Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
Advertisements

Project Management Information Systems and Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Project Scheduling: Gantt/Pert Charts
Developing a Project Plan
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
MGMT 483 Week 8 Scheduling.
Project Management: A Managerial Approach 4/e
Project Management A Managerial Approach
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Importance of Project Schedules
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Lecture 4 Project Management Chapter 17.
Roberta Russell & Bernard W. Taylor, III
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Chapter 5 Planning. 222 Learning Objectives  Clearly define the project objective  Develop a work breakdown structure  Develop a network diagram 
Prepared by: Michael Palazzo
Workshop-3 Gantt and Pert Chart.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
Chapter 5 Planning
HIT241 - TIME MANAGEMENT Introduction
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
ENGM91 ACTIVITY PLANNING Unit 2
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Project Management: A Managerial Approach
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Project Scheduling Project Management 517 Chapter 8 Prof. M. Anvari
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Chapter 17 Project Tracking. Objectives Identify, develop, and use project management tools to track project progress: Schedules Gantt Charts Toll Gate.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
PERT and CPM.
PROJECT MANAGEMENT Approaches
PROJECT MANAGEMENT Approaches By- Rahul Jain. Plan your work first…..then work your plan.
INDE 6332 ENGINEERING PROJECT MANAGEMENT SCHEDULING LECTURE 1 University of Houston Dept. of Industrial Engineering Houston, TX (713)
University of Sunderland CIFM02 Unit 2 COMM02 Activity Planning Unit 2.
Project Management Organization Scheduling 31 January.
CHAPTER VIII CPM-PERT Instructor : Lect.Volkan ÇETİNKAYA.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
BUAD306 Chapter 17 – Project Management. Life is a Project You are already a project manager! Fraternity/sorority projects Sport-related activities Family.
CHAPTER :5 SCHEDULING. Things to Learn – Precedence analysis – Gantt Charts – PERT / CPA.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Chapter 9 Planning. 222 Learning Objectives  clearly defining the project objective  developing a work breakdown structure  developing a network diagram.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Scheduling
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Management: A Managerial Approach
PROJECT MANAGEMENT (BSBI 622)
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Importance of Project Schedules
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
CHAPTER 6 PROJECT TIME MANAGEMENT
Scheduling.
Presentation transcript:

Project Management: A Managerial Approach Chapter 8 Scheduling

Overview WBS to Schedule Process PERT Schedule Types CPM

Scheduling A schedule is the conversion of a project action plan into an operating timetable It serves as the basis for monitoring and controlling project activity Taken together with the plan and budget, it is probably the major tool for the management of projects

Scheduling In a project environment, the scheduling function is more important than it would be in an ongoing operation Projects lack the continuity of day-to-day operations and often present much more complex problems of coordination Chapter 8-2

Scheduling The basic approach of all scheduling techniques is to form a network of activity and event relationships This network should graphically portray the sequential relations between the tasks in a project Tasks that must precede or follow other tasks are then clearly identified in time as well as function Chapter 8-3

Types of Scheduling Operation Scheduling: a type of scheduling that assigns jobs to machines or workers to job. Operation schedule is crucial because many performance measures such as on-time delivery, inventory levels, the manufacturing cycle time, cost and quality, relate directly to the scheduling of each production lot. Workforce Scheduling: a type of scheduling that determine when employee work. Workforce scheduling is equally crucial because measures of performance such as customer waiting time, waiting-line length, utilization, cost, and quality related to the availability of the servers Chapter 8-2

Techniques of Scheduling Gantt Chart Network Techniques: PERT & CPM Both of the techniques is called diagramed technique of scheduling which possesses the following benefits: It is a consistent framework for planning, scheduling, monitoring, and controlling the project It illustrates the interdependence of all tasks, work packages, and work elements Chapter 8-2

Scheduling Network benefits (cont.): It aids in ensuring that the proper communications take place between departments and functions It determines an expected project completion date It identifies so-called critical activities that, if delayed, will delay the project completion time It identifies activities with slack that can be delayed for specific periods without penalty Chapter 8-5

Scheduling Network benefits (cont.): It determines the dates on which tasks may be started or must be started if the project is to stay on schedule It illustrates which tasks must be coordinated to avoid resource timing conflicts It illustrates which tasks may run, or must be run, in parallel to achieve the predetermined project completion date It relieves some interpersonal conflict by clearly showing task dependencies Chapter 8-6

Gantt chart Advantages Limitations Gantt charts are quite commonly used. They provide an easy graphical representation of when activities (might) take place. Simple& quickest method. Limitations Do not clearly indicate details regarding the progress of activities Do not give a clear indication of interrelation ship between the separate activities

Simple Schedule – Gantt Chart

Network Techniques: PERT and CPM With the exception of Gantt charts, the most common approach to scheduling is the use of network techniques such as PERT and CPM The Program Evaluation and Review Technique (PERT) was developed by the U.S. Navy in 1958 The Critical Path Method (CPM) was developed by DuPont, Inc during the same time period Chapter 8-7

Network Techniques: PERT and CPM PERT has been primarily used for research and development projects CPM was designed for construction projects and has been generally embraced by the construction industry The two methods are quite similar and are often combined for educational presentation Chapter 8-8

Scheduling Terminology Activity - A specific task or set of tasks that are required by the project, use up resources, and take time to complete Event - The result of completing one or more activities. An identifiable end state occurring at a particular time. Events use no resources. Network - The combination of all activities and events define the project and the activity precedence relationships

Scheduling Terminology Path - The series of connected activities (or intermediate events) between any two events in a network Critical - Activities, events, or paths which, if delayed, will delay the completion of the project. A project’s critical path is understood to mean that sequence of critical activities that connect the project’s start event to its finish event Chapter 8-10

Scheduling Terminology An activity can be in any of these conditions: It may have a successor(s) but no predecessor(s) - starts a network It may have a predecessor(s) but no successor(s) - ends a network It may have both predecessor(s) and successor(s) - in the middle of a network

Steps in CPM Scheduling 1. Specify the individual activities. 2. Determine the sequence of those activities. 3. Draw a network diagram. 4. Estimate the completion time for each activity. 5. Identify the critical path (longest path through the network) 6. Update the CPM diagram as the project progresses.

Drawing Networks Activity-on-Arrow (AOA) networks use arrows to represent activities while nodes stand for events Activity-on-Node (AON) networks use nodes to represent activities with arrows to show precedence relationships The choice between AOA and AON representation is largely a matter of personal preference Chapter 8-12

The Project Network Use of nodes and arrows Arrows  An arrow leads from tail to head directionally Indicate ACTIVITY, a time consuming effort that is required to perform a part of the work. Nodes  A node is represented by a circle - Indicate EVENT, a point in time where one or more activities start and/or finish.

Activity on Node & Activity on Arrow - An arrow represents a task, while a node is the completion of a task - Arrows represent order of events Activity on Node - A completion of an activity is represented by a node

Requirements: 1. Draw a network diagram 2. Find out the critical Path. Activity Code Activity Duration in days Depends on A Prepare Technical Specifications 10 ----- B Tender Processing 25 C Release of work order 3 D Supply of Boiler equipment 60 E Supply of Auxiliaries 20 F Supply of pipes & pipe fittings G Civil Work 15 H Installation of Auxiliary equipment & piping 5 E,F&G I Installation of Boiler D&H J Testing and commissioning 2 Requirements: 1. Draw a network diagram 2. Find out the critical Path.

Hypothetical Network G B H I A D Start C E F J End 10 25 3 60 20 15 5