Forecast Scheduling: Fad or Fundamental?  President ProjectPro Corp.  Specializes in Microsoft Project and Project Server  BS Engineering MS Business.

Slides:



Advertisements
Similar presentations

Advertisements

©2012 Construction Science, LLC 1 Primavera P6 Settings Presented by Karen Reynolds, Partner Construction Science, LLC.
Database Engine Management tools Connectivity comp SQL Server Agent.
Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.
 One of the global leading companies in providing products, systems and services to construction professionals  Founded in 1941 in Schaan, Liechtenstein.
5 Sole Supplier of U.S. Navy Aircraft Carriers One of Two Builders Constructing Virginia Class Nuclear Submarines Exclusive Provider of Refueling.
Task NameDurationGUIDBaseline Start This is the Task Name2 days90F44E39-646D-4A22-A991-65B NA This is another.
CS Techniques Supporting Project Management (Part 4) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor.
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
PC222 © IOZ AG What Design? Visio Shapes Data Graphics Custom Shapes Images Clipart CAD SVG … What Data? SharePoint Excel SQL … What.
Most Experienced Gold Partner (est. 1994)
PC276 MONITOR PMO Initiating Processes Closing Processes.
Real LifeSimulation Risk HighLow Why Use Simulation? Natural next step in the Portfolio Management Maturity Model.
1.Baseline1 = Q1 Snapshot across all projects 2.Baseline2 = Q2 Snapshot across all projects 3.Baseline3 = Q3 Snapshot across all.
Tim Runcie, PMP, MCP, MCTS, MVP Chetan Patel, PMP, MCP, MCTS.
Business Intelligence infrastructure deep dive in Project Online and Project Server 2013 PC329.
People Processes Knowledge Best Practices & Techniques Outputs Portfolio ProgramProject VisionMissionStrategyMarket Business Results.
The Product Owner prioritizes the requirements or features through feedback from the Stakeholders & interaction with the core team The Team.
35% 92% 46% 1.37 of IT spend is associated with running and evolving applications of the total application spend is dedicated to maintaining applications.
25 years of PPM leadership 100% implementation success rate UMT Customer Presentations at PC CONSULTING EXCELLENCE Partner of the Year in PPM More.
Ready to play some football? Tools Devices Ad-hoc Team collaboration Communication Artifact management Semi-Formal SOME Methodologies and processes.
ParentChild SoC PlanRuleSubPlan/sRule SoC Name (Project Level Custom Field) Project Level custom field MUST contain SoC Name Task SoC.
Lync 2010 (Optional) Project Professional Windows 7 or 8 TechNet IE8 or latest version of Firefox, Chrome or Safari Exchange Server.
San Diego SPUG -
@floydinnovation Program Overview A framework for the business process and technology to automate it Based on Microsoft’s internal, partner and.
Focus6 Founded Subsidiaries in Africa & Austria Managed by its owners (no venture capital) 2011 Subsidiary Switzerland 2010 approx. 130 employees.
blogs.msdn.com/brismith ppmblog.org.
PC214 San Diego SPUG -
Includes 10 user licenses and is good for 3 months! Self-starter? Join How to get started with Project Online and Project Pro for Office 365 Get more.
Mike McLean Senior Program Manager #pc253 #projconf
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
PC317 Prasanna Adavi PMP, MCTS, MCITP, MCT Sr. EPM Consultant EPMA Inc. prasannaadavi
AGCO Corporation Overview Why PPM and Why Microsoft? Implementation Approach Next Steps and Expanding Outside of IT.
PC232 Joined Project in 2010 Team owns virtually all client UI and data access.
Microsoft Project Online: Access to a central instance of Microsoft Project Server 2013 and SharePoint 2013 Connect directly with the preferred.

MPA Best Practices – The Healthy Project Schedule June 7, 2006.
One Two Three Four.
7/26 Project Server UMT 360 Project Server UMT 360 Project Server.
Microsoft Project Conference 2014
Is management going to wait for perfection to understand when/what can be done? Are we going to be able to develop people that well? How will that.
Fourth R Inc. 1 WELCOME TO MICROSOFT OFFICE PROJECT 2003 INTRODUCTORY COURSE.
Introduction Defining the Vision Hitchhiker's Guide to Demand Management in Project Server wlink/p/?LinkId=
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Title of presentation goes here Name of presenter Location/date © 2005 MPA. All rights reserved. Task Management in MS Project Genea Mallow-Jensen President,
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
Office Store or App Catalog Web server App manifest XML Web page HTML + JS + =
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
CS Task BoardCS Risk Matrix CS Milestone Trend Analysis CS Multi Project Editor.
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
CS Task BoardCS Risk Matrix CS Milestone Trend Analysis CS Multi Project Editor.
1 Two Places to Enter Time My Tasks (Project Plans, Proposals and Activity Plans) My Timesheets (Periods and Administrative Time)
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
PC254 Team Members Project LiteWeb Report Status, Access Project Sites Project Managers Project Online + Project Pro Web & Client Create & Update.
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Don’t manage projects No PMPs No time for Timesheets Can not expose Cost Rates Can not expose Staffing Plan.
PC233 Prasanna Adavi PMP, MCTS, MCITP, MCT Sr. EPM Consultant EPMA Inc. prasannaadavi
Things We Think We Know* Stupid Organizations Structures for Success *(But Don’t)
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Implemented Project Server 2007, 2010 and 2013 EPMABlog.com LinkedIn:
© 2008 Prentice HallAppendix A -1 Introduction to Project Management Appendix Microsoft Project Tutorial Information Systems Project Management: A Process.
Using MS-Project INFS MS-Project: 3 Major Parts 1. Project Planning 2. Project Execution & Tracking 3. Project Reporting.
Timesheets and Statusing in Project 2013
MS Project 2016 Level II
Microsoft Project Conference 2014
Microsoft Project Conference 2014
Fine-Tuning your plan and obtaining approval
Microsoft Project Conference 2014
Presentation transcript:

Forecast Scheduling: Fad or Fundamental?

 President ProjectPro Corp.  Specializes in Microsoft Project and Project Server  BS Engineering MS Business Administration  Author “Forecast Scheduling with Project 2013” and “Forecast Scheduling with Project 2010”   Tel:

© ProjectPro Corp. Concepts Introduction WBS Estimates Dependencies Deadlines Resources Assignments Optimal Schedule Reports Up-to-date Schedule Acceptance Setup Planning Executing InitiatingClosing Summary

Project ‘Office Relocation’ Project DeliverablesDue Date Requirements document Aug 12 New Location Aug 30 Remodeling Contract Sep 14 Remodeled New Location Nov 10 Move to New Location Nov 22 A Schedule is a list of things to be created in the project and their due dates. © ProjectPro Corp.

static, deterministic schedule dynamic, forecast schedule © ProjectPro Corp.

Roof frame sheet shingle roof ready Roof frame sheet shingle roof ready © ProjectPro Corp.

Do you tend to enter dates in Start or Finish columns in MS Project? © ProjectPro Corp.

Capture your promises without killing the forecast model! © ProjectPro Corp.

Concepts Introduction WBS Estimates Dependencies Deadlines Resources Assignments Optimal Schedule Reports Up-to-date Schedule Acceptance Setup Planning Executing InitiatingClosing Summary © ProjectPro Corp.

AirframePropulsionTest ReportsSupport Aircraft Nav./Comm. Fuselage Wings Landing Gear Engines Radios Flight ControlsArtifacts Trained staff Navigation Sys.Fuel System Wing Jets Tail Jet Fire Control Fuel Lines Fuel Tanks Voice/Comm. Transponder Processors Displays GPS Recvr. Radar Spares Equipment Cockpit Nose Gear Main Gear Center Sect. Nose Barrel Tail Inner Wing Outer Wing Aft Section Wind Tunnel Test Flight Test Ground Test Structural Integration Simulators Maintenance Manuals Budget Aerodynamics Performance First flight Performance Project Mgt. Schedule © ProjectPro Corp.

