NELS status 31th Annual Convention & Technical Symposium ILA October 27-30, 2002 Washington D.C NELS Co-ordinating Agency Office (CAO) Gunn Marit Hernes.

Slides:



Advertisements
Similar presentations
International Aid Transparency Initiative (IATI) First Annual Conference 20 / 21 October 2009 Session 5 The work of the Technical Advisory Group and Proposal.
Advertisements

National Fighter Procurement Secretariat Secrétariat national dapprovisionnement en chasseurs National Fighter Procurement Secretariat Overview October.
European COoperation in the Field of Scientific and Technical Research Role and rules of procedure for Management Committee Carine Petit Science Officer.
MAMA - Network Project WP 7. MAMA-AWARE Coordinated by UNEP/MAP (MB 11) – MED POL Unit.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
The Committee of the Regions A political assembly of the European Union, representing local and regional government.
Partners: France: Ministère délégué à la Recherche Germany: Projektträger des Bundesministeriums für Bildung und Forschung im Deutschen Zentrum für Luft-
We’re here for you. “European Exchange of Best Practice in Arson Investigation and Prevention” European exchange of best practice in arson investigation.
Bled 04/09/2004 Annual Report of the European Regional Focal Point. Dominique PLANCHENAULT.
Expert Group / Brussels October 13 th 2006 This project has received funding from the european community JA AT - JOINT CALL -
IPY Dr Eduard Sarukhanian, Special Adviser to Secretary–General on IPY International Polar Year Status of preparation and the role.
1METLTM – DAMGM ILA Convention and Technical Symposium 32 nd Annual Convention and Technical Symposium of the International Loran Association Boulder,
EASPD Provider Forum – 24 April 2015 Bernadette GROSYEUX Treasurer Welcome everybody.
CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
AEGIS: MOU and Associate Member Agreement Gerald Moore Adapted by Lorenzo Maggioni for Vegetables Network Meeting, 9-13 November 2009, Catania, Italy.
GNSS International Cooperation Munich Satellite Navigation Summit Munich, Germany March 6, 2007 Ralph Braibanti Director, Space and Advanced Technology.
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 Status of the ESA Earth Observation Programmes Dr. Simonetta Cheli Head of Earth Observation.
1 International/OECD Nanotechnology Activities EPA/DoD Meeting on Nanotechnology March 9, 2007 Jim Willis, EPA/OPPT.
Conformity Assessment and Accreditation Mike Peet Chief Executive Officer South African National Accreditation System.
ILA 2003 in Boulder, Colorado 4-6 November 2003 NELS beyond 2005 Gunn Marit Hernes NELS Co-ordinating Agency Office (CAO) Northwest European Loran-C SystemCo-ordinating.
32 nd International Loran Association November 3-7, 2003 FERNS Status and Future Tamotsu Ikeda Erik Johannessen Linn Roth.
N° 1 The European railway Agency: an engine for the integrated railway area EFRTC, Vilamoura on June 24 TH 2005 Olivier PIRON 24 June 2005.
Standing for trust and integrity 19 th XBRL International Conference Paris, June Status FEE XBRL Task Force, what is happening around Europe.
Protecting GPS Transportation Infrastructure – Action Plan Status Report 43rd CGSIC Meeting Washington, DC March 10, 2004  CDR Peter Keane U.S. Department.
RACS coordination meeting 29 May 2008 Brussels. Review of the functioning of the RACs.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Development of Management Information System for the Forestry Sector in Viet Nam F O R M I S II Implementation of PSC’s conclusion during the 2 nd meeting.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
James T. Doherty Institute for Defense Analyses 16 October 2007
COP19 Outcomes : A Developing Country’s Perspective - Vositha Wijenayake Outreach and Advocacy Co-ordinator CANSA.
