2014 Northwest Hydro Operators Forum Special Thanks To Our Sponsors: 1.

Slides:



Advertisements
Similar presentations
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
Advertisements

Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
Little Falls Powerhouse Modernization Presented by Brian Vandenburg Avista Utilities, Spokane, WA.
Avista Aquatic Weed Management Programs David Armes Terrestrial Resource Specialist Avista Corporation office: (509) cell: (509)
Spokane River Hydroelectric Project FERC Project No Recreation Plan.
Current Northwest Energy Issues A BPA Customer Perspective Dan James PNWA Summer Meeting June 23, 2014.
Managing Eurasian Watermilfoil in the Lower Clark Fork River Danny MacKay Natural Resource Technician Avista Utilities
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Nick Frohnauer: Minnesota DNR - Invasive Fish Coordinator Before Invasion: Minnesota’s Efforts Against Bighead, Black, Grass, and Silver Carp.
Chikuminuk Lake Hydroelectric Project NORTHWEST HYDROELECTRIC ASSOCIATION February 20, 2013 Elaine Brown, Nuvista CEO.
Conowingo Hydroelectric Power Station and Muddy Run Pump Storage Facility Welcomes the Citizens Advisory Committee.
Interaction Between Rivers and Aquifer Michael Barber Director, State of Washington Water Research Center Washington State University May 8, 2007 Spokane.
Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No March 26, 2013.
Spokane Tribal Hatchery Sherman Creek Hatchery Lake Roosevelt Volunteer Net Pens Monitoring by Lake Roosevelt Fisheries.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Northwest Wisconsin Wind Energy Forum David Donovan St. Croix Casino Turtle Lake, WI May 25, 2006.
Federal Columbia River Power System Operations Planning.
© 2010 Chevron Spill Contingency Plan & Drill Program Pete Lundgreen Chevron Pasco Facility Northwest Area Committee Presentation March 10, 2011.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
Rocky Mountain Area Transmission Study Transmission Projects Recommendations to RMATS Steering Committee June 9, 2004.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
2013 Northwest Hydro Operators Forum Hydro Reporting to NERC GADS Steve Wenke Avista May 7, 2013.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Smart grid in the Pacific Northwest – best practices from the largest demo project in.
BY: Hayley Rogovin, Taylor Doster, Jeremy Littlejohn, Brad Williamson, and Jake Bagwell.
Middle Fork Project Project Description April 25, 2006.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
♡ Hydroelectric Power ♡ Allyson Rosell, Danielle Pierre.
 Hydropower is “electricity [or work] generated using the energy of moving water (National Geographic).”
1 Power Resource Management with assistance of Kevin Gawne Karl Reznichek and Dave Cormie.
Hydroelectric Power Soyoung Lee. What is hydroelectricity? Hydroelectricity is a important electricity that is generated by hydropower which is moving.
Plan Today. Power Tomorrow. The Utility Perspective PNUCC June 11, 2009.
I RRIGATION P ARKS H YDROELECTRIC E LECTRIC D RAINAGE.
Hoover Dam (1936)  Also Called Boulder Dam  Arch & Gravity Dam  726 feet High, 1244 feet Long  Colorado River  Lake Mead.
Things About Taiwan Trillium Learning Global 21 st Century Schools Project Shuanglian Primary School, Taipei, Taiwan Teacher: Jennifer Yin.
6 th Annual Conference ~ Minneapolis Welcome To Minneapolis.
Study Goal:  Perform a “bottom-up” assessment of the sustained peaking capacity of the Pacific Northwest Hydro System over the highest 18 hours in a 3.
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
NORTH FORK SKOKOMISH POWERHOUSE & FISH FACILITIES 2013 NORTHWEST HYDRO OPERATORS FORUM STEVEN FISCHER, P.E.
January 29, 2010Resource Adequacy Steering Committee 1 Sustained Peaking Capacity Analysis Initiated by the Adequacy Forum Input Information from Utilities.
Workforce Training and Education Coordinating Board Update on State Planning and Public Forums WIOA Steering Committee October 8, 2015 Patrick Woods, Operations.
Columbia River Basin Fish Restoration Activities ACCOMPLISHMENTS TO DATE AND UPCOMING ISSUES Bonneville Legal Briefing – October 2015.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
University of Wisconsin-Madison Arboretum Earth Partnership for Schools (EPS) Spring 2014 Distance Learning Course Funding generously provided by the US.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Hydro Power MAKWANA VIPUL B.( ) BHAGAT ARJUN C. ( )
HooverDamHooverDam Las Vegas, Nevada Dams the Colorado River Built between 1931 and 1936.
Warren A. Witt Director of Hydro Operations Ameren Missouri
20 th Annual St. John’s River Cleanup 670 volunteers removed 8070 lbs of trash Special Thanks to: Florida Inland Navigation District (F.I.N.D.)
Northwest Wind Integration Forum Technical Work Group PSE Wind Activities Joe Hoerner October 29, 2009.
ISSUES RELATED TO THE FEDERAL RENEWABLE GOAL
Overview of Spokane- Coeur d’Alene Hydrology
NORTHWESTERN MONTANA REAL ESTATE
Local Transmission Planning Process: Local Transmission Plan Update Meeting December 15, 2016.
Kootenai River / Kootenay Lake Burbot Conservation Strategy
Big Utilities Little Hydro
Vetting the GENESYS Model
Lancaster “Project” Tracy Rolstad Avista Transmission System Planning.
21st Annual.
Membership Development (Membership Recruitment and Recovery Committee - MRR) IEEE Central Texas Section Spring Section Meeting January 21, 2017 San.
AFRD2 Managed Recharge Expansion Projects
Pacific Northwest Power System and Wind Power Development
Bringing Power from the North
Bringing Power from the North
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Spokane register Nomination N Mt
April 13, 2019.
Sacramento Municipal Utility District
Presentation transcript:

2014 Northwest Hydro Operators Forum Special Thanks To Our Sponsors: 1

WELCOME Opening Remarks – Steve Wenke, Avista May 20 – 21, 2014

Celebrating 125 years of service 3

4

5

6

Little Falls HED 36 MW Long Lake HED 81 MW Nine Mile HED 24 MW Kettle Falls GS 62 MW Upper Falls HED 10 MW IdahoWashingto n Oregon Monroe St. HED 15 MW Post Falls HED 18 MW MT Coyote Springs 2 GS 280 MW Rathdrum CT 166 MW Boulder Park GS 24 MW NE CT 60 MW Hydro Facilities: Thermal Facilities: Noxon Rapids HED 570 MW Colstrip GS 215 MW Cabinet Gorge HED 270 MW Generation Facilities

Upgrading hydro Nine Mile Dam  Upgrade Units 1 & 2  Overhaul Unit 4 Spokane River Hydro Upgrades  Nine Mile Dam  Post Falls 2014 Post Falls  Replace concrete facing and spill gates  Improve efficiencies and flexibility

Thank You! Steering Committee Bobbie Rios-Puente – Avista Erica Lee – BPA Avista Coordinators – Gina Armstrong, Heidi Evans, Jennifer Fry, Amber Gifford, Alison Kenyon Thank you to our Sponsors 9