1/22 MOLLER Juliette M. Mammei. 2/22 Working Groups Polarized Source Hydrogen Target Spectrometer Integrating Detectors Tracking Detectors Polarized Beam.

Slides:



Advertisements
Similar presentations
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky for the JLab Hall A Collaboration College of William and Mary, Williamsburg VA.
Advertisements

Patricia Aguar Bartolomé Institut für Kernphysik, Universität Mainz PSTP 2013 Workshop, Charlottesville 11th September 2013.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Jim Stewart (JLAB) Internal Magnet Review May 2009.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
MICE LH2 Operating Parameters Mary Anne Cummings MICE October ‘02 LBL Oct. 24, 2002.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
Parity-Violating Electron Scattering Jeff Martin University of Winnipeg.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Progress on Photon Beam and Simulation Part 1: active collimator Part 2: physics simulations Richard Jones, University of Connecticut GlueX collaboration.
Tagging spectrometer and photon beamline Review January 23-24, Response to Questions Bremsstrahlung Tagging Spectrometer and Photon Beam Review.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Prajwal T. Mohan Murthy Laboratory for Nuclear Science, MIT νDM Group Spin-Light Polarimeter for the Electron Ion Collider EIC Users Meeting 2014 Jun 2014.
PN12 Workshop JLab, Nov 2004 R. Michaels Jefferson Lab Parity Violating Neutron Densities Z of Weak Interaction : Clean Probe Couples Mainly to Neutrons.
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
MOLLER Spectrometer Update Juliette M. Mammei. O UTLINE The Physics – Search for physics beyond the Standard Model – Interference of Z boson with single.
Thomas Jefferson National Accelerator Facility Page 1 CD Workshop Dec 2-3, 2009 CLAS12 Central Detector Overview and Integration David Kashy Hall B Lead.
Beijing, Feb 3 rd, 2007 LEPOL 1 Low Energy Positron Polarimetry for the ILC Sabine Riemann (DESY) On behalf of the LEPOL Collaboration.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
Collimator June 1-19, 2015HUGS The collimator is placed about 85 cm from the target and intercepts scattered electrons from 0.78° to 3.8° Water cooled.
Opportunities for Precision Measurements, New Physics Searches & Low Energy Fixed Target Expts at a Modified “FEL” Accelerator Complex R. D. Carlini 12/7/2011.
Nuruzzaman ( Hampton University Group Meeting 1 st November 2011 Beamline Optics Using Beam Modulation for the Q-weak Experiment.
MOLLER Spectrometer Update Juliette M. Mammei. Future Priorities (from last meeting) Physicist input to engineering (highest priority) o Magnetic force.
Normalization of the NPDGamma Experimental Data F. Simmons, C. Crawford University of Kentucky, for the NPDGamma collaboration Background: NPDγ Experiment.
MOLLER Spectrometer Update Juliette M. Mammei. I.Large phase space of possible changes A.Field (strength, coil position and profile) B.Collimator location,
Spectrometer Group Update. Spectrometer Meetings Director’s Review – January 2010 Advisory Group Meeting – August 2010 Collaboration Meeting – December.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
May 17, 2006Sebastian Baunack, PAVI06 The Parity Violation A4 Experiment at forward and backward angles Strange Form Factors The Mainz A4 Experiment Result.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
October 2005 Qweak Collaboration Meeting Detailed Design of Shield House and Collimators wrt Backgrounds Yongguang Liang Just getting started – will probably.
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
CEBAF The Continuous Electron Beam Accelerating Facility (CEBAF) at JLab in Newport News, Virginia, is used to study the properties of quark matter. CEBAF.
Polarimetry Report Sabine Riemann on behalf of the DESY/HUB group January 24, 2008 EUROTeV Annual Meeting, Frascati.
SLAC, September 25, 2009 Searching for a U -boson with a positron beam Bogdan Wojtsekhowski Thomas Jefferson National Accelerator Facility  The light.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
MOLLER Spectrometer Update Juliette M. Mammei. O UTLINE The Physics – Search for physics beyond the Standard Model – Interference of Z boson with single.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
The Q Weak Experiment Event tracking, luminosity monitors, and backgrounds John Leacock Virginia Tech on behalf of the Q Weak collaboration Hall C Users.
Hall C - 12 GeV pCDR Max. Central Momentum 11 GeV/c 9 GeV/c Min. Scattering Angle 5.5 deg 10 deg Momentum Resolution.15% -.2% Solid Angle 2.1 msr 4.4 msr.
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
Moller Polarimeter Q-weak: First direct measurement of the weak charge of the proton Nuruzzaman (
12 GeV MOLLER U PDATE TO THE H ALL A C OLLABORATION Juliette M. Mammei.
Status of Engineering Preparations for CD2/3A nEDM Collaboration Meeting – MIT Bates Jan Boissevain November 2, 2007.
John Leacock April 20, 2009 Qweak: A Precision Test of Standard Model and Determination of Weak Charge of the Proton Four fundamental interactions of the.
Mitglied der Helmholtz-Gemeinschaft Summary of the target session of the IEB Workshop June 19, 2015 | Alexander Nass.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
M. Sullivan Apr 27, 2017 MDI meeting
IHEP group Shashlyk activity towards TDR
Polarimetry Ken Livingston Sept 2012
Why Consider a Toroid Spectrometer Built Around Existing Hardware?
The G0 experiment at JLAB
Particle Identification in LHCb
Upgrade magnets and power supplies
Hall A Infrastructure and the Moller Parity Experiment “AMPEX”
HALL-A Upgrade Introduction MAD spectrometer Background simulation
QWeak Collaboration Meeting
Polarized Internal Gas Target in a Strong Toroidal Magnetic Field
Upgrade magnets and power supplies
Update on JLEIC Interaction Region Design
Recent results from BLAST detector
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

