Feedwater System Reliability Users Group 2015 Meeting San Antonio James Alston – South Texas Project Rob Frazee – South Texas Project Frank Todd – True.

Slides:



Advertisements
Similar presentations
OFF DESIGN PERFORMANCE PREDICTION OF STEAM TURBINES
Advertisements

DIFFERNETIAL PRESSURE FLOWMETERS
Introduction to Plasma-Surface Interactions Lecture 6 Divertors.
Optimization of Cutter Life DSES 6070 HV5 Professor Gutierrez-Miravete By: Frank Gibilisco.
Test to Failure of 3/8-Inch Tube Ferrule Connections in an Effort to Determine the Shear Strength of a Varying Number of Threads Engaged P.O. Box
So Far: Conservation of Mass and Energy Pressure Drop in Pipes Flow Measurement Instruments Flow Control (Valves) Types of Pumps and Pump Sizing This Week:
Cogeneration. Is the simultaneous production of electrical and thermal energy from a single fuel source.
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
Walter G Bischoff Brunswick station Duke Energy
ENGINEERING PROJECT PROPOSAL MASTER OF ENGINEERING IN MECHANICAL ENGINEERING DAN FLAHIVE Analytical Method to Predict Primary Side Steam Generator Pressure.
Steve Lefler - Principal Engineer Duke Energy
Flow Measurement M. Shahini.
Chapter Five Flow Measurement
Flow Sensors.
Free PowerPoint Backgrounds Heat Rate Improvement Conference February 5-7, 2013 Scottsdale, Arizona.
This tutorial is a PowerPoint ® file which includes recorded narration. Automatic slide sequencing is coupled to the sound track. For the most effective.
ME 322: Instrumentation Lecture 12
Week 1 Unit Conversions Mass and Volume Flow Ideal Gas Newtonian Fluids, Reynolds No. Week 2 Pressure Loss in Pipe Flow Pressure Loss Examples Flow Measurement.
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
Practical Aspects of using Pitot Tube
INTEGRATION OF ARTIFICIAL INTELLIGENCE SYSTEMS FOR NUCLEAR POWER PLANT SURVEILLANCE AND DIAGNOSTICS 2.
Pressure Vessels.
Week 1 Unit Conversions Conservation of Mass Ideal Gas Newtonian Fluids, Reynolds No. Pressure Loss in Pipe Flow Week 2 Pressure Loss Examples Flow Measurement.
Quantifying Cycle Isolation Losses and Integration with On Line Systems Feedwater System Reliability Users Group 2015 Meeting San Antonio Ken Porter Rich.
Wedge Flow Element 1.
FSRUG Presentation – January 2014 Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 3 Reactor Feed Water (FW) Clean Up Piping Break.
Instrument Training Material
R. Shanthini 05 Feb Whole System Design: An integrated Approach to Sustainable Engineering Units 6 – 10: Worked Examples July 2007 Citation: Stasinopoulos,
Shrinkage Forum Monday 27 June 2011, 31 Homer Road.
Measurement of flowing fluids
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Chanyoung Park Raphael T. Haftka Paper Helicopter Project.
Flow Measurement and Control. Orifice Meter The orifice meter consists of an accurately machined and drilled plate concentrically mounted between two.
Thermal Model of MEMS Thruster Apurva Varia Propulsion Branch Code 597.
EXAMPLE FEP REPORT – Flow Erosion Assessment Program Investigation Report – May 2009 EIMAGING POWER GENERATION.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
Sizing Variable Flow Piping – An Opportunity for Reducing Energy
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
An-Najah National University Engineering College Civil Engineering Department Project title : Management of stormwater for a portion of Faisal street “Nablus”
Flow measurement.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Chapter 10 Vapor and Combined Power Cycles Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 7th edition by Yunus.
Heat Transfer Equations. Fouling Layers of dirt, particles, biological growth, etc. effect resistance to heat transfer We cannot predict fouling factors.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
1 BYU Deposition Facility Previous Turbine Accelerated Deposition Facility (TADF) Design Parameters to match: temp, velocity, angle, materials, particle.
GOVERNMENT ENGINEERING COLLEGE, BHARUCH (014) Chemical Engineering department SEM-iii Sub: fluid flow operation topic: orifice meter & rotAmeter Guid by:
Unsteady Wetness Effects in LP Steam Turbines Kane Chandler, Alex White and John Young Hopkinson Laboratory Cambridge University Engineering Department.
Welcome! Drafting 2323: Pipe Drafting Andrew Amini Full Time Instructor, HCC.
aNamePEN no 1.Harsh Patel Prince Patel Ronak Trivedi Yusuf Khan Guided by: M. M. Chhatbar Subject:
CFD Simulation Investigation of Natural Gas Components through a Drilling Pipe RASEL A SULTAN HOUSSEMEDDINE LEULMI.
VENTURIMETER Department of Chemical Engineering
UNDERSTANDING DIFFERENT
A Seminar on STEAM FLOW METER PRESENTED BY:- GHANSHYAM PRAKASH INSTRUMENTATION E.CODE:
INTRODUCTION TO ELECTRONIC INSTRUMENTATION
Fluid Statics/Dynamics
Sensors and Detectors - 1
超臨界CO2在增強型地熱系統儲集層中取熱之研究-子計畫三 CO2在增強型地熱系統取熱模型之建構及效能分析
Internal Incompressible
Measurement of discharge
Piyush Modi Assist.Prof
Flow Through a Pipe Elbow (Comsol)
Content Development of the second generation Power2 Case studies
Chapter 4. Analysis of Flows in Pipes
Bernoulli’s Equation (Mechanical Energy Balance)
S. Ghosh, M. Muste, M. Marquardt, F. Stern
A RESERVOIR MANAGEMENT REVOLUTION
Estimation of Profile Losses
Welcome! Drafting 2323: Pipe Drafting
LDZ System Charges – Structure Methodology 26 July 2010
Bernoulli’s Equation (Mechanical Energy Balance)
Presentation transcript:

