The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

Slides:



Advertisements
Similar presentations
FAIR accelerator R&D Oliver Kester GSI Helmholtzzentrum für Schwerionenforschung Darmstadt and IAP Goethe-Universität Frankfurt.
Advertisements

ISIS Accelerator Division
L. Groening, Simulation of Experiments on Transverse rms-Emittance Growth Along an Alvarez DTL L. Groening, W. Barth, W. Bayer, G. Clemente, L. Dahl, P.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
HIAT 2009, 9 th June, Venice 1 DESIGN STUDY OF MEDICAL CYCLOTRON SCENT300 Mario Maggiore on behalf of R&D Accelerator team Laboratori Nazionali del Sud.
100 MeV- 1 GeV Proton Synchrotron for Indian Spallation Neutron Source Gurnam Singh Beam Dynamics Section CAT, Indore CAT-KEK-Sokendai School on Spallation.
Beam Dynamics Layout of the FAIR Proton Injector Gianluigi Clemente, Lars Groening GSI, Darmstadt, Germany Urlich Ratzinger, R.Tiede, H.Podlech University.
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, SIS 18-6 Charge Separator W.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
Peter Spiller, GSI, ICFA workshop, Optimization of SIS100 Lattice and Dedicated Collimation System P. Spiller, GSI ICFA 2004 Bensheim
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
Concept Preliminary Estimations A. Kolomiets Charge to mass ratio1/61/8 Input energy (MeV/u) Output energy (MeV/u)2.5(3.5) Beam.
THE MAFF IH-RFQ TEST STAND AT THE IAP FRANKFURT A. Bechtold, J. Fischbach, D. Habs, O. Kester, M. Pasini, U. Ratzinger, J. Rehberg, M. Reichwein, A. Schempp,
GSI Helmholtzzentrum für Schwerionenforschung GmbH Injector Upgrade for FAIR W. Barth W. Barth, Injector Upgrade for FAIR, ICST, Worms/Germany.
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
GSI Helmholtzzentrum für Schwerionenforschung GmbH UNILAC: Review follow-up and upgrade plans W. Barth.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
W. Barth, 8th FAIR Machine Advisory Committee, REPORTS BY NEW PROJECT DIVISION HEADS: “LINAC& Operations” organisation issues tasks and.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Preparation Phase of the FAIR Project
SC Activities at IAP Frankfurt
NICA injection complex status
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Status of HESR 18th March Gießen Dieter Prasuhn.
UNILAC requirements for BIOPHYSICS research
A. Martynov on behalf of accelerator division.
Progress in the Multi-Ion Injector Linac Design
Injector Cyclotron for a Medical FFAG
Beam-beam effects in eRHIC and MeRHIC
Physics design on Injector-1 RFQ
Large Booster and Collider Ring
EffiCAS Efficient Facility for Ions at CAS
FFAG Accelerator Proton Driver for Neutrino Factory
LHC (SSC) Byung Yunn CASA.
Pulsed Ion Linac for EIC
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
MEBT1&2 design study for C-ADS
Physics Design on Injector I
ICAP 2006, Chamonix Mont-Blanc
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
Status of the JLEIC Injector Linac Design
JLEIC 200 GeV Ion Injector Chain and Bunch Formation
Multi-Ion Injector Linac Design – Progress Summary
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Some Thoughts on the JLEIC Ion Injector
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User: 1100/yr (~1000 from outside) Member of Helmholtz Community The GSI UNILAC Upgrade Program for FAIR Requirements

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Unilac SIS18 ESR Present accelerators UNILAC: Universal Linear Accelerator, 12.5 MeV/u SIS: Heavy Ion Synchrotron, 1-2 GeV/u ESR: Experimental Storage Ring Accelerated Ions: p to U

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Primary beams /s; GeV/u; 238 U /s 238 U fold intensities 4x10 13 /s 30 GeV Protons Sekundary beams wide range of radioactive beams up to GeV/u; intensity gain of factor Antiprotons GeV Cooled beams Fast ramped super conducting magnets Key technologies Storage and cooler rings Radioactive beams e – A(RIB) Collider stored and cooled GeV pbars SIS100/SIS300 HESR NESR CR SIS18 FAIR Beam Data UNILAC SFRS p-linac ESR

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, FAIR beam intensity and beam quality requirements SIS space charge limit is reached by four 100 µs injections with each fifteen Multiturns. Uranium reference beam intensities:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, High Current InjectorAlvarezSingle Gap Resonators The UNILAC 11.4 MeV/u 1.4 MeV/u

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Example of three beam pulse-to-pulse operation

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Transverse emittance growth along the UNILAC

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Space charge forces along the UNILAC Calculated by PARMILA and PARMTRA codes

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, MUCIS & MEVVA- Ion Sources MUCIS (Multi Cusp Ion Source) (Emission Current Density  150 mA/cm²) MEVVA (MEtal Vacuum Vapor Arc Ion Source) (Emission Current Density  150 mA/cm²)

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Status of Uranium intensity in 2003

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Unilac measures since 2003 Improvement of the Mevva high current ion source RFQ-Upgrade: exchange of RFQ minivanes, modified IRM Increased stripper gas density Matching to the Alvarez DTL under space charge conditions Increase of Alvarez DTL transverse phase advance High current beam diagnostics, measurement of long. emittance Machine investigations: frontend, Alvarez matching, transfer line long. and transv. emittance measurements New charge state separator in the transfer channel to SIS18 for U73+

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, RFQ-Upgrade: Modified Input Radial Matcher Matching 1999 Matching 2004

