Automated Spray Patternator Kevin M. Agnew Greg Barber David Rubin Team 14.

Slides:



Advertisements
Similar presentations
Water Penetration Testing Device
Advertisements

Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
Essential reading: SPINČIĆ, A., PRITCHARD, B, An English Textbook For Marine Engineers 2, Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička.
Case-New Holland Steer-by-Wire Detailed Design. Today’s Agenda  Who is CNH?  Background  Project Goal  System Level Concept  Design Components 
Position Sensing Glove Barbara Tuday Nathan Schreppler Lauren McIlwain Michael Nolan Team 6:
when calibrating the sprayer
INTELLIGENT TOOLING Team Joseph StaleyJeffrey Roushey Glenn GardnerAndrew Graybill.
PRIME Antenna Inc. Antenna Test Team Adam Straubinger Alan Condino Thanh Hong Ronnie Berg Sam Gregorio.
January 22, Advanced Modular Sample System Richard E. Hughes.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Water Treatment Plant Reflections alum Flocculation Clear Well Sedimentation.
High Power Hg Target Conceptual Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Automated Spray Patternator. Team 14 Kevin Agnew Greg Barber Dave Rubin.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
Automated Spray Patternator
Water Treatment Plant Reflections S 1 Raw Water alum QT S 2 S 4 m 1 S 3 Flocculation Sedimentation p 1 S 5 Clearwell Clean Water S 1 S 1 Raw Water alum.
Automated Spray Patternator Kevin M. Agnew Greg Barber David Rubin Team 14.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Team 12 Amelia House Paul Jaffa Johanna Miller Brian Ortega.
GE Energy Silicon Wafer Measurement System Team 10 Olin Biddy Scott Johnson Chetwyn Jones Rob McCoy Tim Weber.
when calibrating the sprayer
when calibrating the sprayer
1/128 Method Of Calibration Calibrating Hand Sprayers And High Pressure Hand Guns Because a gallon = 128 ounces and the area to be sprayed is 1/128 of.
Replacing Your Spray Nozzle Biological and Agricultural Engineering Robert E. Wolf Extension Specialist Application Technology.
Classification of Instruments :
Unit 11: Calibrating Instruments
The Water Benders Final Presentations. Outline Introduction Project Description Motivation Problem Statement Objectives Customer Requirements Design Concepts.
MEDUSA Methane Engine Design for Unmanned Small Aircraft Test Readiness Review University of Colorado at Boulder 03/05/2015 Customer: Dr. Ryan Starkey.
Solar Sausage for Desalination Sponsor: FAMU-FSU College of Engineering Advisor: Dr. Michael Devine Dr. Shangchao Lin Group: Alexandra Filardo Joseph Hamel.
Volume. Volume Volume is the amount of space that an object takes up. Unlike LENGTH (1 dimension), or AREA (2 dimension), VOLUME is a 3 dimensional.
P14474: Hydrostatic Test Apparatus Jake Manley Anushka Kalicharan Mitchell Sedore Brian Benner Kyle Abbott.
SEMINAR ON “GASOLINE DIRECT INJECTION”
Athletic Field Marking Device Anthony Cortese, Ryan Crump, Matthew Lawler, Patrick Shaughnessy (Team Leader), John Sudia.
Mentors Workshop Pneumatic Sub-System Mark McLeod Team 358 Festo/Hauppauge H.S. F For I Inspiration and R Recognition of S Science and T Technology.
Epoxy Dispenser Machine Dispenser Part. Design Objectives 1. To increase the productivity 2. To improve the quality of products 3. To simplify human work.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
Team: James Mazza, Andre Berwin, Peter Dunning, Nathan Fulcher, Andrew Watson, Travis Bardsley, Anthony Parker April 5, 2013.
What is Fluid Power? Fluid power is energy transmitted and controlled by means of a pressurized fluid, either liquid or gas. The term fluid power applies.
The Problem The Problem
May 21st, 2012 Component Environmental Test Chamber Team Members Advisors Peter AdamThong Vo Dr. Robert Daasch - PSU Jeff HughesPhong Ngo Justin Riel -
SPRAY EQUIPMENT Basic Components and Operations. Purposes  Used to apply agricultural chemicals  Spray pressures range from near 0 to over 300 pounds.
CHAPTER 11 PNEUMATICS TRANSMISION
Lesson Using Pneumatic Systems. Interest Approach Can you explain how air makes a pneumatic hand tool work?
Sami Lottes Team Leader Electrical Engineer David Sawyer ElliottChief Engineer Mechanical Engineering Coty Winchell Mechanical Engineering Michael Ballow.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
DataMaster 3000 Data Acquisition and Control Software.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
P16680: AATech Universal Oil and Bag System Bryce Mowers Jessica Reed Maria King Nicole Anklam Philip Couturier Samantha Orlando.
Air Conditioning Experiment Department of Mechanical Engineering University of Delaware.
Nanofluidic Characterization David Sharp David West Justin Davis.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
P13631: Gravity Fed Flow Process Control Teaching Aid An RIT education couples theory in lecture with practical application in lab. In the past, carts.
Cecil Tharp MSU Pesticide Education Program Pesticide Education Specialist Department of Animal and Range Montana State University.
ELVIS Educational Laboratory Virtual Instrumentation Suite: Phase II Abstract Problem Statement The goal of this project is to convert the EE 201 labs.
Feasibility Analysis of a Two Phase Solar Thermal Water Heater Solar Thermal Solutions (M15) Project Supervisor: Dr. Y. Muzychka April 3 rd, 2014 Marcus.
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Virtual Lab on Automation Systems A Proposal under Mechatronics Laboratory Presented By Tanuja Sheorey PDPM IIITDM Jabalpur.
Unit 11: Calibrating Instruments
Turbomachinery Flow Visualization P08453
Forging new generations of engineers
Multidisciplinary Senior Design I: Problem Definition Review
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
ISO ASIS Automation & Fueling Systems A.Ş.
Forging new generations of engineers
Heart Pump and the Circulatory System P17080
Presentation transcript:

Automated Spray Patternator Kevin M. Agnew Greg Barber David Rubin Team 14

Design Concept Review BackgroundBackground Customers:Customers: –wants, constraints Mission StatementMission Statement Benchmarking:Benchmarking: –system –functional Metrics / Target Values Generated Concepts Concept Selection Budget –material and equipment –engineering hours

Background Spray nozzles are used to apply a fluid onto a surfaceSpray nozzles are used to apply a fluid onto a surface Each nozzle has a certain distribution patternEach nozzle has a certain distribution pattern Spray Nozzle Fluid

Background Spray patterns of adjacent nozzles overlapSpray patterns of adjacent nozzles overlap This overlap region can be used to provide a more uniform spray distributionThis overlap region can be used to provide a more uniform spray distribution A spray patternator allows the spray distribution to be observedA spray patternator allows the spray distribution to be observed Spray Nozzle Fluid

Project Information Customers :Customers : –Larry Gaultney –Ted Lang Dupont Agricultural Research Team –James Davis Mission StatementMission Statement –To develop and test an automatic spray patternator with high accuracy, improved resolution, a minimal amount of human error, test reset time, and allowing superior flexibility.

System Information VideoVideo System ComponentsSystem Components –nozzle –spray table –collection tubes Deficiencies of current DuPont Patternator:Deficiencies of current DuPont Patternator: –Low Accuracy - High Reset Times –Insufficient Resolution - Human Error –Limited To One Nozzle (insufficient size)

Prioritized Wants 1. Provide All Desired Outputs 2. Automated Data Collection System 3. Observe interaction of 2 or more Nozzles 4. Comply with Hardware/Software Standards 5. High Accuracy and Resolution 6. Run on Tap Water 7. Be able to test 110° nozzles 8. Modular Design 9. Accurately Locate Nozzle Position 10. Mobile within Lab

Constraints 54” Door Width54” Door Width Safety Guidelines - OSHASafety Guidelines - OSHA –Allowable Weight: 200 lbs./person (Max. Push/Pull Weight) Senior Design Project ScheduleSenior Design Project Schedule