Feedwater System Reliability Users Group 2015 Meeting San Antonio James Alston – South Texas Project Rob Frazee – South Texas Project Frank Todd – True North Consulting, LLC Ken Porter – True North Consulting, LLC STP Feedwater Pipe Erosion and Nozzle Replacement Options

Feedwater Pipe Erosion Discovery of Pipe Wall Thinning Erosion of the main feedwater piping in the area of the CrossFlow Transducers Discovered in December 2013 LER submitted January 2014 For Overpower Event – Withdrawn After Evaluation Compensatory Actions Revised pipe wall thickness values inserted in flow computer Compensate for change in flow area Mitigate any possible overpower condition

Feedwater Pipe Erosion Assumption ◦ Erosion Occurred Slowly Over Time ◦ Any Power Change Would Also Occur Over Time Methodology Analysis Would Have To Include Data From Multiple Cycles To Pick-up Suspected Change In Indicated RX Power

Feedwater Pipe Erosion Three Evaluation Methods Chosen ◦ MW Output Vs CW Temperature (Multiple Cycles)  Assumes Steady Operation From Cycle To Cycle  Assumes No Other Significant TP Events ◦ True North Power Predictor  Utilizes A “Best Estimate Statistical Analysis” Method  Assumes Valid Baseline Data Is Available ◦ Analysis Of HP Turbine Parameters Over Time  Assumes Good Operation

Feedwater Pipe Erosion Unit 1 – MW Output Vs CW Temperature Chart

Feedwater Pipe Erosion Significant Issues In Unit 1 Data Data Not Available Prior To Cycle 12 Cycles Combined (Prior To LP Turbine Retrofit) Cycle 15 Data Split To Show Impact of Extraction Steam Bellows Failure Cycle 17 Data A Clear Outlier ◦ Problem With MW Transducer During Cycle Cycle 18 Htr 15c Extraction Line Issue Cycle 18 Significant Reduction In Plant Output When New Pipe Wall Thickness Value Inserted In January 2014

Feedwater Pipe Erosion Unit 2 – MW Output Vs CW Temperature Chart

Feedwater Pipe Erosion Significant Issues In Unit 2 Data Data Not Available Prior To Cycle 10 Cycles Combined (Prior To LP Turbine Retrofit) Cycle 14 Data Split To Show Impact of Extraction Steam Bellows Failure Cycle 17 Significant Reduction In Plant Output When New Pipe Wall Thickness Value Inserted

