Cleaning of the Optical Block, Critical Orifice, and Focusing Nozzle of the Brechtel Model 1710 Mixing CPC.

Slides:



Advertisements
Similar presentations
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Advertisements

CHAPTER 45 Engine Lubrication.
Equipment for Assembly Fluke Multimeter 115 True RMS Glue Ring Jig Flathead screwdriver 60 Watt desk lamp HIOS Cl 4000 Electric screw driver Anti-static.
1 Stripe 400/600 Removing and Installing Printhead Printhead Resistance Calibration Toggle Position Adjustment.
H.E. Anderson Company Maintenance Tip How to Replace a Chemical Side Diaphragm This presentation will show you how to change a chemical side diaphragm.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Servicing Welch DRYFAST ULTRA Pump Models 2032
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Essential reading: SPINČIĆ, A., PRITCHARD, B, An English Textbook For Marine Engineers 2, Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička.
TSI Nephelometer Zero Filter Assembly Zero filter valve Zero filter Zero filter motor Metal flange.
Optical Manufacturing Solutions 1 Probe Assembly.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Volvo 270 Outdrive R&R (for bellows replacement)
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Ion source maintenance on the MAT 253
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Removal of Radiance Neph Disable the humidifier power remove water reservoir at top of neph disconnect power, computer and sensor cables disconnect and.
Marine Oily Handling Devices and Pollution Prevention Chapter 5 Lesson 1 Alfa – Laval Separator (II)
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Drug Delivery & Tissue Engineering Laboratory
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
CARBURETED FUEL SYSTEM
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
L H H L L H Pitot tube High pressure flow Low pressure flow Pressure transmitter Magnehelic vacuum gauge Pitot tube tip Pitot tube schematic Air flow.
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
Showing Demonstrations on the TV How to connect the camera to our TV set.
Replacing board in CLAP Tools: Flashlight (torch for those of you in Cape Town)) small philips screwdriver spacer tool* dish to hold screws 2 rolls of.
Title: Corvette C5 Column Lock Bypass Originator: John Neese Date: 30 Jan 2005 Revision: Sheet: 1 of 6 Column Lock Bypass.
Chapter Five Maintaining a Computer Part I: Cleaning a Computer.
Installation. Indoor Unit Installation Typical Installation.
Water Supply Skill Drills.
Cutting and Swaging Tubing
© 2007 Cisco Systems, Inc. All rights reserved.Cisco PublicNew CCNA Jianxin Tang IT 1 V4.0 Ch3. Computer Assembly—Step by Step.
PC Systems Building System Components Installation Procedures Sample PowerPoint Presentation.
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Focusing Lighting Instruments THE107. Focusing Lights This presentation will walk you through the basic steps of focusing a theatrical lighting instrument.
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Module 10-1 (a) Manual Gun Cleaning Processes n Manual equipment cleaning generates large quantity of wastes if not done properly. n Solvent is exposed.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
Opening Nephelometer to Remove Light Trap Column 1) Remove the 3 screws that attach the neph body to the flange 2) Loosen this nut 3) Slide flange away.
Cleaning Critical Orifice and Focusing Nozzle
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
1. 2 TS 50/100 Tape Splicer SMD Parts Counters Tape Splicers Vision Verification Tape & Reel Supplies Manual SMD Taping Machines Automated Pick & Place.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
Shaft Replacement Standard Operating Procedure
Copyright © 2016 by The S.E.A. Group
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
14 Refrigerant Recovery, Recycling, and Recharging.
Bilge Pump Service Project Model Service Kit
Most Effective Procedures to Repair a Brake Booster.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
1/17/2019.
Reader Swap out Guide.
Fin & Countertop Sample Kit Instructions
C400, C400N, C400Z 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
Metalwork Threading.
Presentation transcript:

Cleaning of the Optical Block, Critical Orifice, and Focusing Nozzle of the Brechtel Model 1710 Mixing CPC

Over time, the optical block and sample flow path of the Brechtel Model 1710 MCPC will need cleaning. This document shows how to do this. Symptoms of a dirty optical block and/or clogged sample flow path can include low count rates, low sample and saturator flow rates, and oscillating flow rates. The oscillating flow rates are typically observed with an external flow monitoring or calibration device such as a BIOS or Gilibrator flow calibrator.

