FPR Lessons Learned Sterling Field Support Center December 1, 2009.

Slides:



Advertisements
Similar presentations
Chapter 18 On-Board Diagnostics and Scan Tools.
Advertisements

© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
Thermostats. I would recommend that as you proceed through this power point presentation that you refer to your textbook, Unit 14, for some great visuals.
National Weather Service Training Center FPR - E HPD THE NEW GENERATION THE FISCHER-PORTER REBUILD COASTAL ENVIRONMENTAL SYSTEMS.
Q1 Engine turns over normally Q7 cranking problem? NO Not at all or slowly Q2 The headlights Come on and stay on while turning the key Q8 battery problem?
EDE A EDEA Compass Diagnostic guide for EDEA testers 1.
Wiring Color Codes for McLean County 4-H Projects.
Register Digital Multimeter Usage Click Register to begin the course.
Cells have positive and negative electrodes.
Navigation Instructions
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS Charging System tests & Voltage information Checking the charging system with just a volt meter.
Vex 1.0 © Carnegie Mellon Robotics Academy Inc. MULTIMETER Introduction This PowerPoint is a companion to the videos in “Background / Resources / Multimeter.
Register Digital Multimeter Usage Click Register to begin the course.
Circuit Testers and Digital Meters 22 Introduction to Automotive Service James Halderman Darrell Deeter © 2013 Pearson Higher Education, Inc. Pearson Prentice.
OBJECTIVES 1. Create correctly sized connectivity cabling.
Register Digital Multimeter Usage Click Register to begin the course.
Electrical Electricity Fuses Relays Solenoids Electrical Testing
CricketSat Construction. Parts List Monday June14, 2013CricketSat Assembly2.
+ -. Methode Connector  This is the standard USGS connection for the DCP.  Some manufacturers do not recommend using a methode connector. However, we.
Measuring Current and Voltage. Current and Voltage ce/energy_electricity_forces/electric_current_ voltage/activity.shtml.
Series vs. Parallel Circuits Physics Mrs. Tobler.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 2 Module 5 Managing Cisco IOS Software.
Solar Energy Station Directions. Making a Solar-Powered Circuit 1.Make sure your solar panel is in direct sun. 2.Get the clear LED bulb. 3.Use a red jumper.
What Are Circuits? What is a closed circuit?
Doc. Ver. : V1.10 Feb., R&D Center Union Community Co., Ltd. Doc. Ver. : V1.10 Feb., R&D Center Union Community Co., Ltd. Installation &
7.1.3 Student Book © 2005 Propane Education & Research CouncilPage Applying a Systems Approach to Gas Appliance Troubleshooting Troubleshooting.
The Basic Input/Output System Unit objectives: Access the BIOS setup utility, change hardware configuration values, and research BIOS updates Explain the.
Chapter 17 Section 3 (pages )
Procedure 1: Measuring Resistance Procedure 1: Measuring Voltage Procedure 1 – Measuring Current Procedure 2: Voltage Measurement Procedure 1: Multimeter.
Cells in Series and Parallel (page 310) Cells in Series and Parallel Dry cells can be connected together into two basic types of circuits: series.
10.7 Cells in Series and Parallel (page 310). A “dry cell” is another term for a battery. Dry cells can be put together in two ways to change the energy.
Circuit Review of Exit Ticket
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
SCR (Silicon-Controlled Rectifier) Foundations of Technology SCR (Silicon-Controlled Rectifier) © 2013 International Technology and Engineering Educators.
Register Digital Multimeter Usage Click Register to begin the course.
FPR Lessons Learned Sterling Field Support Center As of December, 2009.
Charge and Current: More Practice. A Review of Circuits: Student Learning Goal The student will be able to construct and then compare and contrast.
With a knowledge of how to connect cells in parallel and series, we can figure out how to arrange batteries to deliver a desired voltage, and in some cases,
Connecting solar cells in series
Circuits Circuits are closed paths that form a loop.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Innovation in the service of humanity. Pritpal Singh Professor and Chairman ECE Dept., Villanova University and Percy “Butch” Shadwell Head of Reliable.
G1 to G1b LOW VOLTAGE Schematic to Pictorial. You will now draw the Pictorial by following the Schematic.
COOP H.P.D. Upgrades Michael A. Asmus Regional Data Acquisition Programs Manager NWS, Southern Region Headquarters Fort Worth, TX.
Complex Circuits Notes Series Circuit + Parallel Circuit = Complex Circuit.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
10.3 Electric Potential. Electric Potential Electric potential refers to the amount of energy that electrons possess in a circuit.
TEKS 5.6B Demonstrate that the flow of electricity in circuits requires a complete path through which an electric current can pass and can produce light,
World Leaders in Combustion Management Solutions End User Guide Lockout Codes Pressure Sensors Error Codes Flame Safeguard UV.
Electrical circuits By Caroline.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
Avoid _____________ _____________ _____________ _____________ _____________ _____________.
Circuits. The Basics The Symbols Wire Resistor Light Bulb Plug Battery Open Switch Closed Switch Capacitor.
Figure 3-9: Implementing the Load Diverter CAUTION Do NOT connect the wires to the Diversion Load Controller or the terminal block at this point. IF.
Electrical Testers Basic test equipment used in today’s shops may include an analog type meter, a VAT (Volt-Amp-Tester), DMM (Digital Multimeter),
BASIC ELECTRICITY AND MAGNETISM
Starting System Circuit Operation and Testing
Circuits and Circuit Elements
Lesson 4 Electricity Part 3.
On-Board Diagnostics Chapter 18 Lesson 1.
Circuits and Circuit Elements
Circuits.
FPR Lessons Learned Sterling Field Support Center
Troubleshooting Scott Honaker, N7SS.
Series and parallel circuits
Charge and Current: More Practice
Measuring Voltage Drop and Current
TEKS 5.6B Demonstrate that the flow of electricity in circuits requires a complete path through which an electric current can pass and can produce light,
Presentation transcript:

FPR Lessons Learned Sterling Field Support Center December 1, 2009

Contact Center Inquiries 39 trouble tickets since June 39 trouble tickets since June –Of the 39 tickets, 8 kits were returned to Kansas City

Contact Center Inquiries 39 trouble tickets since June 39 trouble tickets since June –Of the 39 tickets, 8 kits were returned to Kansas City Circuit card/display needed to be reseated Circuit card/display needed to be reseated

Contact Center Inquiries 39 trouble tickets since June 39 trouble tickets since June –Of the 39 tickets, 8 kits were returned to Kansas City Circuit card/display needed to be reseated Circuit card/display needed to be reseated Defective switch Defective switch

Contact Center Inquiries

Several tickets related to the assembly instructions Several tickets related to the assembly instructions Feedback from the field resulted in many early changes to the instructions Feedback from the field resulted in many early changes to the instructions

Contact Center Inquiries Categories: Categories: –Settings –Installation –Error Codes –Data Issues –Logger Issues

Common Issues Settings Settings –Does the Site ID need to be 8 digits?

Common Issues Settings Settings –Does the Site ID need to be 8 digits? YES, the Site ID MUST be 8 digits. The third and fourth digits will be zeros YES, the Site ID MUST be 8 digits. The third and fourth digits will be zeros

Common Issues Settings Settings –Does the Site ID need to be 8 digits? YES, the Site ID MUST be 8 digits. The third and fourth digits will be zeros YES, the Site ID MUST be 8 digits. The third and fourth digits will be zeros –Does the data logger lose settings when the battery is disconnected?

Common Issues Settings Settings –Does the Site ID need to be 8 digits? YES, the Site ID MUST be 8 digits. The third and fourth digits will be zeros YES, the Site ID MUST be 8 digits. The third and fourth digits will be zeros –Does the data logger lose settings when the battery is disconnected? NO, the settings are saved to memory NO, the settings are saved to memory

Common Issues Installation Installation –Which way should the load cell be installed?

Common Issues Installation Installation –Which way should the load cell be installed? It can be installed either parallel or perpendicular to the base It can be installed either parallel or perpendicular to the base

Common Issues Installation Installation –Which way should the load cell be installed? It can be installed either parallel or perpendicular to the base It can be installed either parallel or perpendicular to the base –Does the load cell require locking washers?

