Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

Grade Separation (GS-16) Project. Project Location - Bensenville N.
Titusville to Edgewater Bike Loop PD&E Study
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
West Contra Costa Unified School District
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Santa Maria River Bridges Widening. Project Location.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
RED LIGHT CAMERAS CITY COUNCIL WORKSHOP NOVEMBER 29, 2011.
CALTRANS DISTRICT 7’S CAPITAL IMPROVEMENT PROGRAM Providing a safe, sustainable, integrated and efficient transportation system to enhance California’s.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
WVDOT GTI SECTION Status Update for Miss Utility.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
Current Construction Projects Major Projects Pinellas County.
Some things can’t wait for traffic Capital Beltway HOT Lanes – Our Challenges & Successes Herb Morgan Vice President Fluor Infrastructure.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
Denver Area Transportation Issues and the Future of Transit Development in the Denver Metro Area Sertoma Club January 12, 2012.
0 Regional Measure 2: Capital Program Update May 12, 2010 Programming and Allocations.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA.
PROJECT 123(14) LOR PID INTERCHANGE IMPROVEMENT PARTNERING RE-CONNECT MEETING NOVEMBER 19, 2015.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
DESIGN-BUILD DEMONSTRATION PROGRAM California Department of Transportation District 4 Calmentor Meeting January 27, 2011 Presented by:Joseph Dongo Presented.
Transportation Projects City Council Workshop May 14, 2013.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
PROJECT OVERVIEW. 2 Green Line Extension Project 3 College Ave Ball Sq Lowell St Gilman Sq Lechmere Union Sq Washington St.
Program Manager Administrator
I-75 South Metro Managed Lanes. Project Description Two reversible toll lanes along I-75 South 12 miles from SR 155 to SR 138 Anticipated opening date.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Public Works Capital Projects FY Projects Completed FY 2014.
Visit Our Website at: Click to edit Master title style.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
Welcome!. OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville,
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
Regional Roads Committee
Hays County Commissioners Court
Infrastructure Investment Needs
Highway 14 – Owatonna to Dodge Center District 6 Update
CR184 (Quintette Road) Bridge #480045
US26: Cornelius Pass Rd -185th Ave
Florida Transportation Commission FY 2009
North Main Street Intersection Improvements at Route 460 Bypass
Fort Worth Alliance Airport Runway Extension/
I-69 Southwest/I-610 West Loop Interchange Reconstruction
STATE SUEE AND ONE WAY CORRIDORS
Background Incorporated as a city September 12, 1960, the City of Manvel was first settled in 1857 twenty miles southwest of Houston. During the 1960’s.
Volusia TPO Board Meeting January 22, 2013
Contract 60X10 Informational Meeting Weber I-55
Comprehensive Transportation Plan
US 1 Project “A” FM No.: Work Mix: Intersection Improvement At: Park Ave. Phase: Design Year Funded: 2020 Cost: $200,000.
Current and proposed HOT facilities update
Metropolitan District | mndot.gov
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014

91 Project – Fast Facts Among the nations worst commutes $1.4 billion project – funded by Federal, State and Local 16,200 jobs created, 4,600 construction jobs First tolled express lanes in Riverside 199 total parcels acquired Travel time savings – average 12 min./day regular lanes; 78 min/day express lanes RIVERSIDE COUNTY TRANSPORTATION COMMISSION

Milestone Dates May 2013: Awarded design-build contract July 2013: Secured funding, closed bond sale Dec. 2013: Held groundbreaking July 2014: Full construction began 2017: Projected date for lanes to open RIVERSIDE COUNTY TRANSPORTATION COMMISSION

By the Numbers Building 11 new bridges Widening 21 existing bridges Improving 6 interchanges and 22 intersections Building 95 retaining walls (1 million square feet) Building 287,000 square feet of sound walls Pouring 210,000 cubic yards of pavement Adding 90,000 linear feet of new drainage Relocating 92 full utility systems RIVERSIDE COUNTY TRANSPORTATION COMMISSION

Project Map RIVERSIDE COUNTY TRANSPORTATION COMMISSION

Location: Bridge 28 (EB 91 to SB I-15 Bent 3 & 4 – Facing Northwest Description: Bridge 28 Falsework tunnel over BNSF tracks at W. Porphyry

Location: Bridge 28 (EB 91 to SB I-15 Bent 3 – Facing Northwest Description: Falsework installations up to Bent 3

Location: Bridge 23 (EB 91 to SB I-15 Connector) Approach (Old 2 nd. St.) – Facing East Description: Worksite for approach to Bridge 23 at E. Grand Blvd.

Location: Bridge 25 (SB I-15 to WB SR91 Connector) Approach to Abut 1 – Facing East Description: Retaining Wall 219 installation up to Bridge 25, Abutment 1

Location: Bridge 25 (SB I-15 to WB SR91 Connector) – Facing East Description: Overlooking the Bridge 25 worksite.

Location: Bridge 25 (SB I-15 to WB SR91 Bent 3 – Facing North Description: Drilling for CIDH pile at Bent 3 adjacent to BNSF falsework tunnel.

Location: Magnolia Rd. Overcrossing – Facing South Description: Aggregate base installation along NB I-15 for median widening.

Location: ROW Ellestad - Facing Northeast Description: Paving and sitework around new building face.

Location: ROW 1195 Pomona Rd. (Tressen ) – Facing South Description: Building demolition

Location: ROW Dvorak & Payne - Facing North Description: Demolition of front portion of building structure

Location: Green River Santa Ana River Trail Area – Facing East Description: Clearing for temporary parking installations at Santa Ana River Trail area

Location: Bridge 2 (WB 91/Green River Bent 5 – Facing Northeast Description: CIDH Pile Installation from work platfrom at Bent 5.

Location: Bridge 2 (WB 91/Green River West Prado Rd. - Facing Southeast Description: Falsework installations from BNSF ROW to Bent 4 Column.