Etienne CARLIER AB/BT/EC

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
N. Voumard, AB-BT-EC LBDS Audit, CERN LBDS Trigger Signal Distribution Trigger Synchronization Unit (TSU) Trigger Fan Out (TFO) Power Trigger Unit.
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
Injection Test Meeting Tuesday 26th August Controls Issues/Results Injection Kickers Etienne CARLIER AB/BT.
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
Failure mode impact studies and LV system commissioning tests
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
LBDS Kicker Electronic and Slow Control Etienne CARLIER AB/BT/EC.
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
LHC Beam Dumping System Status and Readiness for LHC Run II Evian Workshop 2-4 June 2014 Nicolas Magnin – TE/ABT/EC On behalf of TE/ABT team. Thanks to.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
The LHC injection systems located in points 2 and 8 are comprised of several elements common to the LHC ring and the downstream ends of the TI 2 and TI.
LBDS Power Triggering Etienne CARLIER & Jean-Louis BRETIN AB/BT/EC.
1N.Voumard, AB/BT/ECLBDS Audit, CERN 2008 Presentation of the Beam Energy Tracking System Definition : The Beam Energy Tracking System (BETS) monitors.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
LBDS overview on system analysis and design upgrades during LS1 Roberto Filippini, Etienne Carlier, Nicolas Magnin, Jan Uythoven CERN Workshop Machine.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
R.Giachino / M.Albert Be/op 12 th March 2012 LHC Machine check out 1v1.
LBDS KICKERS MPP workshop - Annecy Nicolas Magnin TE-ABT-EC.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
V. Kain AB/OP1Sep 12, 2007 Summary of Discussion on Injection Protection Issues Injection Protection Issues – meeting 22 nd of June V. Kain, A. McPherson,
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
What will we do for Beam Preparation: Injection and Beam Dump Jan Uythoven Thanks to M.Barnes, E.Carlier, L.Ducimetière, B.Goddard, R.Jones, Y.Kadi, V.Kain,
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Kicker generator and controls installation in ECA5? Etienne CARLIER
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.
1 Reliability and Availability of the Large Hadron Collider (LHC) MachineProtection System Jan Uythoven CERN, Geneva, Switzerland Thanks to R. Schmidt,
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
1 Will We Ever Get The Green Light For Beam Operation? J. Uythoven & R. Filippini For the Reliability Working Group Sub Working Group of the MPWG.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
3 rd March Extended LTC Injection and Beam Dump Brief overview of system components and dependencies Breakdown of tests foreseen in preparation.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
18 July Reminder Dilution kicker system MKB is staged (2H, 2V) –Limits extracted intensity at 7 TeV to 50% of nominal –For 25ns spacing, this is.
Dry runs and cold checkout Markus Albert, Reyes Alemany, Rossano Giachino, Delphine Jacquet, Verena Kain, Belen Salvachua Ferrando, Matteo Solfaroli Camillocci.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
IPOC Software for LBDS Data Acquisition & Analysis LBDS Technical Audit CERN - AB/BT/EC - N.Magnin.
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
LBDS MKD tracking related problems. Outline tracking problems: Exchange of MKD compensation/principal PS Same BETS limit for all generators.
FCC related MDs. Faster LHC ramp MD Brennan Goddard; Matteo Solfaroli Camillocci; Wolfgang Bartmann; Florian Burkart; Francesco Maria Velotti; Mike Lamont;
Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
Beam Interlock System SPS CIBU Connection Review
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Dependability Requirements of the LBDS and their Design Implications
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Outcome LBDS Dry Run – week 7
LHC Beam Dumping System Reliability Run Summary
MKD/MKB Review Meeting Scope and Definition
Jan Uythoven For discussion
LHC Risk Review: Kicker Magnet Reliability
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Chamonix 2006 – LHC Project Workshop
Machine Protection System Commissioning plans
1v1.
The LHC Beam Interlock System
Interlocking strategy
Presentation transcript:

Etienne CARLIER AB/BT/EC Arming and Re-arming Etienne CARLIER AB/BT/EC

Outline Readiness LBDS Kicker Arming… Re-arming General Sequencing TSU

LBDS Readiness State Transition Ready State

LBDS Check

Dump Action

Kicker System Readiness

Kicker State

State Control & Surveillance Hierarchy Generator control level Stage detailed interlock Extraction Kicker Summary LBDS Kicker Summary

LBDS Arming General Re-arm/check individually each subsystems. TSU re-arming will ne possible only once all subsystems are READY Re-arm BETS: will be READY if real-time tracking is in RECORDING Re-arm IPOC: will be READY if FAAS is in ACQUIRING state Re-arm KICKER (MKD & MKB): will be READY if All generators are ON Feedback Tracking stage is OK Internal post operational check stage is OK Check LASS: will be READY if machine is closed (no re-arm) Check Re-trigger: will be READY if both re-trigger lines are closed and connection to TSU OK (no re-arm) Re-arm and Lock TSU All TSU inputs OK Locked on revolution frequency

LBDS Arming Sequencing 1. Individual sub-systems re-arming 2. Set Injection Permit to FALSE 3. Mask LBDS Ready to TRUE for 500ms 4. Wait for Beam Permit TRUE from BIS 5. Re-arm & lock TSU 6. Release LBDS Ready Mask 7. Set Injection Permit to TRUE

TSU Arming Flowchart