Common Issues Installation Installation –Which way should the load cell be installed? It can be installed either parallel or perpendicular to the base It can be installed either parallel or perpendicular to the base –Does the load cell require locking washers? No, it does not No, it does not

Common Issues Error Codes Error Codes –What is a hardware error #4207?

Common Issues Error Codes Error Codes –What is a hardware error #4207? This occurs when the SD card is removed incorrectly after downloading data This occurs when the SD card is removed incorrectly after downloading data

Common Issues Data Issues Data Issues –The data shows large swings in data?

Common Issues Data Issues Data Issues –The data shows large swings in data? Check the base itself: flexors, plunger position, calibration, post not touching lower assembly Check the base itself: flexors, plunger position, calibration, post not touching lower assembly

Common Issues Data Issues Data Issues –The data shows large swings in data? Check the base itself: flexors, plunger position, calibration, post not touching lower assembly Check the base itself: flexors, plunger position, calibration, post not touching lower assembly –Bent flexors

Common Issues Data Issues Data Issues –The data shows large swings in data? Check the base itself: flexors, plunger position, calibration, post not touching lower assembly Check the base itself: flexors, plunger position, calibration, post not touching lower assembly –Bent flexors –Uneven base

Common Issues Data Issues Data Issues –The data shows large swings in data? Check the base itself: flexors, plunger position, calibration, post not touching lower assembly Check the base itself: flexors, plunger position, calibration, post not touching lower assembly –Bent flexors –Uneven base –Recalibration

Common Issues Data Issues Data Issues –Data lost because of power resets?

Common Issues Data Issues Data Issues –Data lost because of power resets? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, blockage on the solar panel Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, blockage on the solar panel

Common Issues Data Issues Data Issues –Data lost because of power resets? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, blockage on the solar panel Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, blockage on the solar panel –Connection at the terminal was loose

Common Issues Data Issues Data Issues –Data lost because of power resets? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, blockage on the solar panel Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, blockage on the solar panel –Connection at the terminal was loose –Bad battery

Common Issues Data Issues Data Issues –Data lost because of power resets? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, blockage on the solar panel Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, blockage on the solar panel –Connection at the terminal was loose –Bad battery –Loose battery cable

Common Issues Data Issues Data Issues –Data are showing decreases/increases ?

Common Issues Data Issues Data Issues –Data are showing decreases/increases ? Check the oil level Check the oil level

Common Issues Data Issues Data Issues –Data are showing decreases/increases ? Check the oil level Check the oil level –No oil therefore precipitation was evaporating

Common Issues Data Issues Data Issues –Data are showing decreases/increases ? Check the oil level Check the oil level –No oil therefore precipitation was evaporating –No oil with the antifreeze therefore moisture was being absorbed from the atmosphere

Common Issues Logger Issues Logger Issues –The logger would not wake up and a red status light was flashing?

Common Issues Logger Issues Logger Issues –The logger would not wake up and a red status light was flashing? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, solar panel Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, solar panel

Common Issues Logger Issues Logger Issues –The logger would not wake up and a red status light was flashing? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, solar panel Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, solar panel –Solar panel was cracked

Common Issues Logger Issues Logger Issues –The logger would not wake up and a red status light was flashing? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, solar panel Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram, solar panel –Solar panel was cracked –Bad grounding wire

Common Issues Logger Issues Logger Issues –The logger locked up?

Common Issues Logger Issues Logger Issues –The logger locked up? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram

Common Issues Logger Issues Logger Issues –The logger locked up? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram –Circuit card/display had to be reseated

Common Issues Logger Issues Logger Issues –The logger was unable to be programmed?

Common Issues Logger Issues Logger Issues –The logger was unable to be programmed? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram

Common Issues Logger Issues Logger Issues –The logger was unable to be programmed? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram –Defective switch

Common Issues Logger Issues Logger Issues –Display was coming on by itself?

Common Issues Logger Issues Logger Issues –Display was coming on by itself? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram

Common Issues Logger Issues Logger Issues –Display was coming on by itself? Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram Check the connections, wires, cables, terminal strip, voltage on the battery, wiring diagram –One wire at the terminal strip was loose

Contact Information SFSC Contact Center Monday – Friday 8AM-5PM Eastern Time (703) Main Line (703) Backup Line