to PH 3G J Laser Print 9 F, I KMailing8 H, J  All the envelopes have to be delivered until December 12  Objective: set the starting date of the project CPM