FD support status N.Geffroy, G.Gaillard, B.Bolzon, A.Jeremie (and discussion with T.Kume)

Slides:



Advertisements
Similar presentations
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
Advertisements

Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
S-band BPM prime Support Hyoung Suk Kim KNU.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
1 A.Jeremie LAViSta: Laboratories in Annecy working on Vibration Stabilization Reflections on stabilization table B.Bolzon, F.Cadoux, N.Geffroy, A.Jeremie,
Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
Threads and Fasteners.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
J-FRM-0101 Revision with Reason No.DateInitials Drawing No. D’Vinyl Inc. Descriptive Part Name Designed byChecked by Engineer Drawing Type Foot Plate Date.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
dsdfsa Zoomed in view… Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
A.Jeremie LAViSta: Laboratories in Annecy working on Vibration Stabilization Some information on the Stacis 2000 Table from CERN, currently in Annecy B.Bolzon,
Supports and Movers for ATF2 Magnets R. Sugahara KEK France and Japan Collaboration Meeting Feb , 2006.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
Structural Drafting Connection Details and Gages.
BPM support and beam pipe length FD support status A.Jeremie.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
Lower Structure Revised Catcher. Catcher Mechanism The lever arm is adjusted so that the clamp is at its full height above the mass. An Allen key is.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
1 Photogrammetry of TT7. 2 Front view Distribution of all targets All the plots are in the magnet reference system.
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
ATF2 Magnets ATF2 Magnets 7 Oct 08,ATF2 weekly meeting Cherrill Spencer Report ATF2 FD Quads: Mech Msts 1 Report on the mechanical measurements of ATF2.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
1 Polarimeter build up and details Robert Lee. 2 View 1 Material (Removable plate, leg supports and rail guide spacer): Aluminum Leg supports attached.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
ATF2 weekly meeting 4 July 2007 MONALISA: Attachment of Vacuum Vessels for ATF2 David Urner.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Meeting December Andrea JEREMIE1 France/ATF2 kick-off meeting in Annecy October participants from 3 regions! LAPP/Annecy in.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
Drawing of bolt and nut.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
Warm Vessel Leveling Islands (Piers)
S-BPM Support Issues to be discussed with LAPP and KNU
Annex 4 - Moving Frame and Whiffletree assembly
Summary FD Support System
Escalator Installation
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
ATF2: final doublet support
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy
Mounting a BalanceBox®650 to a brick wall
BASEPLATES SLIDE SHOW.
FD supports A.Jeremie.
McMaster linear bearing #6709K180 with guide rail suppressed
Break down Lance rack Cut one of each of these for each rack
IP configuration session
Valve stem “gag” mechanism
Presentation transcript:

FD support status N.Geffroy, G.Gaillard, B.Bolzon, A.Jeremie (and discussion with T.Kume)

SBPM QC3 SBPM FFTB 2.13 S3.00 SF1FFQF1FF MS2FF MS From Marc Woodley’s presentation on July 18 SBPM QC3 SBPM FFTB 2.13 S3.00 SD0FFQD0FF S-band BPM outside table on a “light” Sextupole=> how will the S-band BPM be supported? Sweeping Honda Shintake

SBPM QC3 SBPM FFTB 2.13 S3.00 SF1FFQF1FF MS2FF MS From Marc Woodley’s presentation on July 18 SBPM QC3 SBPM FFTB 2.13 S3.00 SD0FFQD0FF S-band BPM outside table on a “light” Sextupole=> how will the S-band BPM be supported? Sweeping Honda Shintake

How to attach the table to the floor TMC table Concrete polymer? Flat steel plate Bolt plate to floor Floor

Current QD0 configuration 610mm 50mm beam 1200mm T-plate 300mm (from Ghyslain’s drawing) 260mm Height to compensate! 30mm Idea for 260mm support is to have a bottom plate clamped to the bloc with some possibility of adjusting the position with big screws

QC3

Even if we don’t have the magnets yet, we can see that the magnet is at the same position as the “front” cam motor (without the winding)

Solid Wire Sextupoles 11/27/07 For the FD we will use 2 solid wire conductor sextupoles with 2.13” bore. These magnets have a position adjuster attached to the yoke. These magnets are located at KEK and will be shipped to Annecy. The magnet/adjuster assembly would be bolted to the sextupole mover v-block stage. To do this, new holes must be drilled and tapped in the v-block stage to match the position adjuster base plate. Already adjustable: our support will not need to be adjustable?

Solid Wire Sextupoles 11/27/07 Summary of important dimensions: Sextupole Core: height to magnetic center = 8.819”/2 = 4.410” or mm Position Adjuster: nominal height as seen in previous slide = 4.17” or mm approximate minimum height = 3.42” or 86.87mm maximum height = depends on bolt length, should keep at nominal or lower Sextupole Mover: height from bottom of T-plate to top v-block stage = ~ ” or ~ mm (measurement taken from mover in Justin May’s office, may have different dimensions from movers at Annecy) NOTE!!! Because this configuration is newly conceived, no assembly drawings exist which depict the dimensions of magnetic center referenced from bottom of mover T-plate. We need this dimension for support design