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, LEBT emittance measurements with U 4+ beam of 8 emA horizontal vertical Emittance Growth: -19 % (3 %) Transmission: 70 % (84 %) before Quadrupole Quartet 2006: Mevva ion source: 37 emA of U 4+ and 18 emA of U 3+ beam

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, RFQ-upgrade: new RFQ-rods in 2004 After 5 years of operation New RFQ-rods After copper- plating February 2003 Input rf-Power [kW] December 2001 Commissioning 1999 rf-voltage [V] Two reasons: improved input matching (Stepan Yaramishev) high power consumption, dark currents

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, HSI RFQ commissioning (7/2004)

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, GSI Nitrogen gas stripper section at 1.4 MeV/u

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Increase of pressure and pumping capacity Hugh roots pump and four 1,000 l/s turbo pumps 50 % gas density increase approx. 1 µg/cm 2 gas density 4,500 mbar at nozzle 50 % enlarged beam aperture

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Charge state spectrum of an Uranium beam 14 % of particles within charge state 28+

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Alvarez-Matching Periodicity FDDF, interrupted by the intertank sections Emittance Measurement before DTL, 3.5  emA U 28+ Betafunction (before Matching) Betafunction (afterMatching) Alvarez DTL-Transmission: 92  % (before) 99  %. (after)

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Experimental Set-up for Alvarez DTL matching set beam current to 7.1 mA of 40 Ar 10+ (equiv. to FAIR design of 15 mA of 238 U 28+ ) measure hor., ver. emittance and long. rms-bunch length at DTL entrance set DTL transverse phase advance to values from 35° to 90° tune depression varied from 21% (90°) to 43% (35°) measure transmission, hor., and ver. rms-emittance at DTL exit rms-bunch length measurement

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Transverse emittance growth in Alvarez DTL 40 Ar 10+ beam, 7.1 emA, equivalent to 15 emA U 28+ beam

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, The achieved ratio current / rms-emittance at DTL exit is too low for FAIR Design: 15.5 mA / 0.25 µm; Achieved: 4.4 mA / 0.43 µm One measure of improvement → reduction of emittance growth along DTL Exp. and simulation: possible by increasing DTL quad strengths 7.1 mA 40 Ar 10+ ≙ 15.5 mA 238 U 27+ meas. transv. DTL exit todays PS current limit New Power Supplies for the Alvarez dc-Magnets

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Present Uranium beam intensity

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Normalized emittances along the UNILAC

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Front-end upgrade ( ) Test bench for the investigation of high current ion sources and acceleration gap. Optimization of extraction and gap geometry for highest beam brilliance. New RFQ minivane design for enlarged acceptance and higher beam brilliance. Dedicated high intensity beam LEBT (Compact LEBT) to transport 37 emA of U4+ beam into the RFQ.

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Old and new design of RFQ minivanes New Design Existing Design Voltage, kV Average radius, cm Electrode width, cm Maximum field, kV/cm Modulation Synch. Phase, degree -90 to to -34 Aperture, cm Min. transverse phase advance, rad Norm. transverse acceptance, cm mrad Output energy, MeV/u Electrode length, mm Designed by Andrej Kolomiets

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Advantages of new RFQ minivanes Higher transverse acceptance and phase advance New input radial matcher design  improved beam matching Improved beam dynamics for gentle buncher, optimized for rapid and uniform separatrix filling Resonant frequency shift with increased average radius and reduced electrode thickness can easily be compensated Beam dynamics studied with DYNAMION& PARMTEQ-M Beam intensity at HSI-RFQ output (18 mA of U 4+ ions) meets the FAIR requirement

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Compact LEBT HSI-LEBT Pre investigations - High current test bench measurements Upgrade I - Switching magnet with increased aperture - Quadrupole quartet with increased apertures (proper matching to the RFQ) Upgrade II (Compact LEBT) - sc solenoids for straight line injection of 37 emA of U4+ beam into the RFQ

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Summary An extended upgrade program at the UNILAC resulted in a Uranium beam intensity of up to 5.7 emA (28+) for the injection into the synchrotron SIS  18. High current UNILAC-upgrade measures: improved ion source performance, increase of stripper gas density, improved Alvarez-DTL-matching, increased phase advance in the DTL, compact charge state separator behind the foil stripper. The UNILAC-upgrade will be continued with a new front end comprising a compact LEBT, a new RFQ minivane design, and beam diagnostics devices, sufficient for the operation with megawatt heavy ion beams (until 2011). Thus the FAIR requirements will be approached. BUT: The UNILAC is in operation since 35 years. In long term perspective the substitution of the Alvarez DTL by more efficient high current heavy ion accelerators for low frequent beam pulses for FAIR injection is necessary. AND: The UNILAC experimental program should be decoupled from the FAIR injection linac by a new independent sc cw-linac up to 7.5 MeV/u.

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Longterm plans for Alvarez DTL substitution SIS 100

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, New cw linac up to 7.5 MeV/u 1.4 MeV/u7.3 MeV/u

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Prototyp of a sc CH-cavity CH-prototype cavity, 19 cells, IAP University of Frankfurt 1.4 MeV/u 7.3 MeV/u

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, New charge state separator behind foil stripper Beam Energy 11.4 MeV/u

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Beam dynamics

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Foil stripping modes high current beam no stripping low current beam quadrupole foil deposit

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Commissioning with Uranium beam horizontal vertical Uranium charge states

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Carbon foils 200 – 600 µg/cm 2

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Fish eye view of the charge state separator

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, co-workers Winfried Barth Gianluigi Clemente Peter Gerhard Lars Groening Michael Kaiser Michael Maier Sascha Mickat Anna Orzhekhovskaya Bernhard Schlitt Hartmut Vormann Stepan Yaramishev Ludwig Dahl LINAC group of the GSI accelerator division: