BEST PRACTICES 2014 BEST PRACTICES 2014. About P2S Established in 1985 as SERV-TECH a specialty contractor. Purchased by Phillip Service Corporation.

Slides:



Advertisements
Similar presentations
Over 50 Years of Regional Service and World-Class Quality United Air Conditioning is a client-focused, family-owned air conditioning company serving.
Advertisements

Fired And Unfired Pressure Vessels
Objective of equipment maintenance Objective of equipment maintenance Maintenance frequency Maintenance frequency Inspection and Testing Inspection.
Boiler making By Johannes Stefanus Petrus. History What Is A Boilermaker? Boilermakers are metal working artisan that are are involved in building very.
Capabilities Statement 1 Presented to: Bechtel Corporation.
29 CFR Hazardous Waste Operations and Emergency Response (Hazwoper) Presented By: Etech Environmental & Safety Solutions, Inc.
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
1. The student will be able to describe: ◦ the history of ASME and the National Board ◦ the history of the National Board Inspection Code ◦ how the NBIC.
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
Training in GSP New approach Who is GSP? Established in member of UPETROM Group HQ located in Constanta Port, Berth 34 Activity: offshore drilling,
ASME Nuclear Conformity Assessment
How much do you do?. What is a Boiler? A boiler is a vessel that is is under pressure and is being heated. The boiler will have a National Board # on.
Hydrogen Workshop for Fleet Operators. Module 3, “Vehicle Operations and Maintenance Facilities”
Gas Transmission Pipelines
COMPANY PROFILE PYRAMID ENGINEERING PRIVATE LTD. THE COMPANY The Company was established in 2007, with a small group to provide Plant Maintenance, Small.
WELCOME TO HADI H AL-HAMMAM GROUP
Permit to Work Procedure Document Number: KOC.SA.004
Contractor Safety Programs Ron Scholtz- REA, CHMM April 8, 2008.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
BUILD WITH US. ™ Contractors
Process Safety Management - Tips for the Little Guy.
Real Estate Principles and Practices Chapter 15 Property Management © 2014 OnCourse Learning.
Architecture & Construction PREPARING FOR COLLEGE, CAREER AND CITIZENSHIP
Mark Studenic Energy Production Superintendent ENERGY PRODUCTION (OPERATIONS)
Wolfenson Electric, Inc.
Company’s short presentation. General presentation We offer a complete package of professional Occupational Health and Safety services; We hold the certification.
Company Profile. EMPIRE SOLUTIONS EXPERIENCE With more than 10 years of experience dedicated to the roofing, energy conservation, corrosion control, painting.
B & M Industrial Services “The Leader in Industrial Contract Services”
Elements of Process Safety Management
BP, OQ & You. 2 Why do we have OQ? Walnut Creek 3 Bellingham Washington.
Certificate in Pipeline Construction, Welding & Inspection LECA LEXTON ENERGY CORPORATE ACADEMY Copyright 2013 Lexton Energy Incorporated PCWI delivered.
Safety and Health Program Section B of the Forest Activities Code.
ORC Asia Pacific Safety, Health & Environment Forum Mind of the Customer Presentation ExxonMobil Scott Arvin Asia Pacific Downstream & Chemical SHE Manager.
Boiler making By Johannes Stefanus Petrus. History What Is A Boilermaker? Boilermakers are metal working artisan that are are involved in building very.
SPED Certification Program September 17, 2003 Houston, TX.
Message of the Managing Director EXCELLENT TRANSPORT NETWORK(ETN) is established in 2007 as one of the specialized Services providing company to Oil and.
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Application – Identifying, Listing Equipment, and Documentation
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
 Athletes and sports competitors compete in athletic events. To be an athlete, one must usually have a high school diploma and some additional training.
Real Estate Principles and Practices Chapter 15 Property Management © 2010 by South-Western, Cengage Learning.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
NEW TANK REPAIR PRODUCTS INSPECTION COATING Global AST Solutions Provider Since Personal Safety Awareness Initiative.
Cost effective while providing customer focused solutions.
Boilers and Unfired Pressure Vessels OSHE 112, Spring 2016 Instructor: Mr. Chris Kuiper, CSP Phone:
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Flow and Control Engineering Supplying Control Valves & Instrumentation to Heavy Industry and Chemical Manufacturing. Multi-Stage Steam & Condensate Control.
21 Curtis Court Building 1 Cartersville, GA Phone: Web Site:
Line Blinding/Blanking Options
PRESENTATION for future Partners.
REFINARY & PETROCHEMICAL
2017 Western States Tripartite Conference
Petroleum Refinery Troubleshooting Part 2
Small Sites Planning & Scheduling
Chapter 9 Safety Permit Systems
Construction (Design and Management) Regulations (CDM) 2015
Subsea 100 Global Services Products Presentation
Fundamentals of PROCESS PLANT PIPING DESIGN
Enter a new career in as few as 16 weeks
Leo Associates Services
Primary Industries Served:
Primary Industries Served:
Reliable Plant Services LLC
Gas Transmission Pipelines
Presentation transcript:

BEST PRACTICES 2014 BEST PRACTICES 2014

About P2S Established in 1985 as SERV-TECH a specialty contractor. Purchased by Phillip Service Corporation in March 1997 and became PSC. Purchased by Fluor in March 2003 and became P2S. Purchased by Fuel Streamers in Purchased by Criner Salt Dome in 2011 and maintained P2S name.

Where we are located Baton Rouge, LA Lake Charles, LA Paramount, CA Deer Park, TX Stafford, TX Salt Lake City, UT

Safety Performance Safety Statistics: (Q1 2014) 2011 TRIR = TRIR = TRIR = TRIR = Days since the Last Recordable 1,882,837 Man-hours since the Last Recordable

CORE P2S Services

Decommissioning Selective equipment removal Equipment relocation Asset Recovery Market evaluations Equipment appraisals Network of brokers Metals recovery Demolition in Active Production Area Rapid response to emergency plant shutdowns Extensive knowledge of working refineries & petrochemical plants in operating units Safety Council Certified Personnel trained to work safely and efficiently Demolition, Dismantling and Asset Recovery Services 18 years without recordable injury Demolition of a 120’ Storage Tank Acid (Alky) Unit Demolition Project

Demolition, Dismantling and Asset Recovery Services Relocation Services Demolition of large can heater Removal of floating roof from inside tank

General Contracting Services Specialist in FCCU, crude, vacuum, coker, alkylation and olefins unit turnarounds: - Turnaround Planning and Scheduling Services - Specialty Exchanger Technology – FastDraw® and FastClean® Tower and Vessel Services including nozzle repairs - Mechanical and Equipment Modifications and Repair - Fabrication and Field Installation - Furnace Repair and Maintenance - Hydro-blasting Services - Civil and Structural Modifications, Heavy Rigging - Structural Steel and Piping Removal and Replacement Management of Additional Turnaround Services Compressor and Pump Repair Insulation and Refractory Repair Scaffolding Catalyst Replacement Support Post Weld Heat Services Painting Instrumentation / Electrical Environmental Services Cleaning and Water Recirculation Services Specialty Turnaround Services 3 years without recordable injury

Exchanger Services P2S has provided a full range of exchanger maintenance services since 1985: FastDraw ® AND Aerial FastDraw ® Heat exchangers (as large as 23 tons) can be extracted in under an hour Reduce down-time of exchangers at the Client’s facilities by cutting extraction time by 80% Reduce safety hazards and damage to bundle tubes FastClean ® Replaces conventional hand-held hydro blasting methods Latest technology with spinning tips Can replace the use of 8 conventional blasters and 24 workers for a single job Reduces cleaning time as much as 75%

Multiple heater and boiler projects executed annually Ethylene Crackers Reformers-Methanol & Hydrogen EPC Crackers Boilers HRSGs & SCRs Process & Waste Heat Recovery Systems Combustion Air Pre-heating Systems Over 1,500 ASME code approved procedures Overlays & vessel repairs Towers and vessels All types of tower internal repairs Level II & III and API 570, 510 inspectors Unfired Pressure Vessels A UPNB S Power Boilers Boiler Field Assembly Power Piping Registration Repairs & Alterations R National Board & ASME Boiler, Pressure Vessel and Piping Code Stamps Welding and Furnace Field Services 9 Years without a recordable injury 40+ years experience of performing alloy welding and heater services – weld rejection rating is less than 2% (2010-Present)

External and internal tower repairs, retro-fit and modifications Expertise in tower blinding, tunneling, re- traying, bubble-cap repairs and tray modifications Vessel and drum internal repairs Cleaning for inspection Internal surface crack repairs Manual weld overlay Nozzle repairs and replacements Pressure vessel modifications Pump replacement Piping, valves and general boilermaker services Tower, Vessel and General Mechanical Services

OTHER P2S SERVICES  Planning/Scheduling  Construction Services  Project Experience  Mechanical Services  Fabrication, Piping and Welding  QA/QC  Project Management

Best Practices Bid/No Bid Process (can we do the work safely) Commercial Review (contract) Operations Review (how will project be executed) Staffing Plan (who will do the work) Site Specific Safety Plan (reviewed with project team) Injury Prevention (Stop Work Authority and Hazard Elimination) Case Management (Only use Occupational Doctors) Light Duty worker program Corporate Participation (site visits, safety funding, etc)

Best Practices Continued : Mentoring Program Short Service Program (New Employee Development) Safety Audits Training (includes P2S web based training) Workforce Development - National Center for Construction Education & Research (NCCER) - Training (crafts, leadership and safety) - Local Safety Council Participation

Hire Process All application done in person. Must complete drug and alcohol test as a condition of employment. Must complete medical questionnaire. Skill levels are verified on the job. Must successfully complete P2S orientations, basic plus, and sites specific training before reporting to the project. Issued General Information and Safety Rules Handbook

Required Training Basic Plus 28 ModulesP2S Orientation. Sites Specific Fork Truck Excavator Torch Cutting Rigging Customized online P2S training 24/7 Safety Leadership for Supervisors

P2S 24/7 Online Training Program

HSE Management System Permits STA Equipment Inspection Tool Inspections Hazard Elimination Training Disciplinary Action Adopt –A- Crew Mentors

Q & A SESSION