Conversion Presentation. Overview T. Rowe Price Conversion Team Flowserve Team Flowserve Participant May 2010 June 2010July 2010August 2010September 2010October.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Tenth Annual Meeting of the WG: Objectives and Agenda Jennifer H. Madans U.S.A. 10/29/20151.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
GCM, Annecy – France Activity Report Piotr Grygier Vice President Multifunctional forest management and society matters.
44th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008, agenda.
Trade Union Training on Economic and Financial Analyses of Enterprises INTERNATIONAL LABOUR STANDARDS: PROCEDURES AND SUPERVISION Turin, 9 August 2005.
Progress Meeting WP4 status review Teleconference with GMV, GSA Konstandinos Diamandouros 16/12/2010 GNSS for INnovative road Applications.
RADIONAVIGATION CAPABILITIES ASSESSMENT TASK FORCE CGSIC March 10, 2004   John Augustine U.S. Department of Transportation.
The industrial relations in the Commerce sector EU Social dialogue: education, training and skill needs Ilaria Savoini Riga, 9 May 2012.
Alice Wong, Senior Advisor U.S. Department of State Bureau of Oceans and International Environmental and Scientific Affairs Office of Space and Advanced.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
PNT International Challenges and Opportunities PNT Advisory Board Washington, D.C. March 29, 2007 Ralph Braibanti Director, Space and Advanced Technology.
FERNS Tamotsu Ikeda Tuesday, October 16、 2 007. REPORT on The Fifteenth Session of the Council of the Far East Radionavigation Service (FERNS) 1. Opening.
Climate Action Doha climate conference and initial steps to Paris 2015.
Monitoring, reporting and evaluating climate change adaptation policies at national level in Europe - An overview of where we stand Stéphane Isoard, EEA.
European eLoran Status Dr Sally Basker & Dr Nick Ward General Lighthouse Authorities of the United Kingdom and Ireland International Loran Association,
Community for Risk Management & Assessment Kick-off January 20 th Brussels N. van Os Veiligheids Regio Zuid-Holland Zuid (Safety Region South-Holland South)
Industry Dialogue on xoserve Services 14 th September 2007.
CGSIC International Subcommittee Prague, Czech Republic March 14, 2005 Michael E. Shaw Director, Navigation and Spectrum Policy U.S. Department of Transportation.
BACKGROUND AND OBJECTIVES OF EU FUNDED PROJECT A QUALITY SERVICE FOR VULNERABLE PEOPLE 1 Presentation by Nadja Salson, TUNED coordinator EPSU policy officer.
1 UNECE Inventory of main standards and parameters of the E Waterway network: state of play and next steps UNECE TRANS/SC.3/WP.3 39th session, 16 June.
Periodic Reporting Europe 2 July 2003, UNESCO Headquarters, Room VI.
Organization of work and practical arrangements 28 April-10 May 2013 Geneva, Switzerland David Ogden, Acting Chief, Convention Operations Branch, Secretariat.
SNEL PROGRESS STATUS IN EUROPE. SNEL Status - Istanbul LR2 SNEL recognition is slowly progressing EN THE SAFETY STANDARD FOR THE SAFETY STANDARD.
1 MARITIME TRANSPORT WORKING GROUP Maritime Policy, Ports and Short-Sea Shipping MEDA Motorways of the Sea Sub-Group 4 th Meeting Brussels, 19 December.
FERNS Status and Future
JORGE LIGÜERRE CHAIRMAN COMMUNICATION COMMITTEE, ELA
Social Dialogue Plenary Meeting
Grid Code Review Panel 16th August 2017
Working Group on cultural statistics - Luxembourg 30 June/1 July 2008
DG Environment, Unit D.2 Marine Environment and Water Industry
SOCIAL DIALOGUE WITHIN EUPAN
Improving information exchange:
Study on the Experience and Actions of the Main European Actors Active in the Field of Development Education and Awareness Raising (DEAR) Karina Chircu.
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Irish Presidency Proposal
Presentation transcript:

NELS status 31th Annual Convention & Technical Symposium ILA October 27-30, 2002 Washington D.C NELS Co-ordinating Agency Office (CAO) Gunn Marit Hernes Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 NELS status NELS Agreement NELS member positions NELS observer positions NELS dialogue with industry NELS privatization NELS decision process Conclusions

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 NELS Agreement

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 Through the NELS Agreement the six NELS member nations have committed themselves to run Loran-C until the 31st December 2005 However, some NELS nations indicated on a NELS SC meeting in May 2001 that they do not see a future need for Loran-C as a publicly funded navigation system

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 The future of NELS and Loran-C in Europe has since then been on the agenda for discussion in the NELS Steering Committee meetings. In order to withdraw from the NELS Agreement, each NELS member nation needs to notify the Depositary within April 2004

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 Any Party which has not given notice of denunciation within April 2004 will remain bound by the Agreement for further consecutive periods of seven years. The possibility to decrease a consecutive period to less than 7 years is currently investigated.

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 NELS member positions

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 Germany Will denunciate the NELS Agreement. Loran- C in Germany may be continued, but then as a privatized “system” (Sylt). Denmark Will withdraw from the NELS Agreement unless the need for Loran-C in Europe should be stated in a Radionavigation plan for Europe

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 Norway Will withdraw from the Agreement, if there is no substantial change in the situation for Loran-C in the near future The following elements may change the Norwegian decision:

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02  A positive long-term decision on Loran-C in US  A user demand for Loran-C  Availability of commercial state-of-the-art integrated Loran-C/GNSS receivers  A Norwegian Defence demand for Loran-C  Loran-C included in the European Radio Navigation Plan

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 The Netherlands Will withdraw from the NELS Agreement unless it can be documented that there is a  a safety need for Loran-C  a security need for Loran-C  or a user demand for Loran-C

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 Ireland No formal decision on prolongation or denunciation has been taken. A questionnaire and a consultation document are currently being circulated to Loran-C stakeholders within the marine field of navigation in order to map the need for Loran-C. Evaluated results will be available early The results will influence on the Irish decision.

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 France Will continue to operate the two French Loran- C stations and CCB, independently of what happens with NELS. France is interested in a continuation of the NELS Agreement, but is also open for other ways of running a European system.

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 NELS observer positions

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 UK (NELS observer) UK would like to see Loran-C as a terrestrial backup to GNSS pending improved coverage to the west of the British Isles. An application by UK to NELS has been tabled, but put on hold. Italy (NELS observer) The Italian representatives will resume Loran-C operations in the Mediterranean if other countries implement additional stations serving that area

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 Austria (NELS observer) Austria is interested in Loran-C as a complement to GNSS, but suffer from bad coverage. Austria in cooperation with Czechoslovakia may be interested in putting up a new station, but await a decision on the future for NELS before any national initiatives are taken. EC (NELS observer) Consider it up to the actual users and system providers to use or not use a technology or a system

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 NELS dialogue with industry

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 NELS SC has started a dialogue with the industry The first meeting between the NELS SC and the industry was arranged on 13 June 2002 in Munich. As a follow up from the meeting in Munich the NELS Steering Committee received two proposals from industrial representatives present at the meeting.

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 Both proposals were presented and discussed at an extraordinary Steering Committee meeting in Brüssel 12 September. On the Steering Committee meeting last week a proposal from Reelektronika was approved.

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 Reelektronika will supported by the NELS Steering Committee  develop a miniaturised integrated Loran- C/GNSS receiver  implement a ”TOC-less” UTC service in NELS. A new meeting with the industry will be arranged in conjunction with the NAV 02 conference in London 5-7 November. At this meeting the NELS SC will try to approach the provider side.

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 NELS privatization

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 All NELS nations can or possibly can accept privatization of NELS, e.q sale of system including a licence to operate. A possible privatization of NELS will be addressed when a continuation/denunciation of the NELS Agreement has been decided.

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 NELS decision process

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 Norway and the Netherlands needs to take a a decision on their continuation/denunciation of the NELS Agreement within June 2003 (national budgetary reasons) Denmark, France and Germany have already taken a decision Irland will take a decision spring  NELS milestone, June 2003

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 The following elements may influence a decision on a continuation/denunciation of NELS:  A considerable increase in the number of Loran- C users  Integrated state-of-the-art Loran-C/GNSS receivers and stand-alone Loran-C receivers available for reasonable prices

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02  A need for Loran-C stated in a European Radio Navigation Plan  A documented need for Loran-C of safety reasons  A documented need for Loran-C of security reasons  A positive long-term decision on the future for Loran-C in US.

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 The next regular SC meeting is scheduled March 10-11, The only item on the agenda for this meeting will be the NELS future. At the meeting it is expected that  A decision on the long-term operation of Loran-C in US is public available

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02  The Trinity House study (GPS Vulnerability & Mitigation measures) on behalf of the European Maritime Radionavigation Forum is presented for and evaluated by the European Radio Navigation Plan WG  Results from an evaluation of the need for Loran-C in Irland is available  Results from the evaluation of the need for Loran-C within the Norwegian Defence is available  Further progress within development of integrated as well as stand- alone Loran-C receivers can be documented

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 A follow-up SC meeting is scheduled in week 20 (mid May) A final decision related to the continuation /denunciation of NELS can be expected June A denunciation of NELS does not mean that Loran-C in Europe will be stopped. NELS may from 31 December 2005 not be the operational organisation for Loran-C in Europe

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 Conclusions The NELS future will be settled in June If the NELS Agreement is denunciated the Steering Committee will look into a possible privatization of the system If it is not possible to privatize the system, it is left to each nation to decide what to do with their Loran-C infrastructure

Northwest European Loran-C SystemCo-ordinating Agency Office 28/10/02 Conclusions cont. Independent of what happens with NELS – the NELS SC have agreed that Loran-C shall be continued in Europe with (at least) the same level of operational performance as today until (at least) 31 December 2005.