Optimization For Existing Tilting Pan Filters Metalcraft.

Slides:



Advertisements
Similar presentations
Combustion engines main principles and definitions
Advertisements

Facilities Capital Planning and Management A program management overview prepared for Ferndale School Districts Facilities Planning Committee.
PLATEPRO PHOTOPOLYMER PLATEPRO PHOTOPOLYMER Pre-wash The Photopolymer+CTP plate processor has an integrated Pre-heat and Pre-wash system. The plate processors.
1 Kraft Fuels LPG Products & Services Your Logo Here Franz Keiling An Overview about LPG Dispensers and Technology Franz Keiling An Overview about LPG.
Water Hydraulic Valves
Formula 1 Group Members: Quinn Collett Steve Godlewski Tobiah Halter Jeff Swanson Academic Advisor: Dr. Chien Wern June 4, 2003.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Important aspects to improve conveyor performance
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
Antunes Water Filtration Technologies Introduces to You:
Simple and Effective Work Roll Cooling Modification for Hot Mills
WP Inc: spray nozzle blues
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
I NNOVATIONS T ASK M ASTER III James E. Bowie, Jr., Ph.D., P.E. January, 2011 Delivering Experience, Quality and Service since 1934.
Environmentally Conscious Design & Manufacturing (ME592) Date: April 24, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 20: Remanufacturing.
Presentation on Pumps ByG.MURALIKRISHNA EE(E) BSNL ED-1.
Component Rebuilds John Richards Cashman Product Support Representative Lyle Kibbe Cashman Service Supervisor A Guided Tour Through Cashman Equipment.
The 30M2 Continuous Miner. Customer Name 30M2 Overview %Heavy duty high power miner for mid-height seams %High productivity from efficient cutting and.
NCDA: Pickle Sorter Concept Review Project Sponsored by Ed Kee of Keeman Produce, Lincoln, DE.
Senior Design: Validation of Design December 15, 2008.
Energy Management in a Resource – Starved Environment Channing Starke Director / Technical Services Advanced Air Filtration.
1 DTE Rail Services, Inc. Railcar Maintenance Management Seminar Wheel Sets and Wheel Shop Practices May 23, 2008 Greenbrier Rail Services.
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
Practical Energy Conservation Tips for Gas Turbine Propulsion Ships.
D-M-E Hot Runner Solutions D-M-E Hot Runner Capabilities.
Introduction to Equipment
Hawke’s Bay Refrigeration
F. A. S. T. F ACTORY A UTHORIZED S ERVICE T ECHNICIAN James E. Bowie, Jr., Ph.D., P.E. February, 2011 Delivering Experience, Quality and Service since.
Maintenance of Machine tools
THE HYDROFLOW STAR FILTER
OUR PASSION: Earthmoving & Mining Machines Plant Maintenance Fabrication Erection.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Hospitality Management. The Big Problem in Hospitality Poor task and event execution of corporate strategy costs – 2% – 5% of Annual Revenues Analysts.
Presentation on Preventive Maintenance
1 SHELL FLEET TECHNOLOGY TOUR August 29, VALUE DELIVERY THROUGH SERVICES OIL CONDITIONING MONITORING PROGRAM.
Houston Material Handling Society October 2008 Baghouse Cleaning Control Presented by: T.J. Winalski.
Montabert The Alternative Drifters replacement THE ALTERNATIVE
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
Presentation Title Presented by Joe Blow Top Applications.
LAYCO LAYCO EQUIPMENT BY YARGUS MANUFACTURING. LAYCO Equipment Available from LAYCO BLENDERS VOLUMETRIC BLEND SYSTEM TAPERED AUGER VERTICAL SINGLE-UNIT.
Unit 2, Genkai Nuclear Power Plant
Machine Elements in Mechanical Design Prepared by: Misrty Dipen
KSRTC CENTRAL WORKS PRESENTED BY GEORGE JOSE 8214.
Who is KME? Established in 1989, KME has been dedicated to providing the best service to our clients. We believe that quality and best value are crucial.
Mould Maintenance Presented By S.K Mandal.
F I L T R A T I O N SCHOONOVER, INC..
Optimum Pump Performance for Process Applications
LubeWatch® Oil Analysis Program
ANALYTICAL METHODS IN MAINTENANCE
Engineered Water Treatment Solutions
Parul Institute of Technology
Pilot Operated Pulse Valve Manufactured by maniks
Regen Media Filter & Filter Media Task Group Update
Manik’s Ammonia Desuperheater Used in Refrigeration
© Alfa Laval.
Blackmer Vane vs. Internal Gear.
Fans & Heaters technical seminar
Welcome! Drafting 2323: Pipe Drafting
POT WASHER PROJECT FOR MK WASH AREA
QPM delivers value over the life cycle of the product
POT WASHER PROJECT FOR MK WASH AREA
WP Inc.: Faulty Spray Nozzles
Engine Lubrication Systems
Newell Development HVAC Services and Preventative Maintenance Proposal
Presented by Mike Zacharias
CLASS® Compressible Liquid Adaptive Suspension System
We provide VEHICLE TRACKING SYSTEM location tracking services which enable businesses track & manage their resources in real-time. We at Tracking2u, help.
Fluid Power System Maintenance and Troubleshooting
Presentation transcript:

Optimization For Existing Tilting Pan Filters Metalcraft

2

Metalcraft – Located in Tampa Florida 3

Metalcraft Metalcraft Manufacturing 4

Metalcraft Services Filter Pans 5

Metalcraft Car Frame 6

Metalcraft Bearing Pedestals 7

Level Track 8

Metalcraft Services Installation of New Filter Components 9

Metalcraft Services 10

11

12

Optimization for Existing Tilting Pan Filters 13

Reliability / Mission Time RELIABILITY speaks of intended function over time. MISSION TIME is critical to maximize acid production 14

Filter Mission Times Maintenance turnaround to turnaround Down day to down day (PM the filter) Scheduled wash cycle to wash cycle Scheduled cloth change out to cloth change out 15

Wash Cycle to Wash Cycle Mission Times Acid production is critical Interval times are critical 16

Cloth Change Mission Times Acid production is critical Intervals - Most Critical 17

Filter Performance Optimization This is mechanical approach for existing tilting pan filters, offering increased mechanical reliability and increased recovery of P₂O₅. Results are, a reduction in maintenance costs and increased production dollars. 18

Objectives for Filter Optimization Increase acid production Minimize dilution Increase P₂O₅ recovery Lower maintenance costs / Increase mission times Improve cloth cleaning efficiencies 19

Filter Optimization Step 1 Initial operational and maintenance benchmarks established. A detailed study and mapping of the filter is completed. 20

All aspects of the filter and its parts are measured 21

Filter Optimization Step 2 Measured data is integrated into the modeling software. Study of the filter in the “as found” condition begins. 22

23

Filter Optimization Step 3 The filter is accurately modeled in its optimized condition. Demonstrates the recommended changes 24

Filter Optimization Step 4 Client report submittal, steps planned in harmony with client goals Report includes optimized proposal package. (How can Metalcraft best support changes the client would like to see?) 25

Filter Software Modeling – Design – Mapping Process 26

Components for Optimizing Existing Tilting Pan Filters Cloth spray headers Cam roller turnovers Enlargement of filtration area (pans) Filter valve timing 27

Cloth Spray Headers 28

Metalcraft Services Nozzle Placement and Spray Patterns are Critical for Cloth Spray Header Efficiencies 29

Cloth Spray Header Optimization Nozzle Design and Efficiency Conflicting Sprays Delivered Flow and Pressure to Header Loop Design with Cleanout 30

Nozzle Design and Geometry Vee Jet Flat Jet 31

s Address cleaning for all areas of the pan - Corners 32

Typical Cloth Spray Header Installation 33

Metalcraft Services Cam Turnover Sections 34

Cam Turnover Designed for accurate and simple field adjustment Assures proper operation 35

Metalcraft Services uses modeling software for both detailed design work and problem solving. 36

3 D Modeling Cloth Spray Evaluation 3 D Modeling 37

38

39

40

41

42

43

44

45

46

47

48

49

50

Increased Filtration Area 51

Increased Filtration Area Considering new pans for an existing filter? Build them with additional filtration area! 52

Filtration Area Increased to s/m Filtration Area Increased.46 s/m Per Pan 53

Optimization for the Central Valve Is the valve timed correctly? Is dilution being addressed? Are wash and feed boxes located correctly to maximize filter efficiency 54

Central Valve 55

Optimization of Central Valve Adjustment / Repair of compartment baffles Replace Seal and Wear Plates Machining of Poly Ring and Timing Crown surfaces in place 56

Metalcraft Services 57

MCS 4/2010Metalcraft Services of Tampa MCS 4/22/2010 Filter Performance Optimization Results 58

Tilting Pan Filter Project Success – Example 1 Production and Down Time Cost Savings Savings of $0.9 Million per Year Recovery of 3500 Tons of Phosphoric Acid Per Year Reduced Cloth Usage and Overtime Cloth Changes 59

Tilting PanFilter Project Success – Example 2 Production and Down Time Cost Savings Reduction of Filter Down Time Per Month Increase P₂O₅ Recovery Overall Filter Improvement Annual Savings - $2.2 Million Per Year 60

Other Filter Components for Optimization Car Frames Bearing Pedestals Level Tracks 61

Car Frames Heavy Duty T316L Stainless Steel Design integrated Wear Track – Minimal wear to bottom flange of the frame 62

Improved Joint Design For Car Frames 63

Car Frame Bull Gears Integral Bull Gear bolts directly to the frame 64

Filter Pans in Progress 65

Objectives for Filter Optimization Increased acid production Minimize dilution Increase P₂O₅ recovery Lower maintenance costs / Increased Mission Times Improved cloth cleaning efficiencies 66

METALCRAFT Leading with Vision 67