Pre-Fire Survey NAME HERE
Amidships Crane- 01 Qtr Deck Midships Zone: 3
Adjacent Spaces: FWD Fwd House: Damage Control Locker #1 C/M Office State Rooms Fan Room QTR Deck Office
Adjacent Spaces: Aft Aft House Medical Wardroom Sick Bay State Rooms Linen Locker Fan Room X-Ray room Medical Laundry Room
Adjacent Spaces: PT/STBD PT/STBD Sides Deck Lockers Cranes Lifeboats
Adjacent Spaces: Above Staterooms Open Space Fast rescue boats
Adjacent Spaces: Below Lower Class Mess Chill Rooms Purser’s Office Crane Electrical Panels, transformers, breakers
Fuel Loads: Class A: PFD’s Lifeboat lines and rescue boat covers Linen locker Mattresses, State room items, Personal effects Class B: Hydraulic fluid, Gasoline in rescue boats and power washer Diesel in Lifeboats #1, #2 Freon refrigerant gas Medical supplies Class C: Electrical circuitry in passage ways Crane electrical panel (Main deck) Class D: None Nearby *Other Hazards: Oxygen tanks in medical ward
Nearest Fire Stations Fire Stations F.S. #21:FWD House STRB Side (1 ½ inch adj. nozzle) F.S. #22:FWD House PT Side (1 ½ inch adj. nozzle) F.S. #23:Interior-Aft House PT Side (1 ½ inch adj. nozzle) F.S. #24: Interior-Aft House STRB Side (1 ½ inch adj. nozzle) F.S. #25:Aft House STRB Side (1 ½ inch adj. nozzle) F.S. #26:Aft House PT Side (1 ½ inch adj. nozzle) *All fire stations have a 50 ft. hose
Nearest Fire Extinguishers Powder (6)10 lb CO ₂ (2) 15 lb
Accessibility Primary Fire Stations Fire Stations 21 & 22 Secondary Fire Stations Fire Stations 25 & 26 Additional hoses may be used from interior Fire Stations 23 & 24
Size and Capacity
Shutoffs: Fuel Crane Shut Offs EOS Main Deck Electrical Panel Valve shut off at crane
Shutoffs: Ventilation
Shutoffs: Electrical Cargo Crane Electrical Shut Off
Drains Scuppers are located along the port and starboard sides (Main deck to 04)
Exposures 02 FWD House Electrical Locker Medical Wardroom & Exam Room 01 FWD House Deck Lockers
Divisions: Deck and Deckhead Fwd A-Class 0 Aft B-Class 0 Bulkhead Class: A Requirements: A-0 60 min test no passage of flame or smoke 3mm thick steel and suitably stiffened Bulkhead Class: B Requirements: A-0 60 min test no passage of flame or smoke 1.5 mm thick steel and suitably stiffened
Divisions: Doors B-Class Aft (15) A-Class Fwd (15)
Divisions: Bulkheads A-Class 0 Fwd B-Class 0 Aft Bulkhead Class: A Requirements: A-0 60 min test no passage of flame or smoke 3mm thick steel and suitably stiffened Bulkhead Class: B Requirements: A-0 60 min test no passage of flame or smoke 1.5 mm thick steel and suitably stiffened
Fire Systems Fixed Fire Suppression Systems N/A Fire Detection Systems Smoke Detectors: FWD and Aft passage ways and all rooms Heat Detectors: N/A
Mid Ships Crane Pre-Fire Survey