Feedwater Pipe Erosion Unit 1– Predicted RX Power Vs Time

Feedwater Pipe Erosion Unit 2– Predicted RX Power Vs Time

Feedwater Pipe Erosion PAA (Polyacrylic Acid) Injection Evaluation ◦ Unit 1 Began Injection In Cycle 16 (Dec. 2010) ◦ Unit 2 Began Injection In Cycle 15 (Feb 2011) No Evidence That PAA Injection Caused A Change In Flow Measurement

Feedwater Pipe Erosion Unit 1 Plant Parameter Evaluation

Feedwater Pipe Erosion Unit 2 Plant Parameter Evaluation

Feedwater Pipe Erosion Unit 1 Average Calculated CrossFlow CF Vs Time Unit 2 Average Calculated CrossFlow CF Vs Time

Feedwater Pipe Erosion 15

Feedwater Pipe Erosion Conclusions No Overpower Event Despite Erosion Suspect Change In Pipe Wall Roughness Resulted In Flow Profile Change

Flow Nozzle Replacement Original Meter Design ◦ Nom. pipe size = in. ◦ Pipe I.D. = in. ◦ Nozzle throat I.D. = in. ◦ Ref. Temp. = 68 Deg. F ◦ Carbon steel pipe ◦ Stainless steel nozzle and downstream portion of recovery cone ◦ Carbon steel end of recovery cone ◦ Angle of divergence of recovery cone (from centerline) = 6 Deg. 30 Min. ◦ Three tap sets, 120 Deg. apart. ◦ Upstream taps have stainless steel tube inserts with 0.25” I.D. ◦ Throat taps are 0.25” I.D. and connected to outside pipe taps by internal tubing. 17

Flow Nozzle Replacement Original Meter Design 18

Flow Nozzle Replacement Modified for inspection port and flanges 19

Flow Nozzle Replacement Difficult Access 20 Piping plan view of the area around the feedwater flow nozzles. The feedwater flow nozzles are wedged in below some larger piping. Part of the meter runs are also located above the diesel generating room.

Flow Nozzle Replacement Sample Isometric of Flow Nozzle 21

Nozzle Error Modes 22 Upstream fouling or erosion – roughness & diameter effects Upstream erosion around tap Leaking throat tap Nozzle fouling– roughness effects Drain hole erosion Failure of nozzle attachment point Throat Tap irregularities

Flow Nozzle Replacement Upstream Tap Condition – Possible Effects 23 Possible higher pressure measurement on the upstream tap due to pipe diameter change and localized turbulence could result in a higher dp measurement at a given flow rate. Plant data indicates that the overall effect was in the conservative direction.

Flow Nozzle Replacement Flow Comparison 24

Flow Nozzle Replacement Flow Comparison 25

Feedwater Nozzle Replacement Proposed Design Options ◦ Removable PTC 6 Nozzle/Recovery Cone Insert ◦ Welded-in Flow Nozzle/Recovery Cone Meter Tube ◦ Flanged Low Head Loss Nozzle Meter Tube Other Options Considered ◦ Universal Venturi Tube ◦ ASME Classical Venturi ◦ High Head Recovery Meter Tube 26

Feedwater Nozzle Replacement Proposed Design- Removable PTC 6 Nozzle/Recovery Cone Insert 27

Feedwater Nozzle Replacement ◦ Welded-in Flow Nozzle/Recovery Cone Meter Tube or Flanged Low Head Loss Nozzle Meter Tube (similar design but shorter length) 28

Feedwater Nozzle Replacement 29 DesignCostUncertainty Removable PTC 6 Nozzle/Recovery Cone K plus calibration 0.2% to 0.3% (meets almost all ASME Specs) Welded-in Flow Nozzle/Recovery Cone180K plus calibration 0.2% to 0.3% (meets all ASME Specs) Low Head Loss Meter Tube94K plus calibration 0.5% (does not meet all ASME Specs)

Feedwater Nozzle Replacement 30 Selected Replacement Nozzle – Triad ASME PTC-6 LHL Flow Meter Tube