Step 1. Open MCPC Remove power connector from back panel! Disconnect the vacuum tube (or shut off vacuum pump) from the hose barb on the back panel Remove the 6 Allen head screws that secure the top part of the instrument cover Lay the top cover down to the side

Step 2. Gain access to the optics block Disconnect all cables that attach to the IC board that block removal of the optical block. This includes the small white ribbon cable. If they have not already been color coded, be careful to mark ones of similar size so that they go back on the same connectors. Disconnect the vacuum tube from the critical orifice (C.O.) hose barb on the side of the optics block

Step 3. Remove optics block from MCPC column Remove the 4 Allen head bolts holding the optics block to the column Carefully lift the optics block up so that the last 2-pin connector can be removed Then remove the optics block from the column and set it upside down to expose the focusing nozzle assembly. Be careful when working around the 2 small IC boards at either end of the optical block assembly.

Step 4. Locate the critical orifice and the focusing nozzle The focusing nozzle assembly is located at the bottom of the optics block. The optical block critical orifice is a small metal hose barb with a tiny hole in it.

Step 5. Clean the critical orifice The C.O. can be removed using a 1/4” wrench. Note that this procedure can be performed without removing the optical block from the column The C.O. should be cleaned using alcohol (ethanol, methanol, isopropanol, etc.) to dissolve any clogging deposit Stubborn clogs may need to be displaced by inserting a shaved wooden (not metal) probe or toothpick into the orifice and twisting it When finished the C.O. should be reinserted by hand-tightening the fitting into the block to avoid cross- threading. Final tightening is by using the 1/4” wrench.

Step 6. Remove the focusing nozzle and clean the optical block The focusing nozzle assembly is sealed using small o-rings. Note the position of these o-rings and make sure they are back in place after working on the unit Use a cotton swab wetted with alcohol and clean the central portion of the optics block. Don’t try to get out to the edges of the block… this could leave a deposit on the optical lenses. The main concern is to remove an aerosol deposit on the wall opposite the focusing nozzle. Use several cotton swabs until the last one comes out fairly clean.

Step 7. Clean the focusing nozzle Get a wooden toothpick, or some other small sliver of wood. This will be used to clean the focusing nozzle. It must be made of wood or another soft material because the nozzle can deform or enlarge (both undesirable), especially if a hard metal pin is used You may have to take a blade and shave some wood from the tip of the toothpick to make it slender enough to fit inside the nozzle Gently (!) turn the toothpick in your fingers so that it rotates within the focusing nozzle orifice. This will clean off any deposits that have accumulated on the edges of the hole Use alcohol to clean off and dissolve any debris that remains on the orifice

Step 8. Reassemble the unit Insert focusing nozzle assembly and C.O. (if not already replaced) back into optical block unit. Make sure o- rings are in place for the focusing nozzle assembly. Connect the small 2-pin connector on the underside of the block as this will be difficult to do later Seat the optical block assembly over the hole in the column and insert the 4 Allen bolts. Tighten alternately to ensure a good o-ring seal. Re-attach vacuum tubing to C.O., and reattach all electrical connectors to IC board

Step 9. Perform a flow check Cleaning the C.O. and focusing nozzle will most likely change the flow through the instrument. Use a flow calibrator (BIOS, Gilibrator, etc.) to check the flow rate. The volume flow into the sample inlet of the instrument should be approximately 0.36 (+/- 0.06) lpm, assuming a critical (i.e., ~0.5 x atmospheric pressure) vacuum is applied to the unit. The sample flow and saturator flow rates should match closely. A freshly cleaned instrument should show a sample flow rate of at least 0.3 lpm. The actual measured flow rate is used in the calculation of the particle concentration.