Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
Advertisements

Project Management Information Systems and Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Scheduling the Project
Project Scheduling: Gantt/Pert Charts
MEM 612 Project Management Chapter 5 Scheduling the Project.
Developing a Project Plan
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Chapter 10: Project Schedule Planning
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
MGMT 483 Week 8 Scheduling.
Systems Analysis and Design 9th Edition
Project Management: A Managerial Approach 4/e
Project Management: A Managerial Approach
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Importance of Project Schedules
Systems Analysis & Design Sixth Edition Systems Analysis & Design Sixth Edition Toolkit Part 4.
Scheduling and Budgeting
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Prepared by: Michael Palazzo
Workshop-3 Gantt and Pert Chart.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
HIT241 - TIME MANAGEMENT Introduction
Toolkit 4.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Project Scheduling: PERT/CPM
Appendix A Project Management: Process, Techniques, and Tools.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
ENGM91 ACTIVITY PLANNING Unit 2
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Project Management: A Managerial Approach
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Project Scheduling Project Management 517 Chapter 8 Prof. M. Anvari
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Chapter 17 Project Tracking. Objectives Identify, develop, and use project management tools to track project progress: Schedules Gantt Charts Toll Gate.
Network Analysis Terminology
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
PERT and CPM.
INDE 6332 ENGINEERING PROJECT MANAGEMENT SCHEDULING LECTURE 1 University of Houston Dept. of Industrial Engineering Houston, TX (713)
Project Management in Practice
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
University of Sunderland CIFM02 Unit 2 COMM02 Activity Planning Unit 2.
MEM 612 Project Management Chapter 5 Scheduling the Project.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
CHAPTER :5 SCHEDULING. Things to Learn – Precedence analysis – Gantt Charts – PERT / CPA.
Project Management SAI’s Class. Project Management Task Cadets will create a project management plan and their project. a. Define the stages of project.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
Managing the Information Systems Project Cont’d
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Scheduling
deterministic Fixed and known in advance, representing a
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Management: A Managerial Approach
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
AOA A style of project network diagram in which arrows
Importance of Project Schedules
Scheduling.
Presentation transcript:

Project Management A Managerial Approach Chapter 8 Scheduling

Scheduling A schedule is the conversion of a project action plan into an operating timetable It serves as the basis for monitoring and controlling project activity Taken together with the plan and budget, it is probably the major tool for the management of projects

Scheduling In a project environment, the scheduling function is more important than it would be in an ongoing operation Projects lack the continuity of day-to-day operations and often present much more complex problems of coordination

Scheduling The basic approach of all scheduling techniques is to form a network of activity and event relationships This network should graphically portray the sequential relations between the tasks in a project Tasks that must precede or follow other tasks are then clearly identified, in time as well as function

Scheduling Such networks are a powerful tool for planning and controlling a project and have the following benefits: It is a consistent framework for planning, scheduling, monitoring, and controlling the project It illustrates the interdependence of all tasks, work packages, and work elements It denotes the times when specific individuals must be available for work on a given task

Scheduling Network benefits (cont.): It aids in ensuring that the proper communications take place between departments and functions It determines an expected project completion date It identifies so-called critical activities that, if delayed, will delay the project completion time It identifies activities with slack that can be delayed for specific periods without penalty

Scheduling Network benefits (cont.): It determines the dates on which tasks may be started - or must be started if the project is to stay on schedule It illustrates which tasks must be coordinated to avoid resource timing conflicts It illustrates which tasks may run, or must be run, in parallel to achieve the predetermined project completion date It relieves some interpersonal conflict by clearly showing task dependencies

Network Techniques: PERT and CPM With the exception of Gantt charts, the most common approach to scheduling is the use of network techniques such as PERT and CPM The Program Evaluation and Review Technique was developed by the U.S. Navy in 1958 The Critical Path Method was developed by DuPont, Inc during the same time period

Network Techniques: PERT and CPM PERT has been primarily used for research and development projects CPM was designed for construction projects and has been generally embraced by the construction industry The two methods are quite similar and are often combined for educational presentation

Terminology Activity - A specific task or set of tasks that are required by the project, use up resources, and take time to complete Event - The result of completing one or more activities. An identifiable end state occurring at a particular time. Events use no resources. Network - The combination of all activities and events define the project and the activity precedence relationships

Terminology Path - The series of connected activities (or intermediate events) between any two events in a network Critical - Activities, events, or paths which, if delayed, will delay the completion of the project. A project’s critical path is understood to mean that sequence of critical activities that connect the project’s start event to its finish event

Terminology An activity can be in any of these conditions: It may have a successor(s) but no predecessor(s) - starts a network It may have a predecessor(s) but no successor(s) - ends a network It may have both predecessor(s) and successor(s) - in the middle of a network The interconnections depend on the technological relationships described in the action plan

Drawing Networks Activity-on-Arrow (AOA) networks use arrows to represent activities while nodes stand for events Activity-on-Node (AON) networks use nodes to represent activities with arrows to show precedence relationships The choice between AOA and AON representation is largely a matter of personal preference

Drawing Networks

Gantt Charts The Gantt chart shows planned and actual progress for a number of tasks displayed against a horizontal time scale It is an effective and easy-to-read method of indicating the actual current status for each set of tasks compared to the planned progress for each item of the set It can be helpful in expediting, sequencing, and reallocating resources among tasks Gantt charts usually do not show technical dependencies

Scheduling

Gantt Charts There are several advantages to the use of Gantt charts: Even though they may contain a great deal of information, they are easily understood While they may require frequent updating, they are easy to maintain Gantt charts provide a clear picture of the current state of a project They are easy to construct

Summary Scheduling is particularly important to projects because of the complex coordination problems The network approach to scheduling offers a number of specific advantages of special value for projects Critical project tasks typically constitute fewer than 10 percent of all the project tasks

Summary Although research indicates technological performance is not significantly affected by the use of PERT/CPM, there did seem to be a significantly lower probability of cost and schedule overruns Network techniques can adopt either an activity-on-node or activity-on-arc framework without significantly altering the analysis

Summary Networks are usually constructed from left to right, indicating activity precedence and event times as the network is constructed Gantt charts are closely related to network diagrams, but are more easily understood and provide a clearer picture of the current state of the project

Scheduling Questions?

Scheduling Picture Files

Scheduling Figure 8-1

Scheduling Figure 8-2

Scheduling Figure 8-3

Scheduling Figure 8-5

Scheduling Figure 8-6

Scheduling Figure 8-7

Scheduling Figure 8-8

Scheduling Figure 8-9

Scheduling Figure 8-10

Scheduling Figure 8-11

Scheduling Figure 8-12

Scheduling Figure 8-13

Scheduling Figure 8-14

Scheduling Figure 8-15

Scheduling Figure 8-16

Scheduling Figure 8-17

Scheduling Figure 8-20

Scheduling Figure 8-21

Scheduling Figure 8-22

Scheduling Figure 8-23

Scheduling Figure 8-24

Scheduling Figure 8-25

Scheduling Figure 8-26

Scheduling Figure 8-27

Scheduling Figure 8-28

Scheduling Figure 8-30

Scheduling Table Files

Scheduling

Scheduling

Scheduling

Scheduling

Scheduling

Scheduling