June 23, 2011 Southwestern Illinois Council of Mayors.

Slides:



Advertisements
Similar presentations
Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
Advertisements

Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
AIRPORT AREA INFRASTRUCTURE TIF DISTRICT: Public Hearing Presentation Oct 21, 2013.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
{ Levee Safety and Flood Mapping Texas Water Conservation Association Mid-Year Conference Galveston Island, Texas June 17, 2011 Dan Delich Levee Issues.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
Levee Seepage: Concerns, Evaluations, and Solutions Pete Nix, P. E
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
Chubaka Producciones Presenta :.
October 17, 2011 League of Women Voters of Collinsville.
Welcome Rob Rash CEO/Chief Engineer St
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Blessed Sacrament Campus Jamaica Plain, Boston A newly formed joint venture, Church Square Community Partners LLC has recently purchased the Blessed Sacrament.
John Miller.  Purpose of Erosion/ Sediment Control Codes ◦ Promote Safety ◦ Preserve Property values ◦ Lessen burden on taxpayers for flood control ◦
Innovation Strategies Presented to MODE January 2014.
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
BOND SALE PLANNING WOODLAND PUBLIC SCHOOLS May 14, 2012 Prepared by: Mark Prussing Senior Managing Consultant Public Financial Management, Inc nd.
Sector Planning Process Alachua County Commission July 8 th,
US Army Corps of Engineers BUILDING STRONG ® USACE Status: Metro East Levees September 21, 2011.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
January 6,  INTRODUCTION  BACKGROUND  SUMMARY  QUESTIONS  SUPPLEMENTAL INFORMATION ◦ PROPOSED BUDGETS, LEVIES AND CIRCUIT BREAKER 2.
Sept. 23 NWC Boston Yes We Can! (We already have in Texas)
Exeter 8/12/00.
Eastern Snake River Plain Comprehensive Aquifer Management Plan (CAMP) Progress Report ESHMC January 13, 2009.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Thanks to MTA County AB 811 Program Design, Implementation, Admin Consultants (Internal Services Department/Consultant) District Formation Milestone Update.
Jeff Raybould, Idaho Water Resource Board December 9,2014 Idaho Council on Industry & Environment Statewide Trends for Water Supply State Water Plan Henrys.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Montana and the National Flood Insurance Program Marijo Brady, P.E., CFM FEMA Region VIII
Tempe Town Lake Downstream Dam Replacement NEW DAM ALTERNATIVES SELECTION January 5, 2012.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Public Meeting : Zoning By-law Amendment Application File No. ZBA 01/ Wellington Road 124 Dan Currie, MA, MCIP RPP MHBC PLANNING March 7, 2016.
MISSISSIPPI AIRPORTS ASSOCIATION 2016 Legislative Report.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
ITEM 6.a AT GREEN BUILDING ORDINANCE City Council – August 25, 2009.
Council Grove Zoning & Planning Committee Final Plan Presentation March 9, 2016.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
What is the “Competitiveness Agenda”?
FY 2017/18 General Budget Workshop
Overview of property tax levies for Idaho Schools
Flood Damage Prevention Code Update
Water System Acquisition
Mn Buffers Program: Overview of 2016 Statute Clarifications
SW Illinois Flood Prevention Project
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Why do people try to manage rivers?.
Planning Commission Hearing
Living with Streams in Flood
Flood Plain Regulations
McDonald’s calendar 2007.
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
Sacramento Environmental Commission January 2019.
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

June 23, 2011 Southwestern Illinois Council of Mayors

Designed and built in 1940’s and improved in ‘50s by Corps of Engineers as 500-year levees Owned and maintained by Levee Districts Wood River Drainage and Levee District Metro-East Sanitary District Prairie DuPont Drainage and Levee District Fish Lake Drainage and Levee District Owned and maintained by Corps Chain of Rocks Levee

155,000 people 40% minority 21% low income 174 square miles Longstanding and historic communities Alton Wood River Granite City East-St. Louis Columbia Dupo East Carondelet Collinsville

Industrial core of the St. Louis region 55,000+ jobs Conoco – Phillips U.S. Steel Solutia Afton Chemical

Corps of Engineers identified Design Deficiencies that may compromise the “authorized level of protection” ( feet on St. Louis gauge – approx. 500-year) Understanding of risk has improved Better design methods Increased design factor of safety post-Katrina FEMA decides to de-accredit the levee system “Fear, uncertainty, and doubt” about flood protection erodes the economic security of Metro-East

Mandatory Flood Insurance $20 million/yr additional premiums for homeowners and businesses Another $30 million/yr for larger businesses Building Standards Raise buildings above base flood elevation Loss of Property Value Negative Business Climate

Resurgence of manufacturing Intergovernmental success story Renewed marketing opportunities

FEMA announces deaccreditation – August 2007 Haine introduces legislation to impose tax and create Flood Prevention Districts – November 2007 Illinois Flood Prevention District Act signed into law – May 2008

County FPDs are appointed – June 2008 Tax approved by county boards - July-Sept 2008 Tax collections start – January 2009 Corps concludes project to be finished in 2044 – May 2009 Intergovernmental Agreement signed June 2009 First meeting of FPD Council – June 2009 FPD staff hired – July 2009 Authorize challenge of FIRMS – August 2009

Select financial advisor – September 2009 Adopt project strategy – September 2009 Begin levee inspection – December 2009 Select consultants for design competition – December 2009 Issue RFP for design competition – February 2010 Select design consultants – June 2010 Begin design process

File suit against FEMA – November 2010 Issue $94 million in bonds – November 2010 Progress set of construction drawings – March % design drawings – May 2011 Project implementation plan – June % design drawings – December 2011 Construction begins – 1 st Qtr ?

Finish improvement of levee systems in three counties at a cost of about $160 million in five years (2015) or less Limit economic hardship during the time that flood protection is being improved

Scale: None Drawn by: MG Date: March 16, 2011 AMEC File No LEVEE ILLUSTRATION Levee Aquifer Semi-pervious Blanket Aquifer Semi-pervious Blanket Levee

Scale: None Drawn by: LS Date: March 16, 2011 AMEC File No WOOD RIVER PLANS AND CROSS SECTIONS CUTOFF WALLS- Narrow slots filled with slurry. BEDROCK DEEP CUTOFF WALLS- Penetrate through the aquifer to bedrock SHALLOW CUTOFF WALLS-Partially penetrate the aquifer

Scale: None Drawn by: LS Date: March 16, 2011 AMEC File No WOOD RIVER PLANS AND CROSS SECTIONS SEEPAGE BERM Adds weight to landside surface. Abuts the levee. Slopes away from levee. SOIL FILL IN LOW SPOTS Raises land surface. Used to fill in ditches, borrow pits etc. May not abut the levee.

Scale: None Drawn by: LS Date: March 16, 2011 AMEC File No WOOD RIVER PLANS AND CROSS SECTIONS T-TYPE RELIEF WELLS Water flows from the relief well to a collector pipe below ground. Collector connects several relief wells D-TYPE RELIEF WELLS Water flows directly from the relief well.

Permitting Certification of levees owned or improved by the Corps Weather Financial markets Costs

Les Sterman