Too little detail ? Too much detail ? © ProjectPro Corp.

1% = 0.6 days rounded to 0.5 days 10% = 6 days rounded to 5 days © ProjectPro Corp.

Concepts Introduction WBS Estimates Dependencies Deadlines Resources Assignments Optimal Schedule Reports Up-to-date Schedule Acceptance Setup Planning Executing InitiatingClosing Summary © ProjectPro Corp.

Time WBS If one thing changes in your project, you have to change only one field in the model! © ProjectPro Corp.

Prepare for exam Take the exam FS Prepare for exam Take the exam SF Which is the best model of the situation: A or B? A B © ProjectPro Corp.

write print F S FS Dependency Predecessor Successor prepare for exam take exam SF Dependency Successor Predecessor Dependent Driver © ProjectPro Corp.

Project: 100 tasks, 3 month duration, 180 expected changes: update 100 tasks, 30 twice, 50 other changes Difference: 56 hours! © ProjectPro Corp.

Concepts Introduction WBS Estimates Dependencies Deadlines Resources Assignments Optimal Schedule Reports Up-to-date Schedule Acceptance Setup Planning Executing InitiatingClosing Summary © ProjectPro Corp.

Option A: named resources Resource NameMax Units Tom100% Dick100% Harry100% Resource NameMax Units Visual Basic Programmers300% Option B: generic resources © ProjectPro Corp.

Concepts Introduction WBS Estimates Dependencies Deadlines Resources Assignments Optimal Schedule Reports Up-to-date Schedule Acceptance Setup Planning Executing InitiatingClosing Summary © ProjectPro Corp.

Parts of the Critical Path © ProjectPro Corp.

1 of 2 © ProjectPro Corp.

2 of 2 © ProjectPro Corp.

Harry 3 D Harry 2 D Write X Write Y Harry 3 D Harry 2 D Write X Write Y leveling Optimistic Forecasts Incomplete Critical Path Harry 2 D Harry 3 D Over-allocated Schedule Levelled Schedule © ProjectPro Corp.

Harry Write X Write Y Harry Write X Write Y Write Print OR A resource dependency does not impose sequence. The relationship is that both tasks share the same resource. © ProjectPro Corp.

Concepts Introduction WBS Estimates Dependencies Deadlines Resources Assignments Optimal Schedule Reports Up-to-date Schedule Acceptance Setup Planning Executing InitiatingClosing Summary © ProjectPro Corp.

100% Design Write specs Code Status Date 50% Test unit Test integration Develop screens Write help text Deploy 75% 100% © ProjectPro Corp.

I am almost finished! I have spent 90% of my estimate I have just figured out how to do it Last week I was at 80%, so it must be 90% Leave me alone; I am crunching! © ProjectPro Corp.

Collect and EnterHave MS Project calculate Construction projects Physical % Complete, Actual Start, (Actual) Finish Actual Duration, Remaining Duration, Earned Value, SV, CV, SPI, CPI and EAC Non-construction projects (Actual Start) Actual Duration Remaining Duration OR (Actual Start) Actual Work Remaining Work % Complete Duration Finish © ProjectPro Corp.

100% Design Write specs Code Status Date 75% Test unit Test integration Develop screens Write help text Deploy 60% 100% © ProjectPro Corp.

100% Design Write specs Code Status Date 75% Test unit Test integration Develop screens Write help text Deploy 60% 100% © ProjectPro Corp.

5. Optimal Schedule 4. Accurate Forecasts 3. Reasonable Workloads 2. Complete & Correct Network 1. Clear & Logical WBS © ProjectPro Corp.

MyPC fill out evaluations & win prizes! Fill out session evaluations by logging into MyPC on your laptop or mobile device. Evaluation prizes daily! Claim your prize at the Registration Desk on Level 1. After the event, over 100 hours of resources; including all of the PPT decks and session videos will be available.