1/22 MOLLER Juliette M. Mammei

2/22 Working Groups Polarized Source Hydrogen Target Spectrometer Integrating Detectors Tracking Detectors Polarized Beam Instrumentation Polarimetry Electronics/DAQ Simulations Analysis Hall A Collaboration Winter 2012 Meeting Supergroup

3/22 Simulation Hall A Collaboration Winter 2012 Meeting Large group that meets regularly TOSCA and GEANT4 applications Continually improving the usability of the GEANT4 simulation o Adding generators o Improving functionality o Improvements to the radiative effects

4/22 Detector Array Roman Pots (for tracking detectors) Scattering Chamber Target Hybrid Torus Upstream Torus Incoming Beam Collimators Simulation Projects 28 m Hall A Collaboration Winter 2012 Meeting D etector geometry Collimators Target length Backgrounds Spectrometer o Optics o Sensitivity study o Magnetic forces

5/22 Detectors Geometry Define rings Quartz shape, size Quartz housing Light guide shape, size Endcap shape, size Reflector length, angle Optics Refractive index Cerenkov angle TIR critical angle Tolerance to preserve TIR Baseline design from Qweak scanner detector Hall A Collaboration Winter 2012 Meeting

6/22 Detectors Hall A Collaboration Winter 2012 Meeting

7/22 Detectors Hall A Collaboration Winter 2012 Meeting

8/22 Detectors Hall A Collaboration Winter 2012 Meeting

9/22 Detectors Prototypes! Hall A Collaboration Winter 2012 Meeting

10/22 Spectrometer Ongoing simulation and pre-R&D work TOSCA and GEANT4 applications o Conductor size o Optics optimization o 3-coil option o Vacuum vs. air Interfacing with MIT engineers o Jason Bessuille, Ernie Ilhoff, Jim Kelsey, Cathy Moran (designer) o Design (conductor size, electrical and water connections) o Water-cooling o Supports Hall A Collaboration Winter 2012 Meeting Have nominal designs, but choices to make

11/22 Spectrometer 4C4R4L 1AR1AL 1BL1BR 2L 3L 2R 3R Hall A Collaboration Winter 2012 Meeting

12/22 TOSCA → Solidworks Coil Package with single out-of-plane bends Volume comparison of coils. Only the differences are shown. Blue = native SWX model, brown = imported model Note: Imported coils have dual s-bends; Native SWX coils are changed to single s-bends Hall A Collaboration Winter 2012 Meeting

13/22 Cooling Circuits Coolant flow rate A/cm A/cm A/cm 2 Hall A Collaboration Winter 2012 Meeting

14/22 Qweak Coil & Carrier Hall A Collaboration Winter 2012 Meeting

15/22 QWEAK Toroid Assembly QTOR Assembly (with left frame removed for clarity) Hall A Collaboration Winter 2012 Meeting

16/22 MOLLER Toroid Assembly Service feedthru ports (power and cooling) Guide Rails ee and ep tracks In-vacuo coils Standard 3/8 thk 46”diameter 316 Steel Pipe Single module, crane-able assembly, with very limited access during runs Hall A Collaboration Winter 2012 Meeting

17/22 Spectrometer Hall A Collaboration Winter 2012 Meeting 50x deflection scale

18/22 Plan going forward Decide on a conductor type Discuss Hall A infrastructure to develop conceptual system design including pumps, chillers, heat exchangers and power supply Iterate between TOSCA and FEA simulations with the modified coils (single s-bends) and new choice of conductor Involve potential coil vendors at this stage In parallel, review in-vacuum vs. out-of-vacuum options, and 2-coil vs. 3-coil configurations Once a mounting configuration is established, start designing support frame, coil package details, and coil carriers in parallel. Magnet engineering review in spring Hall A Collaboration Winter 2012 Meeting

19/22 Target ρ fluctuations < 26 ppm ½ Qweak 2x power CFD used to model the highly successful Qweak target CFD-FAC under development for R&D o Hall C target o highest power PV suitable target Hall A Collaboration Winter 2012 Meeting

20/22 Polarized Beam Source and Measurement Source work o Pockels vs. Kerr cell o Two cells o Spot size monitoring DAQ –upgrades for > 30 Hz flip rates (>1 MHz!) Polarimetry upgrades o Compton Electron detector Photon detector Improved analysis o Møller Upgraded high field polarimeter Atomic hydrogen Møller (Mainz for P2) 0.4% accuracy or better Polarization Positions, angles, energy, intensity 2 nd order beam properties 0.4% accuracy or better Polarization Positions, angles, energy, intensity 2 nd order beam properties Hall A Collaboration Winter 2012 Meeting

21/22 Auxiliary Detectors Hall A Collaboration Winter 2012 Meeting Tracking – GEMs (Q 2, beam backgrounds, etc.) Luminosity – Quartz (target density and beam fluctuations, electronics noise) Pion Backgrounds – Pb-glass (Pions and other hadron backgrounds)

22/22 Summary Much progress on o Simulation o Spectrometer o Detectors Ramping up o Source o Target o Polarimetry o Auxiliary detectors Hall A Collaboration Winter 2012 Meeting