Pacific Northwest National Laboratory Primavera P6 R8 Upgrade Presented by: Brian Fitzsimons 1 Date: 10/18/2011.

Slides:



Advertisements
Similar presentations
©2012 Construction Science, LLC 1 Primavera P6 Settings Presented by Karen Reynolds, Partner Construction Science, LLC.
Advertisements

Project Portfolio Management PPM User Guide Project Managers Version 1.0.
OVERVIEW TEAM5 SOFTWARE The TEAM5 software manages personnel and test data for personal ESD grounding devices. Test and personnel data may be viewed/reported.
Overview of Database Administrator (DBA) Tools
IT Project Management, Third Edition Appendix A1 Appendix A: Guide to Using Microsoft Project 2002.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
OLAP Cubes and Pivot Tables Leveraging the Power of a Microsoft EPM Solution EPM Customization Series Part 1 February 21 st, 2007 Brendan Giles, PMP, MCP.
Gu & Maher University of Sydney, September 2004 DECO2005 Co-Authoring and Changes Management in ArchiCAD Teamwork.
What can PeopleSoft do for You Tools developed at CSU, San Marcos.
Report Distribution Report Distribution in PeopleTools 8.4 Doug Ostler & Eric Knapp 7264.
Hands-On Microsoft Windows Server 2003 Chapter 2 Installing Windows Server 2003, Standard Edition.
Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | Oracle SQL Developer What’s New in Version 4.1 Jeff Smith
Introduction <Header Title> Last saved: YYYY-MM-DD
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Oracle Fusion Middleware Upgrade: Best Practices & Strategy Renga Rengarajan - Oracle.
1 Technology Readiness Maryland /2015 Admin Schedule 2 AssessmentOnline/CBT Testing Dates PARCC - PBAMarch 2 – May 8 MSA ScienceApril 13.
Maintaining and Updating Windows Server 2008
The Gantt Chart in Project Management. What is a Gantt Chart?  A type of chart that shows the Work Breakdown Structure (WBS) in terms of the start and.
Talend 5.4 Architecture Adam Pemble Talend Professional Services.
Project VBA: How and Why it can Make You a Project Guru!
SmartLog X 3 TEAM Basic SmartLog X 3 TEAM Basic DescoEMIT.com USER STATUS USER EDIT TEST LOG ADMIN TEST MACHINE SCHEDULE INSTALL System Requirements:
SSIS Over DTS Sagayaraj Putti (139460). 5 September What is DTS?  Data Transformation Services (DTS)  DTS is a set of objects and utilities that.
Copyright © 2006, SAS Institute Inc. All rights reserved. What Is New in SAS Profitability Management (PrM) 2.1? Authors: Jack Zhang Solution & Version:
1Copyright © 2012, Oracle and/or its affiliates. All rights reserved. Insert Information Protection Policy Classification from Slide 8 Reporting from Contract.
70-294: MCSE Guide to Microsoft Windows Server 2003 Active Directory Chapter 12: Deploying and Managing Software with Group Policy.
New Features Line Item Accounting Customizable windows Family Walkout Date Based Reporting.
Admin Tool June 11, Admin Tool Overview Architecture Implementation Dependencies Futures 2.
TD TownHall Meeting January 28, Agenda Monthly Metric Review Network Upgrade Status Server Move Status Filemaker Pro Cleanup Windows 7 Migration.
1 The following presentation is from the Oracle Webcast “What’s New in P6 EPPM Release 8.1.” As a partner, you may not use the Oracle Power Point template,
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
OLAP Cubes and Pivot Tables Leveraging the Power of a Microsoft EPM Solution EPM Customization Series Part 1 February 21 st, 2007 Brendan Giles, PMP, MCP.
CS480 Computer Science Seminar Introduction to Microsoft Solutions Framework (MSF)
Chapter 6 SAS ® OLAP Cube Studio. Section 6.1 SAS OLAP Cube Studio Architecture.
DireXions – Your Tool Box just got Bigger PxPlus Version Control System Using TortoiseSVN Presented by: Jane Raymond.
(Building the Presentation Layer - KISS). Figuring out what to do! Every was not learnt over night and certainly not without proper help and support.
What’s new in Kentico CMS 5.0 Michal Neuwirth Product Manager Kentico Software.
1 Oracle Enterprise Manager Slides from Dominic Gélinas CIS
1 Microsoft Project Solution Offerings and the next chapter of EPM September 17th, 2003 Brendan Giles, PMP Systemgroup Management Services.
1 MPA Tampa Bay Enterprise Project Management and Reporting Victor M Rivera MS Project Server Administrator, Enterprise Reporting and Project Manager.
Module 1 – Lesson 6 Ms. Tracy. Bell Ringer What is the typical useful life for a personal computer?
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
Oracle Warehouse Builder - Beta 1 New Features Jean-Pierre Dijcks.
JSP Server Integrated with Oracle8i Project2, CMSC691X Summer02 Ching-li Peng Ying Zhang.
CPAG Meeting March 4, I. Welcome II. Information Sharing Overview: New Procedures for Website Support and Service Requests Overview of Impact, Help.
3 Copyright © 2005, Oracle. All rights reserved. Upgrading to Oracle Application Server 10g Release 2.
Hannah Schumacher, PSP, LEED AP, PMI-SP Hill International Charlie Jackson, PSP, Primavera Certified Trainer Project Life Span, LLC Construction CPM Conference.
Zoho Projects. Team Project Tool Zoho Projects is an online project management and collaboration tool Zoho Projects is an online project management and.
VA Primavera P6: Creating a Project and Work Breakdown Structure (WBS) Department of Veterans Affairs Office of Information and Technology IT Workforce.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
Enterprise Project Management solutions 18 June, 2004 MBPCPSI.
VA Primavera P6: Accessing the Program Department of Veterans Affairs Office of Information and Technology IT Workforce Development (ITWD) in collaboration.
CIS-NG CASREP Information System Next Generation Shawn Baugh Amy Ramirez Amy Lee Alex Sanin Sam Avanessians.
17 Copyright © 2006, Oracle. All rights reserved. Information Publisher.
1 Copyright © 2007, Oracle. All rights reserved. Installing and Setting Up the Warehouse Builder Environment.
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
9 Copyright © 2004, Oracle. All rights reserved. Getting Started with Oracle Migration Workbench.
What is the future of OFA?. Bryan Eckle FullNorth Technology Group Provide expert resources for Oracle Applications and Business Intelligence from scoping,
Slide 1 © 2016, Lera Technologies. All Rights Reserved. Oracle Data Integrator By Lera Technologies.
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Daddy, what's a middle wear? An incredibly oversimplified explanation of what Middleware.
Capstone Project MIDAS PROJECT
Appendix A: Guide to Using Microsoft Project 2002
EIN 6133 Enterprise Engineering
Servicenow Admin Certification Training
Real Microsoft Exam Dumps Questions Answers PDF Dumps4Download.us
Introduction of Week 3 Assignment Discussion
What’s New in SEER-H The Galorath Team.
Microsoft Project Past, Present and Future
Project Change Control
CAD DESK PRIMAVERA PRESENTATION.
Appendix A: Guide to Using Microsoft Project 2002
Presentation transcript:

Pacific Northwest National Laboratory Primavera P6 R8 Upgrade Presented by: Brian Fitzsimons 1 Date: 10/18/2011

Outline P6 Environment Drivers Upgrade Process Issues Lessons Learned 2

Pre-Upgrade P6 Environment Version: 6.2 Costing of resources Uses PNNL finance web service to cost resources Over 170 possible rate options for each resource 3 Importing of actual cost from finance system Project WBS elements are assigned financial elements Costs are assigned as resources within the Project WBS Costs are imported monthly and weekly to show traceability

Pre-Upgrade P6 Environment Update P6 enterprise resource library from HR system Runs every night Adds new resources Marks old resources as inactive Industry standard reports 4

Drivers to Upgrade 5 Oracle Fusion Project Portfolio Management (PPM) Early Adopters Requires R8 New Features Trickle ETL process/Extended tables schema Timescaled Logic Diagrams Schedule Comparison Utility Improved Web Interface Excel import/export privileges Planned Value calculation corrections

Web Interface 6

Additional New Features PNNL not currently using Team member status tools status updates iPhone/iPad status application Web portal status application Workflow Standalone version Traveling with schedules Limited/Classified access areas Limited network access 7

Terminology P6/P6 EPPM (Enterprise Project Portfolio Management): Web Interface P6 Professional/P6 PPM (Professional Project Management): Stand-alone Installation P6 Optional Client/P6 Professional for EPPM: Windows Client 8

Upgrade Process 9 New WebLogic Server JBoss no longer supported Database Upgrade Utility Re-implement modifications Testing

Issues Administration only on the Web Users EPS Optional Client interface confusion Performance problem with Earned Value metrics Fixed in recent service pack Problem copying activity codes 10

Lessons Learned More testing Activity code bug found after roll-out Verify test system before upgrading 11

Contacts Brian Fitzsimons – 12