System Benchmarks Current DuPont Spray PatternatorCurrent DuPont Spray Patternator Hardi Inc.Hardi Inc. –Field Patternator –Laboratory Patternator Transportable Spray PatternatorTransportable Spray Patternator –(Patent) Spray Systems Co.Spray Systems Co. –Laboratory Patternator Hardi Field Patternator

Functional Benchmarking Collection Software LabView Measure Image Pro Plus Fluid Supply Pressure Regulator Pressure Transducer Solenoid Valves Reservoir Data Collection Method Laser Imaging Flow Rate Float Level Sensor Water Sensitive Paper Table Design Current DuPont table design V-grooved table

Quality Metrics / Target Values

Initial Design Concepts Data Collection Design Function : To measure water distribution Level Detection (Using graduated cylinders)Level Detection (Using graduated cylinders) –Manual Reading –Pressure Sensors –Laser Imaging Flow DetectionFlow Detection –In-Line Flow Meters Image AcquisitionImage Acquisition –Filter Paper Flow Meter

Initial Design Concepts Table and Water Collection Design Function : To capture water being sprayed from nozzle and separate into measurable quantities 2-Dimensional Design2-Dimensional Design –V-Grooved Table Top –Square Channels (dividing walls) 3-Dimensional Design3-Dimensional Design –Flat Table (Filter Paper design) –Honeycomb

Initial Design Concepts Water Supply System ReservoirReservoir –Water Tank –Tap Pressure SystemPressure System –Water Pump –Air Pressure Source with Regulator Test Stop System –Solenoid Valves –Cylinder Covers Function: To supply pressurized water to the nozzles

Concept Selection Water Pressure SystemWater Pressure System –Pressure Pot air readily available pressure can be regulated –Solenoid Valves acts as automatic shut-off eliminates residual spray –Dial Pressure Gauge inexpensive simplifies design

Concept Selection Table/Frame Design:Table/Frame Design: –Square Channels With Aluminum Dividing Walls 2.5cm spacing of walls gives desired resolution low cost for HDPE table material narrower, square channels reduce splashing –2’ PVC Collection Tubes (0.602” ID) allows for the use of pressure sensors holds >100ml of fluid clear piping allows user to see fluid level –Aluminum C-Channel / Square Stock Provides structural support

Concept Selection Data Acquisition SystemData Acquisition System –Pressure Sensors (80) high accuracy (  0.5mL) relatively inexpensive ($17.45/ea.) allows for simpler design of water supply system

Concept Selection Collection SoftwareCollection Software –LabView compliant with DuPont software/hardware standards

Test Results Continuity/Sensor Integrity Checks: SatisfactoryContinuity/Sensor Integrity Checks: Satisfactory Calibration Check of Pressure Sensors: .5mlCalibration Check of Pressure Sensors: .5ml Collection Tube Leakage Test: No leakageCollection Tube Leakage Test: No leakage Software Operation: SatisfactorySoftware Operation: Satisfactory Pattern Check:SatisfactoryPattern Check:Satisfactory Test Reset Time:3 min (est)Test Reset Time:3 min (est) Water Supply System Operability:SatisfactoryWater Supply System Operability:Satisfactory

Budget Shop ExpensesShop Expenses –Time(40 man-hrs) –Materials Data Acquisition SystemData Acquisition System –National Instruments hardware and software –Pressure Sensors Structural MaterialsStructural Materials –aluminum C-channel/square stock –HDPE sheet Water SystemWater System –Reservoir –Regulator/Gauges –Solenoids Valves –Tubing $2, $2, $10, $10, $ $ $ $ Total = $15,759.18

Team Engineering Hours

Summary Final DesignFinal Design –80 graduated cylinders w/pressure sensors –Square collection channels –Pressure pot water supply w/solenoid valves –LabView for data acquisition Total CostTotal Cost –$15, Remaining TasksRemaining Tasks –Attach remaining components to frame –Test reset time

Question and Answer