Carson City Freeway Paul M. Frost, P.E. Principal Hydraulic Engineer Nevada Department of Transportation Mark E. Forest, P.E. Executive Vice-President.

Slides:



Advertisements
Similar presentations
Introduction to Hydraulic Engineering – CEE3420
Advertisements

Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Session 4 Outline Overview of regulations needed. What should regulations address? What to look for in model regulations? Participation discussion on current.
IV. 1 IV. Overview Of State Standards A.SS1-97: Requirement for Flood Study Technical Documentation.
FDR1 - 1 Flood Risk management History/Mission/Policies.
City of Sunset Valley Drainage Master Plan Assessment Final Recommendation Report March 24, 2009.
HATCH, NM, Background Information Village of Hatch Case Study.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Leon Creek Watershed Master Plan Leon Springs Business Association September 15, 2011.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Welcome to Pinal County. Greg Stanley Pinal County Public Works AACE Regional Conference Oct 1-3, 2008 The Three C’s of Hunt Highway.
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont.
The Story of the Hunting Creek Watershed. Hunting Creek is Impaired.
Channel Repair of Montezuma Creek in Coronado National Memorial following Fire and Flood Damage Stephanie Yard, P.E. & Allen Haden, Aquatic Ecologist Natural.
A Simplified Method of Implementing No Rise Analysis in Unnumbered A-Zones Based Upon No Loss of Conveyance Dwayne E. Culp, Ph. D., P.E., CFM Second National.
THE LIFE-CYCLE COSTS AND BENEFITS OF RAIN GARDENS IN MINNESOTA Chris Hartzell & Joe Nietfeld.
Kansas City Industrial Council Hydrology and Hydraulics
CE 515 Railroad Engineering Drainage Source: AREMA Ch. 5, J. Rose Lectures, Ch. 19 “Transportation exists to conquer space and time -”
Ground Water and Ecosystems Restoration Division Assessing the Effectiveness of Restoration Technologies Elise Striz and Joe Williams.
CRS AUDIT A STUDY ON TYBEE ISLAND’S CRS AND OPEN SPACE PROGRAM National Flood Insurance Program Community Rating System August 28, 2014.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
Rush Creek: A Story of Redemption. Arlington Stormwater Division  Stormwater Division of Public Works is:  Engineers  Education  Environmental Compliance.
Integration Of Stormwater Master Plans with Watershed Plans The Link between Flooding and Development September 23, 2008 Bob Murdock, P.E., CFM.
Upper Brushy Creek Water Control & Improvement District
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015 Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015.
2005 RWQPP Initiative Related Travis County Implementation.
Hydraulic and Hydrologic Considerations in Planning FLOOD RISK MANAGEMENT CLASS EXERCISE Chuck Shadie Mississippi Valley Division.
Unimpaired connectivity between active channel and floodplain Eliminated connectivity between active channel and floodplain Impaired connectivity between.
VILLAGE OF PATCH, NM, FEASIBILITY STUDY Village of Patch Case Study Seattle Environmen tal Planning Class June, 2009 US Army Corps of Engineers Albuquerque.
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
EPA and Flood Risk – Programs and Perspectives Rob Wood Acting Deputy Office Director Office of Wetlands, Oceans and Watersheds U.S. Environmental Protection.
Hydraulic and Hydrologic Considerations in Planning Course FLOOD RISK MANAGEMENT Chuck Shadie Mississippi Valley Division.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
CARSON CITY FREEWAY PHASE 2B-1 PHASE 2 PHASE 2A PHASE 2B.
Development of a Geographic Framework for an Integrated Flood Modeling System Oscar Robayo Tim Whiteaker August 10, 2004 University of Texas at Austin.
Study Guide Chapter 17 1.Know and use the simple equation for discharge. Why is this equation important? 2.What is the gradient of a stream? 3.Describe.
Mason’s Stormwater Utility Program Kathleen Wade-Dorman, P.E. City of Mason.
Marin County Watershed Stewardship Program Marin County Department of Public Works.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Life-Cycle Flood Risk Management
Christie Beeman and Jeff Haltiner Philip Williams & Associates Hydrograph Modification: An Introduction and.
Transportation Projects City Council Workshop May 14, 2013.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
HDR | Presentation Update to Flood Project Working Group Shawn Gooch, P.E. City of Sparks February 27, 2008 North Truckee Drain Relocation Project.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Class 25: Hydrology. Class updates:  Reading: Section Today’s topics:  Water on Earth  Water transport  Water and geology Class 25: Hydrology.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Water and Wastewater Infrastructure Project Financing 1.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
2015 Snohomish County Hazards Mitigation Plan Update Public Meeting Snohomish County Department of Emergency Management, Everett, WA October 23, :00.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
2017 HAMPTON ROADS HAZARD MITIGATION PLAN UPDATE BRIEFING
Kent Edler, Senior Civil Engineer
Integrating Wetlands and Watershed Management: Lessons from the U.S.
Babcock Basin-Design Phase
Land Use and Zoning Committee Special Workshop
Tulsa's Risk MAP Program Goals
Water Quality Protection Zones
Love Field Modernization Program
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
Aldine Westfield Stormwater Harris County Flood Control District
City of Austin Creek Flooding Hazard Mitigation Flood Mitigation Projects for Roadway Crossings Reem J. Zoun, PE, CFM April 2016.
Presentation transcript:

Carson City Freeway Paul M. Frost, P.E. Principal Hydraulic Engineer Nevada Department of Transportation Mark E. Forest, P.E. Executive Vice-President WRC Nevada, Inc. Mahmood Azad, P.E. Development Services Manager Carson City

Carson Freeway Phase I - Red Phase II - Blue

Phase I - Carson Freeway

Project History Corridor Selection Study (1970’s) Carson City Endorses alignment in 1984 (“Edmonds” alignment, though center of valley) Right-of-Way acquisition begins in 1986

Alignment Challenges Clean Water Act of 1980 (Section Wetland Issues) “Species of Concern” - The Carson Wandering Skipper Butterfly Water Quality Issues (NDEP)

“Thank you for visiting Carson City” Nevada Appeal, 1999

Alignment Challenges (cont.) Floodplain Impacts –Alignment is at low point in Eagle Valley (45 sq. mi. watershed, 100-Year = 10,000 cfs –FEMA Floodplains / Floodways Published in ,000 feet of alignment is in within regulatory floodplain 8,000 feet of alignment is in floodway

Floodway 100-Year Floodplain Zone B (Shallow) Carson Freeway

Floodway 100-Year Floodplain Zone B (Shallow) Carson Freeway

Freeway Design Effort NDOT Begins Design in 1994 Recognized the necessity for complimentary City and State designs Carson City and NDOT begin cooperative effort for Freeway and City Master Plan Drainage Design

Freeway Design Effort (cont.) NDOT / City / WRC Studies –Hydrologic Analysis of Eagle Valley –Galena Creek Watershed Comparison Study –Hydraulic Alternative Development Report Included Offsite Detention Alternatives (but only on Public Lands) –404(b)(1) Alternatives Report (minimize environmental impacts) –Lompa Lane Groundwater Analysis

Water Quality Basin Open Channel Collector Channel Detention Basin at Gravel Pit Collector Channel Multi-Cell RCB Single-Cell RCB

New Years Day Flood, 1997 a.k.a. “Then It Rained” Significant event in Eagle Valley Over a 100-Year event on Vicee Canyon Major sediment loads

1997 Flood, continued Could have been worse –Existing gravel pit on Vicee acted as retention basin –Roughly __ feet of sediment deposition

Inter-Local Agreement 1997 event stressed the need for major, comprehensive flood control infrastructure Through a Partnering Process, Carson City and NDOT cooperate to develop a regional flood control solution

Carson City Stormwater Master Plan 1994 Master Plan 401b Alternatives Analysis Northwest Alternatives Analysis

Northwest Alternatives Study Watershed Area for Phase 1B Existing Detention –Within Silver Oaks Development (Evaluation) Detention and Conveyance Alternatives

Watershed Map

Contributing Drainage Area

Northwest Alternatives Study Goals and Purpose: –Regional Flood Control Planning –Integration of Regional Flood Control with Freeway Project –Reduction in Costs for Freeway –Reduction In Costs for Carson City –Reduction in Environmental Impacts –Significant Reduction in Floodplain Area

Northwest Alternatives Study State/Local/Private Partnership –Nevada Department of Transportation –Carson City –Developers Advantages –Land Acquisition –Shared Costs –Regional Flood Control Measures Expedited

Project Features Detention Basins –Shenandoah Heights (Carson City) –Eagle Canyon –Silver Oaks (3 Basins with Golf Course) Conveyance Facilities –Channels –Culverts –Storm Drains

Project Features

Pre-Project Flood Limits

Post-Project Flood Limits

Project Benefits Reduction in Floodplain/Floodways Reduction in Facilities Costs Reduction in Utility Relocation Cost Reduced Flood Risk to Public Facilities Reduced Maintenance Costs

Erosion and Sediment Damages

Conclusions State/Local Partnerships Have Benefits WIN - WIN For Everyone Advanced Planning Is Valuable Everyone Saves $$$ Maintenance is Reduced Results in Significant Public Benefits